File:Item 23160.png
Drawings like this one from an intermediate planning and design report suggested that the [Swiss Re] tower would enhance the skyline by completing the cluster of towers in the Citys northeastern quadrant. Foster + Partners, Swiss Re House, Record Set of Presentation, 19th and 21st October 1998, 1998: Consolidation of the City Cluster of High Buildings. Courtesy of Foster + Partners.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 09:05, 23 January 2023 | 3,452 × 2,276 (9.19 MB) | Archiblog (Talk | contribs) | (Drawings like this one from an intermediate planning and design report suggested that the [Swiss Re] tower would enhance the skyline by completing the “cluster” of towers in the City’s northeastern quadrant. Foster + Partners, Swiss Re House, Recor) |
- Edit this file using an external application (See the setup instructions for more information)
File usage
The following 5 pages link to this file:
Featured articles and news
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.