Arbitration v Adjudication
Construction contracts usually provide for disputes to be dealt with by agreed dispute resolution procedures. Arbitration and adjudication are two commonly-adopted forms of alternative dispute resolution ( ADR - that is, they do not involve litigation). Although the procedures adopted are similar, they should not be confused.
Arbitration is a procedure in which both sides agree to let an impartial third party, the arbitrator, decide the case. The arbitrator may be a lawyer, or may be an expert in the field of the dispute, or in some cases, an arbitration panel. The arbitrator’s decision, known as an award, is legally binding and can be enforced through the courts. Normally, there is no appeal, however there are exceptions in which appeals may be accepted. Arbitrators have the power to ascertain facts rather than just listen to submissions, and to order costs.
For more information see: Arbitration.
The Housing Grants, Construction and Regeneration Act imposes a right to adjudication in construction contracts. If parties to a construction contract do not agree an adjudication procedure, then one is imposed by the Scheme for construction contracts. In adjudication, the decision is the responsibility of a third party adjudicator selected by the parties to the dispute. Adjudication decisions are binding unless and until they are revised by subsequent arbitration or litigation after practical completion, or by agreement between the parties (hence the term 'pay now argue later'). There is no right of appeal and limited right to resist enforcement. Generally, adjudicators do not have the power to award costs (other than their own fees and expenses). Adjudication must adhere to strict timescales and typically takes up to 28 days.
For more information see: Adjudication.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding..