Home Quality Mark cost output
The Home Quality Mark One, Technical Manual SD239, England, Scotland & Wales, published by BRE in 2018 defines cost output as a metric that is:
…unique to the HQM and is calculated by the HQM energy engine using modelled outputs from approved building energy calculation software, against which cost credits are awarded. It is an output based on the energy cost factor metric taken from the SAP assessment. When calculating the cost output, a home’s actual performance is compared against the relevant national Building Regulations compliance standard (i.e. a baseline), and the comparison is expressed as a percentage improvement. The percentage improvement is then compared against a best practice performance level for modelled stock of house types, and then ‘translated’ into a cost output. |
A description of how to obtain a home’s cost output is summarised in the Methodology section on P112 of the Technical Manual and more detail about how the cost output is defined and calculated is provided in Guidance note 28 available at: https://kb.breeam.com/knowledgebase/gn28-home-quality-mark-hqm-energy-and-cost-methodology-guidance-note-draft/
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.