File:BasculeCorpGrimsby.jpg
Corporation Bridge, Grimsby cc-by-sa/2.0 - David Hebb, Geograph, source: geograph.org.uk/p/1791656 Not for reuse. An Electrically Powered Scherzer Rolling Lift Road Bridge built 1925 by Alfred C. Gardner Docks Engineer to the London North Eastern Railway. Contractor Sir William Arrol & Co, of Glasgow, for the Grimsby Corporation, to replace an earlier Swing Bridge. A Grade II Listed Building.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 16:56, 20 May 2021 | 1,024 × 767 (376 KB) | Editor (Talk | contribs) | (Corporation Bridge, Grimsby cc-by-sa/2.0 - © David Hebb, Geograph, source: geograph.org.uk/p/1791656 Not for reuse. An Electrically Powered Scherzer Rolling Lift Road Bridge built 1925 by Alfred C. Gardner Docks Engineer to the London North Eastern Railw) |
- Edit this file using an external application (See the setup instructions for more information)
File usage
The following page links to this file:
Featured articles and news
Mental Health Awareness Week with ABS
Architects Benevolent Society programme of activity.
CLC publishes domestic retrofit competency framework
Roadmap of Skills for net zero.
May 13-19: Moving more for our mental health.
Understanding is key to conservation.
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.