About Atozdesignandbuild
A to Z Design and Build ltd is a building company in Fulham. We build extensions, lofts, mansards, full refurbishments.

How we work!
- == We will meet with you to do a first site inspection of the property ==
- == Site survey- we doing a laser measurement of the site and convert it in CAD format. ==
- == Design-you will work with our design team to achieve your desired project. The period of the design is between 4-5 weeks. Where required our structural engineer will do the structural calculations. ==
- == Fresh Air-at this stage we could design for your the system of the supplying more fresh air into your property, bedrooms. We have a specialist team to supply this service for you. ==
- == Submission- when all plans are ready we prepare and submit your application for planning permission or permitted development. We then act on your behalf for the eight-week process responding to any enquiries and making sure that the application stays on track. ==
Quotation- at this stage the estimated cost will be submitted for you to decide.
Programming- we will prepare a scheduled program for the works.
Party Wall agreement- we do not have party wall surveyors in the house but can recommend. This is a stage that can not be avoided in any case.
Contract and deposit- at this stage we will sign the contract and the first invoice of the deposit submitted.
Building Control- 5 days prior to the starting of the project the building control should be informed. We are comfortable to work with council building control as well as with private building control.
This is the most important part that now will actually make a physical change of your property.
You will be introduced to the Project Manager and Site manager that will be with you for the entire project.
We will require a site visit every week to run through the completed stages of the project and issue an Interim Certificate that will follow with the payment for the completed works.
On completion will start as called the retention period between 3-6 months where you will point to us any snagging that must be adjusted.
Featured articles and news
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February
Update on the future of Grenfell Tower
Deputy Prime Minister decides for it be carefully taken down to the ground.
Ending decades of frustration, misinformation and distrust.
Essential tools in managing historically significant landscapes.
Classroom electrician courses a 'waste of money'
Say experts from the Electrical Contractors’ Association.
Wellbeing in Buildings TG 10/2025
BSRIA topic guide updates.
With brief background and WELL v2™.
From studies, to books to a new project, with founder Emma Walshaw.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.