Sea Sand Tower Hospital Queen Elizabeth, Kota Kinabalu, Malaysia
Expert: New tower block is the best option for hospital By MUGUNTAN VANAR
KOTA KINABALU: Constructing a new tower block will be the best option for the Queen Elizabeth Hospital as it is more cost-effective.
Ikram (Sabah) Sdn Bhd executive director Vincent Tan, whose company was hired to assess the safety of the building, saiddemolishing the 10-storey block and putting up a new building would cost RM24.58mil compared to repairing it for RM23.76mil.
Tan said rehabilitating the building, which has been affected by corrosion due to the use of poorly cleaned sea sand in the concrete mix, would only give it a 10-year lease of life, compared with putting up a new building which is also built to withstand earthquakes.
The forum, moderated by Sabah Health Department director Dr Marzukhi Md Isa, was to answer public calls for temporary repairs on the current tower block for continued usage pending the completion of two twin-tower blocks at the hospital.
Various services from the tower block ranging from operating theatres and wards have been moved to other government and private hospitals as a temporary move following the decision to abandon the tower block and demolish it.
Tan said that thorough investigation into the various structures of the building found that the tower, which was meant to have a lifespan of 50 years, was already suffering “ageing problems at the age 27 due to stress”.
However, he dismissed claims that the tower was tilting, adding that repairing the building would also involve shifting out all staff and services as it could not be done hygienically within a working ward.
Dr Marzukhi also said that the staff at the tower block felt unsafe as they had experienced many incidents of falling concrete debris.
“We cannot wait for an accident to happen before taking action,” he said.
Queen Elizabeth Hospital continues to provide specialist treatment, emergency services and admissions and has also set up a temporary intensive care unit.
Surgeries are being done at both the Likas Hospital and Sabah Medical Centre for now, Dr Marzukhi said.
He added that free shuttle services from the Queen Elizabeth Hospital to the Likas Hospital and Sabah Medical Centre are provided for the public.
from: http://www.skyscrapercity.com/showthread.php?t=671798&page=25
Wikipedia keeps deleting my post on this. Censorship at its best. Currently this is the only reference I can find on the net for this.
You must sign in or register to edit or comment on an article
Return to Talk:Sea Sand Tower Hospital Queen Elizabeth, Kota Kinabalu, Malaysia.
Featured articles and news
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building 2024 judges choice winner
Once Upon a Pass by Liam Man.
CIOB Art of Building 2024 public choice winner
Fresco School by Roman Robroek.
HE expands finance alliance to boost SME house building
Project follows on from Habiko public-private place making pension partnership for affordable housing delivery.
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
How orchards can influence planning and development.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.