EPS Geofill Civil Engineering - Case Study

Project: Warrington Temporary Market

Location: Warrington, Cheshire

Sector: Civil Engineering

System: Stylite EPS 70 Geofill

Size: 1,000m3

Client: Warrington Borough Council

Contents

[edit] Problem

Warrington Borough Council's flag ship Bridge Street Regeneration Project included plans to move the existing market into a temporary location whilst demolition of the old market building took place and until the new, permanent £10 million market hall was constructed. The land where the proposed temporary market was to be built was on two significantly different levels, with the existing level being approximately 750mm higher than the new land.

[edit] Client requirement

The council wanted the temporary market to be all on one level to make it fully accessible, so a decision on the method of how to fill the void had to be made. The choices available to the contractor were traditional fill materials or a modern method of polystyrene voidfill. Consideration also had to be given to the cost implications, access issues and additional stresses to the underlying substrate.

[edit] Design solution

The contractor chose to specify 750mm deep Stylite EPS 70 Geofill plus 150mm Stylite EPS 70 flooring top sheet. The polystyrene Geofill was designed to bring the lower level up to the required height and the top sheet was designed to cover both the polystyrene voidfill and the existing concrete upper level. To complete the system a reinforced concrete topping was specified.

Stylite EPS Geofill.jpg

Stylite EPS Geofill Blocks.jpg

[edit] Benefits

The Stylite EPS Geofill system comprises a lightweight Expanded Polystyrene (EPS) which weighs only 1 per cent of traditional fill materials making it easy to deliver to restricted-access sites. It also has excellent compressive strength yet produces less vertical and horizontal stresses compared to traditional fill materials.

The blocks of polystyrene were delivered to site at (H)2400 x (W)1200 x (D)750mm and due to their light weight could easily be moved into position without the need for specialist lifting equipment. Where necessary the EPS could easily be cut on site with a simple hand saw to fit around service pipes. These benefits meant Stylite EPS Geofill was a highly cost effective system in terms of labour.

Stylite EPS Geofill offered the following key benefits:

  • A cost effective alternative to traditional fill methods.
  • Quick delivery to a restricted-access site.
  • Minimal horizontal and vertical stresses.
  • Excellent compressive strength.
  • Lightweight and easy to handle.

[edit] Results

The holistic design approach allowed the whole floor area to be constructed on one level, providing the council with a perfectly level and uninterrupted floor for the market hall which is accessible to all.

Read the full case study here: http://styrene.biz/case_studies_warr_temp.html