Consequential improvements in construction
Consequential improvements refer to energy efficiency improvements that are consequential to changes to a building, which are required by regulation 28 of the Building Regulations (guidance for which appears in Section 6 of Approved document L2B: Conservation of fuel and power in existing buildings other than dwellings) to make the whole building comply with Part L of the Building Regulations
The regulation relates to proposed works to existing buildings (other than dwellings) with a total useful floor area of over 1000m2, and include:
- An extension.
- Installation of new fixed building services (other than renewable energy generators).
- Increasing the capacity of fixed building services (other than renewable energy generators).
Where such works are proposed, additional consequential improvements will be required to the extent that the necessary improvements are technically, functionally and economically feasible.
In most circumstances, this means that the payback period for the consequential improvements required does not exceed 15 years (or less if the expected life of the building is less than 15 years).
Consequential improvements could include:
- Upgrading heating, cooling or air handling systems.
- Upgrading lighting systems.
- Installing energy metering.
- Upgrading thermal elements.
- Replacing windows.
- On-site energy generation.
- Applying measures proposed in a recommendations report accompanying an Energy Performance Certificate.
In the case of an extension, the regulation can be complied with if the value of consequential improvements is not less than 10% of the value of the principal works.
In the case of changes to fixed building services, the building fabric should be improved so that the energy consumption of the services is not excessive, and additional consequential improvements must be made as described in the list above. Improvements to the building fabric in this case do not count towards the value of the consequential improvements. NB This does not apply if the services capacity is increased to supply a new extension rather than to improve services to an exiting space.
For changes to fixed building services, improvements to the building fabric are considered technically, functionally and economically feasible where the existing thermal elements have a U-value lower than those set out in the approved document. In the case of cooling, both the U-values of thermal elements and the solar gains of windows are set out, and in the case of lighting, an effective lamp efficacy is set.
Once the works are complete, the building owner should be provided with sufficient information to operate the building efficiently. This can be done by preparing a building log book.
NB Proposals to extend requirements for consequential improvements to dwellings (as part of the introduction of the green deal) were finally dropped by Communities Secretary Eric Pickles at the end of 2012.
[edit] Related articles on Designing Buildings
- Building log book.
- Building Regulations.
- Energy efficiency of traditional buildings.
- Energy performance certificates.
- Energy targets.
- Environmental plan.
- Green Deal.
- Principal works.
- Sustainability.
- U-Value.
[edit] External references
- Approved document L2B: Conservation of fuel and power in existing buildings other than dwellings.
Featured articles and news
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).
Ebenezer Howard: inventor of the garden city. Book review.
The Grenfell Tower fire, eight years on
A time to pause and reflect as Dubai tower block fire reported just before anniversary.
Airtightness Topic Guide BSRIA TG 27/2025
Explaining the basics of airtightness, what it is, why it's important, when it's required and how it's carried out.
Construction contract awards hit lowest point of 2025
Plummeting for second consecutive month, intensifying concerns for housing and infrastructure goals.
Understanding Mental Health in the Built Environment 2025
Examining the state of mental health in construction, shedding light on levels of stress, anxiety and depression.
The benefits of engaging with insulation manufacturers
When considering ground floor constructions.
Lighting Industry endorses Blueprint for Electrification
The Lighting Industry Association fully supports the ECA Blueprint as a timely, urgent call to action.