Search results
There is a page named "Risk" on the designing buildings wiki.
[edit] Page title matches
-
198 B (22 words) - 17:37, 23 April 2015
- #REDIRECT [[Risk assessment for construction]]46 B (5 words) - 17:33, 23 April 2015
- ...elates to health and safety risks - for other risks, see Project risks and Risk management. See also: Risk assessment under The Regulatory Reform (Fire Safety) Order 2005.5 KB (807 words) - 11:31, 17 November 2022
- A risk is a potential event, either internal or external to a project, that, if it Risk has two aspects:23 KB (3,567 words) - 11:32, 17 November 2022
-
80 B (9 words) - 17:37, 23 April 2015
- Contractors' all-risk insurance (sometimes referred to as 'contract works insurance') is a policy Contractors' all-risk insurance is available from a wide range of insurance providers.2 KB (233 words) - 11:56, 30 October 2020
- #REDIRECT [[Risk assessment under The Regulatory Reform (Fire Safety) Order 2005]]82 B (10 words) - 07:56, 10 August 2019
- ...as a positive or negative effect on a project’s objectives or outcome. A risk is defined by having both an impact and a probability, and should not be co ...appreciation of its importance. Then, by understanding the importance of a risk, a project manager is able to prioritise time and resources to addressing t6 KB (1,046 words) - 08:02, 9 August 2022
-
77 B (7 words) - 05:18, 4 October 2012
-
77 B (7 words) - 05:19, 4 October 2012
- ...ity is sequenced over a long period of time and, as a result, the level of risk, actual or perceived, can vary significantly from one stage to the next. ...uable or flammable components results in a better process of evaluation of risk analysis and pricing.2 KB (333 words) - 08:07, 4 November 2020
-
114 B (15 words) - 12:16, 8 May 2014
-
116 B (15 words) - 07:03, 15 May 2014
-
3 KB (452 words) - 12:25, 26 January 2021
- ...gs is carried out in several phases, all involving hazard, uncertainty and risk. == Uncertainty and risk ==11 KB (1,580 words) - 11:33, 17 November 2022
-
78 B (7 words) - 13:38, 7 October 2013
- = Risk = A risk is a potential event, either internal or external to a project, that, if it7 KB (1,041 words) - 07:58, 23 August 2022
- #REDIRECT [[3D animation for building insurance risk analysis]]63 B (8 words) - 06:51, 30 April 2014
- #REDIRECT [[Risk register for building design and construction]]64 B (8 words) - 07:04, 14 May 2014
- RAMS are Risk Assessments and Method Statements. = Risk assessments =4 KB (541 words) - 10:02, 9 August 2022
[edit] Page text matches
- ...rent resonances of sound; so should be specified in the context of a noise risk assessment, i.e. what type of sound are you most trying to screen out?7 KB (1,057 words) - 08:47, 4 December 2020
- ... using bespoke agreements. However, this may be inadvisable because of the risk that bespoke agreements might not adequately or fairly make provision for a13 KB (1,683 words) - 11:26, 16 May 2022
- The client undertakes risk assessment and value management exercises, sets an initial budget for the p4 KB (661 words) - 13:11, 24 September 2020
- ...struction contracts is generally used as a mechanism for the allocation of risk between the client and contractor for changes that might occur in the perio ...CT]) Design and Build Contract, the base date determines the allocation of risk in relation to changes in statutory regulations, changes to VAT exemptions5 KB (739 words) - 08:56, 26 January 2023
- ...out the supply chain. It is most commonly used on large, long-term or high-risk contracts. Where a partnering relationship is for a specific project, it is12 KB (1,674 words) - 20:58, 22 December 2021
- ... possible to make an outline planning application during this stage if the risk to the project of not receiving planning permission is high, or if delays i5 KB (700 words) - 06:22, 29 September 2020
- ...ire a particular form to contracts, therefore the terms and ultimately the risk allocation is the choice of the parties involved. Standard Form Contracts ( ...tween the parties to a construction project, determining the allocation of risk and consequently, price.11 KB (1,423 words) - 16:42, 10 November 2022
- * Design risk management (DRM)8 KB (1,024 words) - 17:20, 2 February 2022
- ... are carried out by a process of inspection. This does leave the client at risk that the completed works might not be approved, resulting in remedial costs17 KB (2,414 words) - 09:00, 25 November 2022
- * Project risk. * Risk management.6 KB (841 words) - 19:24, 20 January 2022
- ...ecision maker, senior responsible owner and project sponsor because of the risk of a conflict of interest. Roles that do not overlap should not be combined5 KB (709 words) - 10:09, 12 June 2022
- ...ssues are properly considered during a project’s development so that the risk of harm to those who have to build, use and maintain structures is reduced. * Design risk management.6 KB (779 words) - 08:30, 22 September 2020
- ...ety issues are properly considered during a project’s development so the risk of harm to those who have to build, use and maintain structures is reduced. ...o-ordination and co-operation (regulations 5 and 6) can be assured. Higher risk projects such as demolition require a more rigorous approach with proportio5 KB (657 words) - 08:10, 9 September 2020
- * Risk assessment.4 KB (454 words) - 07:48, 7 June 2021
- ...are effectively acting as a consultant to the client, the client takes the risk for the trade contractors' performance. In legal terms the management contr * Construction manager at-risk.7 KB (1,056 words) - 09:38, 10 August 2022
- * Circumstances under which risk assessments or method statements should be prepared. * Risk assessments.3 KB (403 words) - 13:47, 6 October 2020
- ...ent, are intended to add value and improve an organisation’s governance, risk management and control processes without the internal auditor assuming mana6 KB (722 words) - 11:28, 10 November 2022
- Contingencies are downside risk estimates that make allowance for the unknown risks associated with a proje * Project risk.3 KB (420 words) - 07:19, 28 March 2022
- ...re plans than could be enacted to mitigate project risks identified during risk assessment, if those risks increase or materialise. That is, they are alter * The risk of obtaining planning permission or other statutory approvals. This might b2 KB (285 words) - 07:25, 6 February 2023
- ...tween the parties to a construction project, determining the allocation of risk and consequently, price. ...wide range of standard forms of contract which are intended to balance the risk of the parties but more importantly, through extensive and repeated use, gi4 KB (531 words) - 11:56, 15 February 2023
Featured articles and news
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding..