File:EstuaryAfonTeifi.jpg
Mat Fascione, Geograph, source: https://www.geograph.org.uk/photo/6359286 Not for reuse. Boats on the estuary of the Afon Teifi The Patch Caravan Park at Gwbert is on the opposite side of the river. The River Teifi (Afon Teifi) has a total length of 73 miles (117 km). It forms the boundary for most of its length between the counties of Ceredigion and Carmarthenshire, and for the final 3 miles (4.8 km), the boundary between Ceredigion and Pembrokeshire. It flows into Cardigan Bay near the town of Cardigan (Aberteifi).
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 19:51, 17 November 2020 | 800 × 590 (109 KB) | Editor (Talk | contribs) | (Mat Fascione, Geograph, source: https://www.geograph.org.uk/photo/6359286 Not for reuse. Boats on the estuary of the Afon Teifi The Patch Caravan Park at Gwbert is on the opposite side of the river. The River Teifi (Afon Teifi) has a total length of 73 m) |
- Edit this file using an external application (See the setup instructions for more information)
File usage
The following page links to this file:
Featured articles and news
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.