NEC3
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.
1. One very well known London practice of cost consultants raises its fees substantially on NEC projects to cover additional resources needed to administer the cost aspects of the system
2. The large number of companies involved on a large building project and the length of supply chains means that capturing cost information in regard to compensation events takes a long time. More often than not the project manager has to decide whether or not to proceed with a variation on cost estimates from the cost consultant which in due course get replaced by the actual cost. This practicality defeats the NEC rationale in respect of cost control and decision making.
3. Compensation events due to changes that are not caused by the contractor are reimbursed at cost and not related to tender pricing. This means the only basis of challenge is unreasonableness. For instance the factory overhead being claimed for additional work is impossible to police particularly in regard to say overtime, additional supervision and breakdown when other goods are being produced for other projects.
You must sign in or register to edit or comment on an article
Return to Talk:NEC3.
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.