Self-build home: Confirm appointment of the supplier to fabricate and install the kit house
As the kit house supplier has already been selected, this appointment should be a relatively straight-forward process of confirming the purchase and agreeing the programme for the works.
However, it is important to be certain what is included in the contract and what may need to be procured separately, such as:
- Providing appropriate services to the site (water, electricity, gas, telephone, drainage and so on).
- Providing a foundation slab.
- Fitting out the interior.
- Landscaping the site and providing access to the house (this might include; paths, drives, ramps, steps and so on).
Some of these works will be required before the kit house can be installed. Any works that remain outside the main contract will have to be carefully co-ordinated to ensure the programme is properly synchronised and there are no delays. See Appoint a range of contractors and suppliers to construct the home for more information about organising separate trade contractors and suppliers.
The supply contract for the kit house should include information about:
- Start and completion dates and key dates for works outside the contract.
- Stage payments.
- Professional indemnity insurance, public liability insurance and works insurance.
- Warranties. Both for the fabric of the building and any fixtures and fittings.
- Toolkits and operating and maintenance manuals.
- Spares.
- The fixtures and fittings included; such as lamps, blinds, white goods, cupboards, floor coverings, security systems and so on.
- Other specific inclusions and exclusions.
- Certificates.
NB Kit houses may qualify to reclaim the VAT paid on eligible building materials and services. See VAT refunds on self-build homes for more information.
NB Self-build clients are ‘domestic clients’ for the purposes of the Construction (Design and Management) Regulations (health and safety regulations generally referred to as the 'CDM Regulations'), and so the client's duties under the regulations will fall to the contractor on a project where there is only one contractor or to the principal contractor on a project where there is more than one contractor. However self-build clients can attract health and safety duties under Part 4 of the Regulations if they control the way in which construction work is carried out. See CDM for self-builders and domestic clients for more information.
Featured articles and news
Top tips and risks to look out for.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, retrofit measures and the roles involved.
New alliance will tackle skills shortage in greater Manchester
The pioneering Electrotechnical Training and Careers Alliance.
Drone data at the edge: three steps to better AI insights
Offering greater accuracy and quicker access to insights.
From fit-out to higher-risk buildings.
Heritage conservation in Calgary
The triple bottom line.
College of West Anglia apprentice wins SkillELECTRIC gold.
Scottish government launch delivery plan
To strengthen planning and tackle the housing emergency.
How people react in ways which tend to restore their comfort.
Comfort is a crucial missing piece of the puzzle.
ECA launches Recharging Electrical Skills Charter in Wales
Best solutions for the industry and electrical skills in Wales.
New homebuilding skills hub launch and industry response
Working with CITB and NHBC to launch fast track training.
Building Peoples Network of Networks
Amplifying voices and giving support to people from diverse and under-represented groups in construction.
Experiences of discrimination and sexual misconduct rife
Reveals ARB research into architectual workplace culture.
About the 5 Percent Club and its members
The 5% Club; a dynamic movement of employers committed to building and developing the workforce.