Selection criteria
Selection criteria (sometimes referred to as award criteria or evaluation criteria) are lists of items against which a prospective supplier can be assessed before a selection is made and a contract awarded. They might also be used to help identify suitable individuals when seeking new employees.
Defining specific selection criteria can help an employer agree among themselves the characteristics that they value. This helps ensure they identify the best value submission, rather than simply the lowest price submission. When the employer is evaluating submissions, referring to the selection criteria, or perhaps even giving marks against each criteria can help focus the assessment and prevent it being dominated by personal preferences or by forceful individuals.
Informing applicants what the selection criteria are can create a fairer process, enabling applicants to consider in advance whether they are suitable, and helping them tailor their submissions. It also makes the application process more transparent and so less open to challenge.
Assessment criteria will vary significantly depending on the nature of the role; whether it is for a consultant, contractor, other supplier or employee, however, some typical criteria might include:
- Price.
- Relevant experience.
- Understanding of the requirements.
- Past performance.
- Technical skills.
- Availability.
- Management skills.
- Proposed methodology.
- Compliance with the requirements of the submission process.
- Financial standing.
The criteria may be weighted to reflect how important they are to the client. Each submission is then given a score against each criteria. Submissions might be scored by a number of assessors, or different assessor might score different criteria.
The overall score for a submission can be calculated by multiplying the score for each criteria by its weighting and then adding together or averaging the results for each assessor. Where there are very different scores between assessors, a meeting might be held to discuss the reasons.
More complex assessments might include additional benchmarks. For example, there may be certain criteria that are straight-forward pass/fail issues. There may also be criteria for which a very low rating is unacceptable irrespective of scores for other criteria.
[edit] Related articles on Designing Buildings Wiki
- Accelerated debrief.
- Adversarial behaviour in the UK construction industry.
- Appointing consultants.
- Auction theory.
- Best value.
- Best value procurement.
- Bid evaluation.
- Competitive procedure with negotiation.
- Due diligence when selecting contractors or subcontractors.
- Innovative partnership procedure.
- Invitation to tender.
- Most Economically Advantageous Tender (MEAT).
- Pre qualification questionnaire.
- Procurement route.
- Tender evaluation.
- Tender price appraisal.
- The benefits of e-procurement in construction.
Featured articles and news
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.