<?xml version="1.0"?>
<?xml-stylesheet type="text/css" href="https://www.designingbuildings.co.uk/skins/common/feed.css?301"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
		<id>https://www.designingbuildings.co.uk/w/index.php?feed=atom&amp;target=Raosullivan1&amp;title=Special%3AContributions%2FRaosullivan1</id>
		<title>Designing Buildings - User contributions [en]</title>
		<link rel="self" type="application/atom+xml" href="https://www.designingbuildings.co.uk/w/index.php?feed=atom&amp;target=Raosullivan1&amp;title=Special%3AContributions%2FRaosullivan1"/>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/Special:Contributions/Raosullivan1"/>
		<updated>2026-07-06T11:19:20Z</updated>
		<subtitle>From Designing Buildings</subtitle>
		<generator>MediaWiki 1.17.4</generator>

	<entry>
		<id>https://www.designingbuildings.co.uk/wiki/User:Raosullivan1</id>
		<title>User:Raosullivan1</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/User:Raosullivan1"/>
				<updated>2013-04-29T11:41:40Z</updated>
		
		<summary type="html">&lt;p&gt;Raosullivan1: Protected &amp;quot;User:Raosullivan1&amp;quot; ([edit=author] (indefinite) [move=author] (indefinite))&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;br /&gt;
= Ryan Anthony O'Sullivan - Profile =&lt;br /&gt;
&amp;lt;div id=&amp;quot;member-1&amp;quot;&amp;gt;&lt;br /&gt;
Compensation Grouting Engineer at Soletanche Bachy&lt;br /&gt;
:Manchester, Greater Manchester, United Kingdom (Manchester, United Kingdom), Civil Engineering&lt;br /&gt;
:&amp;lt;br/&amp;gt;&amp;lt;/div&amp;gt;&lt;br /&gt;
= Summary =&lt;br /&gt;
&amp;lt;div&amp;gt;&lt;br /&gt;
Ambitious and proficient Construction Project Management Undergraduate, demonstrating a conscientious and diligent work ethic, a strong will to succeed, a highly developed sense of professional pride and a complete commitment to achieving set targets and deadlines.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Currently completing investigative analysis on Building Information Modelling (BIM).&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Specialty Training:&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Autodesk: AutoCAD Creative License 2-week Full Course ACA (AutoCAD Certified Associate): 2D Rookie, Advanced 2D Hotshot, Advanced 3D Modelling.&amp;lt;br/&amp;gt;• Construction Skills Certification Scheme (CSCS): Red Card (Technical, Supervisory &amp;amp; Management).&amp;lt;br/&amp;gt;• CastaurCAD Software: In-House Training provided via Bachy Soletanche Ltd.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Working Towards:&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• MSc BIM and Integrated Design.&amp;lt;br/&amp;gt;• Chartership within the Institution of Civil Engineers (ICE) and The Chartered Institute of Building (CIOB).&lt;br /&gt;
&amp;lt;/div&amp;gt;&amp;lt;div&amp;gt;&lt;br /&gt;
= Experience =&lt;br /&gt;
&amp;lt;/div&amp;gt;&amp;lt;div&amp;gt;&lt;br /&gt;
== Compensation Grouting Engineer&amp;lt;br/&amp;gt; ==&lt;br /&gt;
&lt;br /&gt;
==== [http://www.linkedin.com/company/soletanche-bachy?trk=ppro_cprof Bachy Soletanche Limited] ====&lt;br /&gt;
&lt;br /&gt;
Privately Held; 5001-10,000 employees; Civil Engineering industry&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2012-02-01&amp;quot;&amp;gt;February 2012&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2012-09-01&amp;quot;&amp;gt;September 2012&amp;lt;/abbr&amp;gt; (8 months) G1027 - Bond Street Station Upgrade (BSSU) Project, Central London, UK, (£300m).&lt;br /&gt;
&lt;br /&gt;
Costain / Laing O'Rourke (CoLOR) Joint Venture.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Progressing the Detailed Design for the Works Area.&amp;lt;br/&amp;gt;• Advanced 2D Drafting and 3D Modelling using AutoCAD 2012 i.e. Clash Detection (Applying&amp;lt;br/&amp;gt;Exclusion Zone Geometry to existing and new structures to enable pre-consolidation treatment&amp;lt;br/&amp;gt;where required and Compensation Grouting works.&amp;lt;br/&amp;gt;• Implementing Building Information Modelling (BIM) processes to progress the Design Phase for&amp;lt;br/&amp;gt;the Contracted Works.&amp;lt;br/&amp;gt;• Quantity Surveys and Cost Estimating for Tube-a-Manchette (TaM) Arrays and total pipe supply.&amp;lt;br/&amp;gt;• Development of a two-layer Pipe Roof Arch (Interlocking Canopy Concept - 28 No. Pipes) for the&amp;lt;br/&amp;gt;works area.&amp;lt;br/&amp;gt;• Producing drilling and grouting exclusion zone data for each tunnel advance.&amp;lt;br/&amp;gt;• Ground Settlement Analysis.&lt;br /&gt;
&amp;lt;/div&amp;gt;&lt;br /&gt;
== Project Coordinator ==&lt;br /&gt;
&lt;br /&gt;
==== Western Versatile Construction Corp. ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2011-07-01&amp;quot;&amp;gt;July 2011&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2011-12-01&amp;quot;&amp;gt;December 2011&amp;lt;/abbr&amp;gt; (6 months) Long Lake Hydroelectric Project, Stewart, BC, Canada. ($80m)&lt;br /&gt;
&lt;br /&gt;
31 MW Hydroelectric Project located on Cascade Creek near the border of British Columbia and Alaska.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Canadian Law, Reconciliation, Substantiating Delay Claims and Force Majeure.&amp;lt;br/&amp;gt;• Change Order Procedures and Project Schedule Reviews.&amp;lt;br/&amp;gt;• Cost Estimating, Project Cost Analysis and Contract Document Control.&amp;lt;br/&amp;gt;• Overseeing Company Owned Equipment Maintenance and Repairs.&amp;lt;br/&amp;gt;• Quality Control / Assurance for 7,150m Penstock Pipe Supply.&lt;br /&gt;
&amp;lt;div&amp;gt;&lt;br /&gt;
== Site Civil Engineer ==&lt;br /&gt;
&lt;br /&gt;
[http://www.linkedin.com/company/carillion?trk=ppro_cprof Carillion Regional Civil Engineering]&lt;br /&gt;
&amp;lt;/div&amp;gt;&lt;br /&gt;
Public Company; 10,001+ employees; CLLN.L; Facilities Services industry&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2010-03-01&amp;quot;&amp;gt;March 2010&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2010-10-01&amp;quot;&amp;gt;October 2010&amp;lt;/abbr&amp;gt; (8 months) M56 Motorway - J7, Bowdon View Bridge Replacement Scheme, Cheshire. (£5m)&lt;br /&gt;
&lt;br /&gt;
Lift and Jacking of a new 2000t, offline bridge to replace existing westbound off-slip (Link to M6 Southbound) over 3 weekend periods, whilst minimising disruption for the Highways Agency (HA).&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;The initial bridge comprised a 2-span continuous deck, supported on reinforced concrete full height abutments and a circular column pier, located in the central reserve on the M56 Motorway.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Demolition of existing structure and re-opening of M56 completed in a 54-hour weekend possession. Installation of the new pre-cast 'A-Frame' Central Pier, installed in a 36-hour possession. Installation of new 2000t bridge constructed 500m from the final position.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Demolition and Installation Link:&amp;lt;br/&amp;gt;[http://www.youtube.com/watch?v=usD3SwHkLRQ http://www.youtube.com/watch?v=usD3SwHkLRQ]&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Time-lapse of bridge deck to final location Link:&amp;lt;br/&amp;gt;[http://www.capture1.co.uk/videos/carrillionbridgemove.html http://www.capture1.co.uk/videos/carrillionbridgemove.html]&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Approvals and reprogramming to meet overall completion dates.&amp;lt;br/&amp;gt;• Setting-out for all excavation, steelwork, blinding, concrete kickers and shuttering.&amp;lt;br/&amp;gt;• Completing Inductions for all sub-contractors and supervision of site works.&amp;lt;br/&amp;gt;• Detailing closures, diversions and construction methodology.&amp;lt;br/&amp;gt;• Facilitating engineering and surveying for several gangs.&amp;lt;br/&amp;gt;• Supervision of piling works during night possessions (24. No. Mini-piles - Keller Geotechnique).&lt;br /&gt;
&lt;br /&gt;
= Organisations =&lt;br /&gt;
&lt;br /&gt;
== Construction Society, School of Built and Natural Environment, University of Central Lancashire&amp;lt;br/&amp;gt; ==&lt;br /&gt;
&lt;br /&gt;
Committee Member, Steering Group&amp;lt;br/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
December 2012 to Present&amp;lt;br/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
A Society for the Students, Staff and Alumni of the Architectural Technology, Building Surveying, Construction Project Management, Facilities Management and Quantity Surveying courses at the School of Built and Natural Environment.&lt;br /&gt;
&lt;br /&gt;
= Education =&lt;br /&gt;
&lt;br /&gt;
=== University of Central Lancashire ===&lt;br /&gt;
&lt;br /&gt;
==== Bachelor of Science (BSc) Hons, Construction Project Management ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2010-01-01&amp;quot;&amp;gt;2010&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2013-12-31&amp;quot;&amp;gt;2013&amp;lt;/abbr&amp;gt; (expected)&lt;br /&gt;
&lt;br /&gt;
(Class: Expected: First Class - 1:0)&lt;br /&gt;
&lt;br /&gt;
Activities and Societies: Student Representative at the School of Built and Natural Environment.&lt;br /&gt;
&lt;br /&gt;
=== The University of Salford ===&lt;br /&gt;
&lt;br /&gt;
==== Bachelor of Science, Construction Management ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2009-01-01&amp;quot;&amp;gt;2009&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2010-12-31&amp;quot;&amp;gt;2010&amp;lt;/abbr&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Transferred / Advanced to second year at the University of Central Lancashire (UCLan).&lt;br /&gt;
&lt;br /&gt;
=== Stockport College of Technology ===&lt;br /&gt;
&lt;br /&gt;
==== BTEC National Diploma, Civil Engineering ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2007-01-01&amp;quot;&amp;gt;2007&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2009-12-31&amp;quot;&amp;gt;2009&amp;lt;/abbr&amp;gt;&lt;br /&gt;
&lt;br /&gt;
(3 A*A*A* with Distinction)&lt;br /&gt;
&lt;br /&gt;
Activities and Societies: Student Representative for the School of Built Environment.&lt;br /&gt;
&lt;br /&gt;
=== Cheadle Hulme High School ===&lt;br /&gt;
&lt;br /&gt;
==== &amp;lt;abbr title=&amp;quot;2002-01-01&amp;quot;&amp;gt;2002&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2007-12-31&amp;quot;&amp;gt;2007&amp;lt;/abbr&amp;gt; ====&lt;br /&gt;
&lt;br /&gt;
Grade: 11 GCSE's at A*-C&lt;br /&gt;
&lt;br /&gt;
Activities and Societies: CHHS Basketball Team (Years 10-11)&lt;br /&gt;
&lt;br /&gt;
= Additional Information =&lt;br /&gt;
&lt;br /&gt;
== Groups and Associations: ==&lt;br /&gt;
&lt;br /&gt;
Institution of Civil Engineers (ICE), The Chartered Institute of Building (CIOB), Royal Institution of Chartered Surveyors (RICS), British Tunnelling Society (BTS), UK Tunnelling and Underground Construction Academy (TUCA).&lt;br /&gt;
&lt;br /&gt;
== Honors and Awards: ==&lt;br /&gt;
&lt;br /&gt;
National League Basketball, England Award Ceremony, 2004-2006, Trophies for Best Hustler and Point-Guard&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Cheadle Hulme High School Award Ceremony, 2007, Best in the School Year Achievement/Certificate in Manufacturing Engineering&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Stockport College Award Ceremony, 2009, Excellent Coursework in Civil Engineering &amp;amp; £50 cheque for 100% attendance throughout two years&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;The Chartered Institute of Building (CIOB), North West Branch, 2010-2013, Student Representative for North West Region, 2010-Present&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;CIOB, The Queen Elizabeth II Jubilee Fund Scholarship 2012, 2012-2013, Award for distinction of intellect and character as evidenced by both scholastic attainments and by other extra-curricular activities&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;CIOB/Novus Group Student Challenge 2013, North West Branch, 2013, 1st Place, NW Regional Heat Winner. Held at the University of Salford&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;CIOB Student Challenge 2013, National Finals, Int. HQ, Ascot, UK, 2013, 2nd Place, Silver Medallist. Competed against 12 leading Universities in the UK&lt;br /&gt;
&lt;br /&gt;
== Contact Ryan for: ==&lt;br /&gt;
&amp;lt;div&amp;gt;*career opportunities*consulting offers*new ventures*job inquiries&lt;br /&gt;
*expertise requests&lt;br /&gt;
*business deals&lt;br /&gt;
*reference requests&lt;br /&gt;
*getting back in touch&lt;br /&gt;
&amp;lt;/div&amp;gt;&lt;br /&gt;
&amp;lt;br/&amp;gt;&lt;/div&gt;</summary>
		<author><name>Raosullivan1</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/wiki/User:Raosullivan1</id>
		<title>User:Raosullivan1</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/User:Raosullivan1"/>
				<updated>2013-04-29T11:41:08Z</updated>
		
		<summary type="html">&lt;p&gt;Raosullivan1: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;br /&gt;
= Ryan Anthony O'Sullivan - Profile =&lt;br /&gt;
&amp;lt;div id=&amp;quot;member-1&amp;quot;&amp;gt;&lt;br /&gt;
Compensation Grouting Engineer at Soletanche Bachy&lt;br /&gt;
:Manchester, Greater Manchester, United Kingdom (Manchester, United Kingdom), Civil Engineering&lt;br /&gt;
:&amp;lt;br/&amp;gt;&amp;lt;/div&amp;gt;&lt;br /&gt;
= Summary =&lt;br /&gt;
&amp;lt;div&amp;gt;&lt;br /&gt;
Ambitious and proficient Construction Project Management Undergraduate, demonstrating a conscientious and diligent work ethic, a strong will to succeed, a highly developed sense of professional pride and a complete commitment to achieving set targets and deadlines.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Currently completing investigative analysis on Building Information Modelling (BIM).&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Specialty Training:&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Autodesk: AutoCAD Creative License 2-week Full Course ACA (AutoCAD Certified Associate): 2D Rookie, Advanced 2D Hotshot, Advanced 3D Modelling.&amp;lt;br/&amp;gt;• Construction Skills Certification Scheme (CSCS): Red Card (Technical, Supervisory &amp;amp; Management).&amp;lt;br/&amp;gt;• CastaurCAD Software: In-House Training provided via Bachy Soletanche Ltd.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Working Towards:&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• MSc BIM and Integrated Design.&amp;lt;br/&amp;gt;• Chartership within the Institution of Civil Engineers (ICE) and The Chartered Institute of Building (CIOB).&lt;br /&gt;
&amp;lt;/div&amp;gt;&amp;lt;div&amp;gt;&lt;br /&gt;
= Experience =&lt;br /&gt;
&amp;lt;/div&amp;gt;&amp;lt;div&amp;gt;&lt;br /&gt;
== Compensation Grouting Engineer&amp;lt;br/&amp;gt; ==&lt;br /&gt;
&lt;br /&gt;
==== [http://www.linkedin.com/company/soletanche-bachy?trk=ppro_cprof Bachy Soletanche Limited] ====&lt;br /&gt;
&lt;br /&gt;
Privately Held; 5001-10,000 employees; Civil Engineering industry&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2012-02-01&amp;quot;&amp;gt;February 2012&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2012-09-01&amp;quot;&amp;gt;September 2012&amp;lt;/abbr&amp;gt; (8 months) G1027 - Bond Street Station Upgrade (BSSU) Project, Central London, UK, (£300m).&lt;br /&gt;
&lt;br /&gt;
Costain / Laing O'Rourke (CoLOR) Joint Venture.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Progressing the Detailed Design for the Works Area.&amp;lt;br/&amp;gt;• Advanced 2D Drafting and 3D Modelling using AutoCAD 2012 i.e. Clash Detection (Applying&amp;lt;br/&amp;gt;Exclusion Zone Geometry to existing and new structures to enable pre-consolidation treatment&amp;lt;br/&amp;gt;where required and Compensation Grouting works.&amp;lt;br/&amp;gt;• Implementing Building Information Modelling (BIM) processes to progress the Design Phase for&amp;lt;br/&amp;gt;the Contracted Works.&amp;lt;br/&amp;gt;• Quantity Surveys and Cost Estimating for Tube-a-Manchette (TaM) Arrays and total pipe supply.&amp;lt;br/&amp;gt;• Development of a two-layer Pipe Roof Arch (Interlocking Canopy Concept - 28 No. Pipes) for the&amp;lt;br/&amp;gt;works area.&amp;lt;br/&amp;gt;• Producing drilling and grouting exclusion zone data for each tunnel advance.&amp;lt;br/&amp;gt;• Ground Settlement Analysis.&lt;br /&gt;
&amp;lt;/div&amp;gt;&lt;br /&gt;
== Project Coordinator ==&lt;br /&gt;
&lt;br /&gt;
==== Western Versatile Construction Corp. ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2011-07-01&amp;quot;&amp;gt;July 2011&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2011-12-01&amp;quot;&amp;gt;December 2011&amp;lt;/abbr&amp;gt; (6 months) Long Lake Hydroelectric Project, Stewart, BC, Canada. ($80m)&lt;br /&gt;
&lt;br /&gt;
31 MW Hydroelectric Project located on Cascade Creek near the border of British Columbia and Alaska.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Canadian Law, Reconciliation, Substantiating Delay Claims and Force Majeure.&amp;lt;br/&amp;gt;• Change Order Procedures and Project Schedule Reviews.&amp;lt;br/&amp;gt;• Cost Estimating, Project Cost Analysis and Contract Document Control.&amp;lt;br/&amp;gt;• Overseeing Company Owned Equipment Maintenance and Repairs.&amp;lt;br/&amp;gt;• Quality Control / Assurance for 7,150m Penstock Pipe Supply.&lt;br /&gt;
&amp;lt;div&amp;gt;&lt;br /&gt;
== Site Civil Engineer ==&lt;br /&gt;
&lt;br /&gt;
[http://www.linkedin.com/company/carillion?trk=ppro_cprof Carillion Regional Civil Engineering]&lt;br /&gt;
&amp;lt;/div&amp;gt;&lt;br /&gt;
Public Company; 10,001+ employees; CLLN.L; Facilities Services industry&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2010-03-01&amp;quot;&amp;gt;March 2010&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2010-10-01&amp;quot;&amp;gt;October 2010&amp;lt;/abbr&amp;gt; (8 months) M56 Motorway - J7, Bowdon View Bridge Replacement Scheme, Cheshire. (£5m)&lt;br /&gt;
&lt;br /&gt;
Lift and Jacking of a new 2000t, offline bridge to replace existing westbound off-slip (Link to M6 Southbound) over 3 weekend periods, whilst minimising disruption for the Highways Agency (HA).&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;The initial bridge comprised a 2-span continuous deck, supported on reinforced concrete full height abutments and a circular column pier, located in the central reserve on the M56 Motorway.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Demolition of existing structure and re-opening of M56 completed in a 54-hour weekend possession. Installation of the new pre-cast 'A-Frame' Central Pier, installed in a 36-hour possession. Installation of new 2000t bridge constructed 500m from the final position.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Demolition and Installation Link:&amp;lt;br/&amp;gt;[http://www.youtube.com/watch?v=usD3SwHkLRQ http://www.youtube.com/watch?v=usD3SwHkLRQ]&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Time-lapse of bridge deck to final location Link:&amp;lt;br/&amp;gt;[http://www.capture1.co.uk/videos/carrillionbridgemove.html http://www.capture1.co.uk/videos/carrillionbridgemove.html]&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Approvals and reprogramming to meet overall completion dates.&amp;lt;br/&amp;gt;• Setting-out for all excavation, steelwork, blinding, concrete kickers and shuttering.&amp;lt;br/&amp;gt;• Completing Inductions for all sub-contractors and supervision of site works.&amp;lt;br/&amp;gt;• Detailing closures, diversions and construction methodology.&amp;lt;br/&amp;gt;• Facilitating engineering and surveying for several gangs.&amp;lt;br/&amp;gt;• Supervision of piling works during night possessions (24. No. Mini-piles - Keller Geotechnique).&lt;br /&gt;
&lt;br /&gt;
= Organisations =&lt;br /&gt;
&lt;br /&gt;
== Construction Society, School of Built and Natural Environment, University of Central Lancashire&amp;lt;br/&amp;gt; ==&lt;br /&gt;
&lt;br /&gt;
Committee Member, Steering Group&amp;lt;br/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
December 2012 to Present&amp;lt;br/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
A Society for the Students, Staff and Alumni of the Architectural Technology, Building Surveying, Construction Project Management, Facilities Management and Quantity Surveying courses at the School of Built and Natural Environment.&lt;br /&gt;
&lt;br /&gt;
= Education =&lt;br /&gt;
&lt;br /&gt;
=== University of Central Lancashire ===&lt;br /&gt;
&lt;br /&gt;
==== Bachelor of Science (BSc) Hons, Construction Project Management ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2010-01-01&amp;quot;&amp;gt;2010&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2013-12-31&amp;quot;&amp;gt;2013&amp;lt;/abbr&amp;gt; (expected)&lt;br /&gt;
&lt;br /&gt;
(Class: Expected: First Class - 1:0)&lt;br /&gt;
&lt;br /&gt;
Activities and Societies: Student Representative at the School of Built and Natural Environment.&lt;br /&gt;
&lt;br /&gt;
=== The University of Salford ===&lt;br /&gt;
&lt;br /&gt;
==== Bachelor of Science, Construction Management ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2009-01-01&amp;quot;&amp;gt;2009&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2010-12-31&amp;quot;&amp;gt;2010&amp;lt;/abbr&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Transferred / Advanced to second year at the University of Central Lancashire (UCLan).&lt;br /&gt;
&lt;br /&gt;
=== Stockport College of Technology ===&lt;br /&gt;
&lt;br /&gt;
==== BTEC National Diploma, Civil Engineering ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2007-01-01&amp;quot;&amp;gt;2007&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2009-12-31&amp;quot;&amp;gt;2009&amp;lt;/abbr&amp;gt;&lt;br /&gt;
&lt;br /&gt;
(3 A*A*A* with Distinction)&lt;br /&gt;
&lt;br /&gt;
Activities and Societies: Student Representative for the School of Built Environment.&lt;br /&gt;
&lt;br /&gt;
=== Cheadle Hulme High School ===&lt;br /&gt;
&lt;br /&gt;
==== &amp;lt;abbr title=&amp;quot;2002-01-01&amp;quot;&amp;gt;2002&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2007-12-31&amp;quot;&amp;gt;2007&amp;lt;/abbr&amp;gt; ====&lt;br /&gt;
&lt;br /&gt;
Grade: 11 GCSE's at A*-C&lt;br /&gt;
&lt;br /&gt;
Activities and Societies: CHHS Basketball Team (Years 10-11)&lt;br /&gt;
&lt;br /&gt;
= Additional Information =&lt;br /&gt;
&lt;br /&gt;
== Groups and Associations: ==&lt;br /&gt;
&lt;br /&gt;
Institution of Civil Engineers (ICE), The Chartered Institute of Building (CIOB), Royal Institution of Chartered Surveyors (RICS), British Tunnelling Society (BTS), UK Tunnelling and Underground Construction Academy (TUCA).&lt;br /&gt;
&lt;br /&gt;
== Honors and Awards: ==&lt;br /&gt;
&lt;br /&gt;
National League Basketball, England Award Ceremony, 2004-2006, Trophies for Best Hustler and Point-Guard&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Cheadle Hulme High School Award Ceremony, 2007, Best in the School Year Achievement/Certificate in Manufacturing Engineering&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Stockport College Award Ceremony, 2009, Excellent Coursework in Civil Engineering &amp;amp; £50 cheque for 100% attendance throughout two years&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;The Chartered Institute of Building (CIOB), North West Branch, 2010-2013, Student Representative for North West Region, 2010-Present&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;CIOB, The Queen Elizabeth II Jubilee Fund Scholarship 2012, 2012-2013, Award for distinction of intellect and character as evidenced by both scholastic attainments and by other extra-curricular activities&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;CIOB/Novus Group Student Challenge 2013, North West Branch, 2013, 1st Place, NW Regional Heat Winner. Held at the University of Salford&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;CIOB Student Challenge 2013, National Finals, Int. HQ, Ascot, UK, 2013, 2nd Place, Silver Medallist. Competed against 12 leading Universities in the UK&lt;br /&gt;
&lt;br /&gt;
== Contact Ryan for: ==&lt;br /&gt;
&amp;lt;div&amp;gt;*career opportunities*consulting offers*new ventures*job inquiries&lt;br /&gt;
*expertise requests&lt;br /&gt;
*business deals&lt;br /&gt;
*reference requests&lt;br /&gt;
*getting back in touch&lt;br /&gt;
&amp;lt;/div&amp;gt;&lt;br /&gt;
&amp;lt;br/&amp;gt;&lt;/div&gt;</summary>
		<author><name>Raosullivan1</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/wiki/User:Raosullivan1</id>
		<title>User:Raosullivan1</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/User:Raosullivan1"/>
				<updated>2013-04-29T11:40:28Z</updated>
		
		<summary type="html">&lt;p&gt;Raosullivan1: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;br /&gt;
= ryan anthony o'sullivan - profile =&lt;br /&gt;
&amp;lt;div id=&amp;quot;member-1&amp;quot;&amp;gt;&lt;br /&gt;
Compensation Grouting Engineer at Soletanche Bachy&lt;br /&gt;
:Manchester, Greater Manchester, United Kingdom (Manchester, United Kingdom), Civil Engineering&lt;br /&gt;
:&amp;lt;br/&amp;gt;&amp;lt;/div&amp;gt;&lt;br /&gt;
= Summary =&lt;br /&gt;
&amp;lt;div&amp;gt;&lt;br /&gt;
Ambitious and proficient Construction Project Management Undergraduate, demonstrating a conscientious and diligent work ethic, a strong will to succeed, a highly developed sense of professional pride and a complete commitment to achieving set targets and deadlines.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Currently completing investigative analysis on Building Information Modelling (BIM).&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Specialty Training:&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Autodesk: AutoCAD Creative License 2-week Full Course ACA (AutoCAD Certified Associate): 2D Rookie, Advanced 2D Hotshot, Advanced 3D Modelling.&amp;lt;br/&amp;gt;• Construction Skills Certification Scheme (CSCS): Red Card (Technical, Supervisory &amp;amp; Management).&amp;lt;br/&amp;gt;• CastaurCAD Software: In-House Training provided via Bachy Soletanche Ltd.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Working Towards:&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• MSc BIM and Integrated Design.&amp;lt;br/&amp;gt;• Chartership within the Institution of Civil Engineers (ICE) and The Chartered Institute of Building (CIOB).&lt;br /&gt;
&amp;lt;/div&amp;gt;&amp;lt;div&amp;gt;&lt;br /&gt;
= Experience =&lt;br /&gt;
&amp;lt;/div&amp;gt;&amp;lt;div&amp;gt;&lt;br /&gt;
== Compensation Grouting Engineer&amp;lt;br/&amp;gt; ==&lt;br /&gt;
&lt;br /&gt;
==== [http://www.linkedin.com/company/soletanche-bachy?trk=ppro_cprof Bachy Soletanche Limited] ====&lt;br /&gt;
&lt;br /&gt;
Privately Held; 5001-10,000 employees; Civil Engineering industry&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2012-02-01&amp;quot;&amp;gt;February 2012&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2012-09-01&amp;quot;&amp;gt;September 2012&amp;lt;/abbr&amp;gt; (8 months) G1027 - Bond Street Station Upgrade (BSSU) Project, Central London, UK, (£300m).&lt;br /&gt;
&lt;br /&gt;
Costain / Laing O'Rourke (CoLOR) Joint Venture.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Progressing the Detailed Design for the Works Area.&amp;lt;br/&amp;gt;• Advanced 2D Drafting and 3D Modelling using AutoCAD 2012 i.e. Clash Detection (Applying&amp;lt;br/&amp;gt;Exclusion Zone Geometry to existing and new structures to enable pre-consolidation treatment&amp;lt;br/&amp;gt;where required and Compensation Grouting works.&amp;lt;br/&amp;gt;• Implementing Building Information Modelling (BIM) processes to progress the Design Phase for&amp;lt;br/&amp;gt;the Contracted Works.&amp;lt;br/&amp;gt;• Quantity Surveys and Cost Estimating for Tube-a-Manchette (TaM) Arrays and total pipe supply.&amp;lt;br/&amp;gt;• Development of a two-layer Pipe Roof Arch (Interlocking Canopy Concept - 28 No. Pipes) for the&amp;lt;br/&amp;gt;works area.&amp;lt;br/&amp;gt;• Producing drilling and grouting exclusion zone data for each tunnel advance.&amp;lt;br/&amp;gt;• Ground Settlement Analysis.&lt;br /&gt;
&amp;lt;/div&amp;gt;&lt;br /&gt;
== Project Coordinator ==&lt;br /&gt;
&lt;br /&gt;
==== Western Versatile Construction Corp. ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2011-07-01&amp;quot;&amp;gt;July 2011&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2011-12-01&amp;quot;&amp;gt;December 2011&amp;lt;/abbr&amp;gt; (6 months) Long Lake Hydroelectric Project, Stewart, BC, Canada. ($80m)&lt;br /&gt;
&lt;br /&gt;
31 MW Hydroelectric Project located on Cascade Creek near the border of British Columbia and Alaska.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Canadian Law, Reconciliation, Substantiating Delay Claims and Force Majeure.&amp;lt;br/&amp;gt;• Change Order Procedures and Project Schedule Reviews.&amp;lt;br/&amp;gt;• Cost Estimating, Project Cost Analysis and Contract Document Control.&amp;lt;br/&amp;gt;• Overseeing Company Owned Equipment Maintenance and Repairs.&amp;lt;br/&amp;gt;• Quality Control / Assurance for 7,150m Penstock Pipe Supply.&lt;br /&gt;
&amp;lt;div&amp;gt;&lt;br /&gt;
== Site Civil Engineer ==&lt;br /&gt;
&lt;br /&gt;
[http://www.linkedin.com/company/carillion?trk=ppro_cprof Carillion Regional Civil Engineering]&lt;br /&gt;
&amp;lt;/div&amp;gt;&lt;br /&gt;
Public Company; 10,001+ employees; CLLN.L; Facilities Services industry&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2010-03-01&amp;quot;&amp;gt;March 2010&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2010-10-01&amp;quot;&amp;gt;October 2010&amp;lt;/abbr&amp;gt; (8 months) M56 Motorway - J7, Bowdon View Bridge Replacement Scheme, Cheshire. (£5m)&lt;br /&gt;
&lt;br /&gt;
Lift and Jacking of a new 2000t, offline bridge to replace existing westbound off-slip (Link to M6 Southbound) over 3 weekend periods, whilst minimising disruption for the Highways Agency (HA).&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;The initial bridge comprised a 2-span continuous deck, supported on reinforced concrete full height abutments and a circular column pier, located in the central reserve on the M56 Motorway.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Demolition of existing structure and re-opening of M56 completed in a 54-hour weekend possession. Installation of the new pre-cast 'A-Frame' Central Pier, installed in a 36-hour possession. Installation of new 2000t bridge constructed 500m from the final position.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Demolition and Installation Link:&amp;lt;br/&amp;gt;[http://www.youtube.com/watch?v=usD3SwHkLRQ http://www.youtube.com/watch?v=usD3SwHkLRQ]&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Time-lapse of bridge deck to final location Link:&amp;lt;br/&amp;gt;[http://www.capture1.co.uk/videos/carrillionbridgemove.html http://www.capture1.co.uk/videos/carrillionbridgemove.html]&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Approvals and reprogramming to meet overall completion dates.&amp;lt;br/&amp;gt;• Setting-out for all excavation, steelwork, blinding, concrete kickers and shuttering.&amp;lt;br/&amp;gt;• Completing Inductions for all sub-contractors and supervision of site works.&amp;lt;br/&amp;gt;• Detailing closures, diversions and construction methodology.&amp;lt;br/&amp;gt;• Facilitating engineering and surveying for several gangs.&amp;lt;br/&amp;gt;• Supervision of piling works during night possessions (24. No. Mini-piles - Keller Geotechnique).&lt;br /&gt;
&lt;br /&gt;
= Organisations =&lt;br /&gt;
&lt;br /&gt;
== Construction Society, School of Built and Natural Environment, University of Central Lancashire&amp;lt;br/&amp;gt; ==&lt;br /&gt;
&lt;br /&gt;
Committee Member, Steering Group&amp;lt;br/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
December 2012 to Present&amp;lt;br/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
A Society for the Students, Staff and Alumni of the Architectural Technology, Building Surveying, Construction Project Management, Facilities Management and Quantity Surveying courses at the School of Built and Natural Environment.&lt;br /&gt;
&lt;br /&gt;
= Education =&lt;br /&gt;
&lt;br /&gt;
=== University of Central Lancashire ===&lt;br /&gt;
&lt;br /&gt;
==== Bachelor of Science (BSc) Hons, Construction Project Management ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2010-01-01&amp;quot;&amp;gt;2010&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2013-12-31&amp;quot;&amp;gt;2013&amp;lt;/abbr&amp;gt; (expected)&lt;br /&gt;
&lt;br /&gt;
(Class: Expected: First Class - 1:0)&lt;br /&gt;
&lt;br /&gt;
Activities and Societies: Student Representative at the School of Built and Natural Environment.&lt;br /&gt;
&lt;br /&gt;
=== The University of Salford ===&lt;br /&gt;
&lt;br /&gt;
==== Bachelor of Science, Construction Management ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2009-01-01&amp;quot;&amp;gt;2009&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2010-12-31&amp;quot;&amp;gt;2010&amp;lt;/abbr&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Transferred / Advanced to second year at the University of Central Lancashire (UCLan).&lt;br /&gt;
&lt;br /&gt;
=== Stockport College of Technology ===&lt;br /&gt;
&lt;br /&gt;
==== BTEC National Diploma, Civil Engineering ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2007-01-01&amp;quot;&amp;gt;2007&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2009-12-31&amp;quot;&amp;gt;2009&amp;lt;/abbr&amp;gt;&lt;br /&gt;
&lt;br /&gt;
(3 A*A*A* with Distinction)&lt;br /&gt;
&lt;br /&gt;
Activities and Societies: Student Representative for the School of Built Environment.&lt;br /&gt;
&lt;br /&gt;
=== Cheadle Hulme High School ===&lt;br /&gt;
&lt;br /&gt;
==== &amp;lt;abbr title=&amp;quot;2002-01-01&amp;quot;&amp;gt;2002&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2007-12-31&amp;quot;&amp;gt;2007&amp;lt;/abbr&amp;gt; ====&lt;br /&gt;
&lt;br /&gt;
Grade: 11 GCSE's at A*-C&lt;br /&gt;
&lt;br /&gt;
Activities and Societies: CHHS Basketball Team (Years 10-11)&lt;br /&gt;
&lt;br /&gt;
= Additional Information =&lt;br /&gt;
&lt;br /&gt;
== Groups and Associations: ==&lt;br /&gt;
&lt;br /&gt;
Institution of Civil Engineers (ICE), The Chartered Institute of Building (CIOB), Royal Institution of Chartered Surveyors (RICS), British Tunnelling Society (BTS), UK Tunnelling and Underground Construction Academy (TUCA).&lt;br /&gt;
&lt;br /&gt;
== Honors and Awards: ==&lt;br /&gt;
&lt;br /&gt;
National League Basketball, England Award Ceremony, 2004-2006, Trophies for Best Hustler and Point-Guard&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Cheadle Hulme High School Award Ceremony, 2007, Best in the School Year Achievement/Certificate in Manufacturing Engineering&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Stockport College Award Ceremony, 2009, Excellent Coursework in Civil Engineering &amp;amp; £50 cheque for 100% attendance throughout two years&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;The Chartered Institute of Building (CIOB), North West Branch, 2010-2013, Student Representative for North West Region, 2010-Present&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;CIOB, The Queen Elizabeth II Jubilee Fund Scholarship 2012, 2012-2013, Award for distinction of intellect and character as evidenced by both scholastic attainments and by other extra-curricular activities&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;CIOB/Novus Group Student Challenge 2013, North West Branch, 2013, 1st Place, NW Regional Heat Winner. Held at the University of Salford&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;CIOB Student Challenge 2013, National Finals, Int. HQ, Ascot, UK, 2013, 2nd Place, Silver Medallist. Competed against 12 leading Universities in the UK&lt;br /&gt;
&lt;br /&gt;
== Contact Ryan for: ==&lt;br /&gt;
&amp;lt;div&amp;gt;*career opportunities*consulting offers*new ventures&lt;br /&gt;
*job inquiries&lt;br /&gt;
*expertise requests&lt;br /&gt;
*business deals&lt;br /&gt;
*reference requests&lt;br /&gt;
*getting back in touch&lt;br /&gt;
&amp;lt;/div&amp;gt;&lt;br /&gt;
&amp;lt;br/&amp;gt;&lt;/div&gt;</summary>
		<author><name>Raosullivan1</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/wiki/User:Raosullivan1</id>
		<title>User:Raosullivan1</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/User:Raosullivan1"/>
				<updated>2013-04-29T11:39:08Z</updated>
		
		<summary type="html">&lt;p&gt;Raosullivan1: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;br /&gt;
= Ryan AnTHONY O'Sullivan - PROFILE =&lt;br /&gt;
&amp;lt;div id=&amp;quot;member-1&amp;quot;&amp;gt;&lt;br /&gt;
Compensation Grouting Engineer at Soletanche Bachy&lt;br /&gt;
:Manchester, Greater Manchester, United Kingdom (Manchester, United Kingdom), Civil Engineering&lt;br /&gt;
:&amp;lt;br/&amp;gt;&amp;lt;/div&amp;gt;&lt;br /&gt;
= Summary =&lt;br /&gt;
&amp;lt;div&amp;gt;&lt;br /&gt;
Ambitious and proficient Construction Project Management Undergraduate, demonstrating a conscientious and diligent work ethic, a strong will to succeed, a highly developed sense of professional pride and a complete commitment to achieving set targets and deadlines.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Currently completing investigative analysis on Building Information Modelling (BIM).&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Specialty Training:&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Autodesk: AutoCAD Creative License 2-week Full Course ACA (AutoCAD Certified Associate): 2D Rookie, Advanced 2D Hotshot, Advanced 3D Modelling.&amp;lt;br/&amp;gt;• Construction Skills Certification Scheme (CSCS): Red Card (Technical, Supervisory &amp;amp; Management).&amp;lt;br/&amp;gt;• CastaurCAD Software: In-House Training provided via Bachy Soletanche Ltd.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Working Towards:&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• MSc BIM and Integrated Design.&amp;lt;br/&amp;gt;• Chartership within the Institution of Civil Engineers (ICE) and The Chartered Institute of Building (CIOB).&lt;br /&gt;
&amp;lt;/div&amp;gt;&amp;lt;div&amp;gt;&lt;br /&gt;
= Experience =&lt;br /&gt;
&amp;lt;/div&amp;gt;&amp;lt;div&amp;gt;&lt;br /&gt;
== Compensation Grouting Engineer&amp;lt;br/&amp;gt; ==&lt;br /&gt;
&lt;br /&gt;
==== [http://www.linkedin.com/company/soletanche-bachy?trk=ppro_cprof Bachy Soletanche Limited] ====&lt;br /&gt;
&lt;br /&gt;
Privately Held; 5001-10,000 employees; Civil Engineering industry&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2012-02-01&amp;quot;&amp;gt;February 2012&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2012-09-01&amp;quot;&amp;gt;September 2012&amp;lt;/abbr&amp;gt; (8 months) G1027 - Bond Street Station Upgrade (BSSU) Project, Central London, UK, (£300m).&lt;br /&gt;
&lt;br /&gt;
Costain / Laing O'Rourke (CoLOR) Joint Venture.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Progressing the Detailed Design for the Works Area.&amp;lt;br/&amp;gt;• Advanced 2D Drafting and 3D Modelling using AutoCAD 2012 i.e. Clash Detection (Applying&amp;lt;br/&amp;gt;Exclusion Zone Geometry to existing and new structures to enable pre-consolidation treatment&amp;lt;br/&amp;gt;where required and Compensation Grouting works.&amp;lt;br/&amp;gt;• Implementing Building Information Modelling (BIM) processes to progress the Design Phase for&amp;lt;br/&amp;gt;the Contracted Works.&amp;lt;br/&amp;gt;• Quantity Surveys and Cost Estimating for Tube-a-Manchette (TaM) Arrays and total pipe supply.&amp;lt;br/&amp;gt;• Development of a two-layer Pipe Roof Arch (Interlocking Canopy Concept - 28 No. Pipes) for the&amp;lt;br/&amp;gt;works area.&amp;lt;br/&amp;gt;• Producing drilling and grouting exclusion zone data for each tunnel advance.&amp;lt;br/&amp;gt;• Ground Settlement Analysis.&lt;br /&gt;
&amp;lt;/div&amp;gt;&lt;br /&gt;
== Project Coordinator ==&lt;br /&gt;
&lt;br /&gt;
==== Western Versatile Construction Corp. ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2011-07-01&amp;quot;&amp;gt;July 2011&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2011-12-01&amp;quot;&amp;gt;December 2011&amp;lt;/abbr&amp;gt; (6 months) Long Lake Hydroelectric Project, Stewart, BC, Canada. ($80m)&lt;br /&gt;
&lt;br /&gt;
31 MW Hydroelectric Project located on Cascade Creek near the border of British Columbia and Alaska.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Canadian Law, Reconciliation, Substantiating Delay Claims and Force Majeure.&amp;lt;br/&amp;gt;• Change Order Procedures and Project Schedule Reviews.&amp;lt;br/&amp;gt;• Cost Estimating, Project Cost Analysis and Contract Document Control.&amp;lt;br/&amp;gt;• Overseeing Company Owned Equipment Maintenance and Repairs.&amp;lt;br/&amp;gt;• Quality Control / Assurance for 7,150m Penstock Pipe Supply.&lt;br /&gt;
&amp;lt;div&amp;gt;&lt;br /&gt;
== Site Civil Engineer ==&lt;br /&gt;
&lt;br /&gt;
[http://www.linkedin.com/company/carillion?trk=ppro_cprof Carillion Regional Civil Engineering]&lt;br /&gt;
&amp;lt;/div&amp;gt;&lt;br /&gt;
Public Company; 10,001+ employees; CLLN.L; Facilities Services industry&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2010-03-01&amp;quot;&amp;gt;March 2010&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2010-10-01&amp;quot;&amp;gt;October 2010&amp;lt;/abbr&amp;gt; (8 months) M56 Motorway - J7, Bowdon View Bridge Replacement Scheme, Cheshire. (£5m)&lt;br /&gt;
&lt;br /&gt;
Lift and Jacking of a new 2000t, offline bridge to replace existing westbound off-slip (Link to M6 Southbound) over 3 weekend periods, whilst minimising disruption for the Highways Agency (HA).&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;The initial bridge comprised a 2-span continuous deck, supported on reinforced concrete full height abutments and a circular column pier, located in the central reserve on the M56 Motorway.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Demolition of existing structure and re-opening of M56 completed in a 54-hour weekend possession. Installation of the new pre-cast 'A-Frame' Central Pier, installed in a 36-hour possession. Installation of new 2000t bridge constructed 500m from the final position.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Demolition and Installation Link:&amp;lt;br/&amp;gt;[http://www.youtube.com/watch?v=usD3SwHkLRQ http://www.youtube.com/watch?v=usD3SwHkLRQ]&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Time-lapse of bridge deck to final location Link:&amp;lt;br/&amp;gt;[http://www.capture1.co.uk/videos/carrillionbridgemove.html http://www.capture1.co.uk/videos/carrillionbridgemove.html]&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Approvals and reprogramming to meet overall completion dates.&amp;lt;br/&amp;gt;• Setting-out for all excavation, steelwork, blinding, concrete kickers and shuttering.&amp;lt;br/&amp;gt;• Completing Inductions for all sub-contractors and supervision of site works.&amp;lt;br/&amp;gt;• Detailing closures, diversions and construction methodology.&amp;lt;br/&amp;gt;• Facilitating engineering and surveying for several gangs.&amp;lt;br/&amp;gt;• Supervision of piling works during night possessions (24. No. Mini-piles - Keller Geotechnique).&lt;br /&gt;
&lt;br /&gt;
= Organisations =&lt;br /&gt;
&lt;br /&gt;
== Construction Society, School of Built and Natural Environment, University of Central Lancashire&amp;lt;br/&amp;gt; ==&lt;br /&gt;
&lt;br /&gt;
Committee Member, Steering Group&amp;lt;br/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
December 2012 to Present&amp;lt;br/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
A Society for the Students, Staff and Alumni of the Architectural Technology, Building Surveying, Construction Project Management, Facilities Management and Quantity Surveying courses at the School of Built and Natural Environment.&lt;br /&gt;
&lt;br /&gt;
= Education =&lt;br /&gt;
&lt;br /&gt;
=== University of Central Lancashire ===&lt;br /&gt;
&lt;br /&gt;
==== Bachelor of Science (BSc) Hons, Construction Project Management ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2010-01-01&amp;quot;&amp;gt;2010&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2013-12-31&amp;quot;&amp;gt;2013&amp;lt;/abbr&amp;gt; (expected)&lt;br /&gt;
&lt;br /&gt;
(Class: Expected: First Class - 1:0)&lt;br /&gt;
&lt;br /&gt;
Activities and Societies: Student Representative at the School of Built and Natural Environment.&lt;br /&gt;
&lt;br /&gt;
=== The University of Salford ===&lt;br /&gt;
&lt;br /&gt;
==== Bachelor of Science, Construction Management ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2009-01-01&amp;quot;&amp;gt;2009&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2010-12-31&amp;quot;&amp;gt;2010&amp;lt;/abbr&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Transferred / Advanced to second year at the University of Central Lancashire (UCLan).&lt;br /&gt;
&lt;br /&gt;
=== Stockport College of Technology ===&lt;br /&gt;
&lt;br /&gt;
==== BTEC National Diploma, Civil Engineering ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2007-01-01&amp;quot;&amp;gt;2007&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2009-12-31&amp;quot;&amp;gt;2009&amp;lt;/abbr&amp;gt;&lt;br /&gt;
&lt;br /&gt;
(3 A*A*A* with Distinction)&lt;br /&gt;
&lt;br /&gt;
Activities and Societies: Student Representative for the School of Built Environment.&lt;br /&gt;
&lt;br /&gt;
=== Cheadle Hulme High School ===&lt;br /&gt;
&lt;br /&gt;
==== &amp;lt;abbr title=&amp;quot;2002-01-01&amp;quot;&amp;gt;2002&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2007-12-31&amp;quot;&amp;gt;2007&amp;lt;/abbr&amp;gt; ====&lt;br /&gt;
&lt;br /&gt;
Grade: 11 GCSE's at A*-C&lt;br /&gt;
&lt;br /&gt;
Activities and Societies: CHHS Basketball Team (Years 10-11)&lt;br /&gt;
&lt;br /&gt;
= Additional Information =&lt;br /&gt;
&lt;br /&gt;
== Groups and Associations: ==&lt;br /&gt;
&lt;br /&gt;
Institution of Civil Engineers (ICE), The Chartered Institute of Building (CIOB), Royal Institution of Chartered Surveyors (RICS), British Tunnelling Society (BTS), UK Tunnelling and Underground Construction Academy (TUCA).&lt;br /&gt;
&lt;br /&gt;
== Honors and Awards: ==&lt;br /&gt;
&lt;br /&gt;
National League Basketball, England Award Ceremony, 2004-2006, Trophies for Best Hustler and Point-Guard&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Cheadle Hulme High School Award Ceremony, 2007, Best in the School Year Achievement/Certificate in Manufacturing Engineering&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Stockport College Award Ceremony, 2009, Excellent Coursework in Civil Engineering &amp;amp; £50 cheque for 100% attendance throughout two years&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;The Chartered Institute of Building (CIOB), North West Branch, 2010-2013, Student Representative for North West Region, 2010-Present&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;CIOB, The Queen Elizabeth II Jubilee Fund Scholarship 2012, 2012-2013, Award for distinction of intellect and character as evidenced by both scholastic attainments and by other extra-curricular activities&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;CIOB/Novus Group Student Challenge 2013, North West Branch, 2013, 1st Place, NW Regional Heat Winner. Held at the University of Salford&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;CIOB Student Challenge 2013, National Finals, Int. HQ, Ascot, UK, 2013, 2nd Place, Silver Medallist. Competed against 12 leading Universities in the UK&lt;br /&gt;
&lt;br /&gt;
== Contact Ryan for: ==&lt;br /&gt;
&amp;lt;div&amp;gt;*career opportunities*consulting offers&lt;br /&gt;
*new ventures&lt;br /&gt;
*job inquiries&lt;br /&gt;
*expertise requests&lt;br /&gt;
*business deals&lt;br /&gt;
*reference requests&lt;br /&gt;
*getting back in touch&lt;br /&gt;
&amp;lt;/div&amp;gt;&lt;br /&gt;
&amp;lt;br/&amp;gt;&lt;/div&gt;</summary>
		<author><name>Raosullivan1</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/wiki/User:Raosullivan1</id>
		<title>User:Raosullivan1</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/User:Raosullivan1"/>
				<updated>2013-04-29T11:35:08Z</updated>
		
		<summary type="html">&lt;p&gt;Raosullivan1: Created page with &amp;quot; = Ryan AnTHONY O'Sullivan = &amp;lt;div id=&amp;quot;member-1&amp;quot;&amp;gt; Compensation Grouting Engineer at Soletanche Bachy :Manchester, Greater Manchester, United Kingdom (Manchester, United Kingdom), ...&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;br /&gt;
= Ryan AnTHONY O'Sullivan =&lt;br /&gt;
&amp;lt;div id=&amp;quot;member-1&amp;quot;&amp;gt;&lt;br /&gt;
Compensation Grouting Engineer at Soletanche Bachy&lt;br /&gt;
:Manchester, Greater Manchester, United Kingdom (Manchester, United Kingdom), Civil Engineering&amp;lt;/div&amp;gt;;&amp;lt;br/&amp;gt;&lt;br /&gt;
;Past&lt;br /&gt;
:undefined*&lt;br /&gt;
Compensation Grouting Engineer at [http://www.linkedin.com/company/soletanche-bachy?trk=ppro_cprof Bachy Soletanche Limited]&lt;br /&gt;
undefined*&lt;br /&gt;
Project Coordinator at Western Versatile Construction Corp.&lt;br /&gt;
undefined*&lt;br /&gt;
Site Civil Engineer at [http://www.linkedin.com/company/carillion?trk=ppro_cprof Carillion Regional Civil Engineering]&lt;br /&gt;
&lt;br /&gt;
undefined;&amp;lt;br/&amp;gt;&lt;br /&gt;
undefined;Education&lt;br /&gt;
undefined:undefined*&lt;br /&gt;
University of Central Lancashire&lt;br /&gt;
undefined*&lt;br /&gt;
The University of Salford&lt;br /&gt;
undefined*&lt;br /&gt;
Stockport College of Technology&lt;br /&gt;
&amp;lt;div&amp;gt;&lt;br /&gt;
= Summary =&lt;br /&gt;
&amp;lt;/div&amp;gt;&amp;lt;div&amp;gt;&lt;br /&gt;
Ambitious and proficient Construction Project Management Undergraduate, demonstrating a conscientious and diligent work ethic, a strong will to succeed, a highly developed sense of professional pride and a complete commitment to achieving set targets and deadlines.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Currently completing investigative analysis on Building Information Modelling (BIM).&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Specialty Training: &amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Autodesk: AutoCAD Creative License 2-week Full Course ACA (AutoCAD Certified Associate): 2D Rookie, Advanced 2D Hotshot, Advanced 3D Modelling.&amp;lt;br/&amp;gt;• Construction Skills Certification Scheme (CSCS): Red Card (Technical, Supervisory &amp;amp; Management).&amp;lt;br/&amp;gt;• CastaurCAD Software: In-House Training provided via Bachy Soletanche Ltd.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Working Towards: &amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• MSc BIM and Integrated Design. &amp;lt;br/&amp;gt;• Chartership within the Institution of Civil Engineers (ICE) and The Chartered Institute of Building (CIOB).&lt;br /&gt;
&amp;lt;/div&amp;gt;&amp;lt;div&amp;gt;&lt;br /&gt;
= Experience =&lt;br /&gt;
&amp;lt;/div&amp;gt;&amp;lt;div&amp;gt;&lt;br /&gt;
Compensation Grouting Engineer&amp;lt;br/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==== [http://www.linkedin.com/company/soletanche-bachy?trk=ppro_cprof Bachy Soletanche Limited] ====&lt;br /&gt;
&lt;br /&gt;
Privately Held; 5001-10,000 employees; Civil Engineering industry&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2012-02-01&amp;quot;&amp;gt;February 2012&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2012-09-01&amp;quot;&amp;gt;September 2012&amp;lt;/abbr&amp;gt; (8 months) G1027 - Bond Street Station Upgrade (BSSU) Project, Central London, UK, (£300m).&lt;br /&gt;
&lt;br /&gt;
Costain / Laing O'Rourke (CoLOR) Joint Venture.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Progressing the Detailed Design for the Works Area. &amp;lt;br/&amp;gt;• Advanced 2D Drafting and 3D Modelling using AutoCAD 2012 i.e. Clash Detection (Applying &amp;lt;br/&amp;gt;Exclusion Zone Geometry to existing and new structures to enable pre-consolidation treatment&amp;lt;br/&amp;gt;where required and Compensation Grouting works.&amp;lt;br/&amp;gt;• Implementing Building Information Modelling (BIM) processes to progress the Design Phase for &amp;lt;br/&amp;gt;the Contracted Works. &amp;lt;br/&amp;gt;• Quantity Surveys and Cost Estimating for Tube-a-Manchette (TaM) Arrays and total pipe supply.&amp;lt;br/&amp;gt;• Development of a two-layer Pipe Roof Arch (Interlocking Canopy Concept - 28 No. Pipes) for the &amp;lt;br/&amp;gt;works area.&amp;lt;br/&amp;gt;• Producing drilling and grouting exclusion zone data for each tunnel advance.&amp;lt;br/&amp;gt;• Ground Settlement Analysis.&lt;br /&gt;
&amp;lt;/div&amp;gt;&lt;br /&gt;
&lt;br /&gt;
=== Project Coordinator ===&lt;br /&gt;
&lt;br /&gt;
==== Western Versatile Construction Corp. ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2011-07-01&amp;quot;&amp;gt;July 2011&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2011-12-01&amp;quot;&amp;gt;December 2011&amp;lt;/abbr&amp;gt; (6 months) Long Lake Hydroelectric Project, Stewart, BC, Canada. ($80m)&lt;br /&gt;
&lt;br /&gt;
31 MW Hydroelectric Project located on Cascade Creek near the border of British Columbia and Alaska.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Canadian Law, Reconciliation, Substantiating Delay Claims and Force Majeure.&amp;lt;br/&amp;gt;• Change Order Procedures and Project Schedule Reviews. &amp;lt;br/&amp;gt;• Cost Estimating, Project Cost Analysis and Contract Document Control.&amp;lt;br/&amp;gt;• Overseeing Company Owned Equipment Maintenance and Repairs. &amp;lt;br/&amp;gt;• Quality Control / Assurance for 7,150m Penstock Pipe Supply.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;div&amp;gt;&lt;br /&gt;
Site Civil Engineer &lt;br /&gt;
&lt;br /&gt;
[http://www.linkedin.com/company/carillion?trk=ppro_cprof Carillion Regional Civil Engineering]&lt;br /&gt;
&amp;lt;/div&amp;gt;&lt;br /&gt;
Public Company; 10,001+ employees; CLLN.L; Facilities Services industry&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2010-03-01&amp;quot;&amp;gt;March 2010&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2010-10-01&amp;quot;&amp;gt;October 2010&amp;lt;/abbr&amp;gt; (8 months) M56 Motorway - J7, Bowdon View Bridge Replacement Scheme, Cheshire. (£5m)&lt;br /&gt;
&lt;br /&gt;
Lift and Jacking of a new 2000t, offline bridge to replace existing westbound off-slip (Link to M6 Southbound) over 3 weekend periods, whilst minimising disruption for the Highways Agency (HA).&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;The initial bridge comprised a 2-span continuous deck, supported on reinforced concrete full height abutments and a circular column pier, located in the central reserve on the M56 Motorway.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Demolition of existing structure and re-opening of M56 completed in a 54-hour weekend possession. Installation of the new pre-cast 'A-Frame' Central Pier, installed in a 36-hour possession. Installation of new 2000t bridge constructed 500m from the final position.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Demolition and Installation Link: &amp;lt;br/&amp;gt;http://www.youtube.com/watch?v=usD3SwHkLRQ&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Time-lapse of bridge deck to final location Link:&amp;lt;br/&amp;gt;http://www.capture1.co.uk/videos/carrillionbridgemove.html &amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;• Approvals and reprogramming to meet overall completion dates. &amp;lt;br/&amp;gt;• Setting-out for all excavation, steelwork, blinding, concrete kickers and shuttering. &amp;lt;br/&amp;gt;• Completing Inductions for all sub-contractors and supervision of site works.&amp;lt;br/&amp;gt;• Detailing closures, diversions and construction methodology. &amp;lt;br/&amp;gt;• Facilitating engineering and surveying for several gangs.&amp;lt;br/&amp;gt;• Supervision of piling works during night possessions (24. No. Mini-piles - Keller Geotechnique).&lt;br /&gt;
&lt;br /&gt;
= Organisations =&lt;br /&gt;
&lt;br /&gt;
== Construction Society, School of Built and Natural Environment, University of Central Lancashire&amp;lt;br/&amp;gt; ==&lt;br /&gt;
&lt;br /&gt;
Committee Member, Steering Group&amp;lt;br/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
December 2012 to Present&amp;lt;br/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
A Society for the Students, Staff and Alumni of the Architectural Technology, Building Surveying, Construction Project Management, Facilities Management and Quantity Surveying courses at the School of Built and Natural Environment.&lt;br /&gt;
&lt;br /&gt;
= Education =&lt;br /&gt;
&lt;br /&gt;
=== University of Central Lancashire ===&lt;br /&gt;
&lt;br /&gt;
==== Bachelor of Science (BSc) Hons, Construction Project Management ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2010-01-01&amp;quot;&amp;gt;2010&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2013-12-31&amp;quot;&amp;gt;2013&amp;lt;/abbr&amp;gt; (expected)&lt;br /&gt;
&lt;br /&gt;
(Class: Expected: First Class - 1:0)&lt;br /&gt;
&lt;br /&gt;
Activities and Societies: Student Representative at the School of Built and Natural Environment.&lt;br /&gt;
&lt;br /&gt;
=== The University of Salford ===&lt;br /&gt;
&lt;br /&gt;
==== Bachelor of Science, Construction Management ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2009-01-01&amp;quot;&amp;gt;2009&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2010-12-31&amp;quot;&amp;gt;2010&amp;lt;/abbr&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Transferred / Advanced to second year at the University of Central Lancashire (UCLan).&lt;br /&gt;
&lt;br /&gt;
=== Stockport College of Technology ===&lt;br /&gt;
&lt;br /&gt;
==== BTEC National Diploma, Civil Engineering ====&lt;br /&gt;
&lt;br /&gt;
&amp;lt;abbr title=&amp;quot;2007-01-01&amp;quot;&amp;gt;2007&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2009-12-31&amp;quot;&amp;gt;2009&amp;lt;/abbr&amp;gt;&lt;br /&gt;
&lt;br /&gt;
(3 A*A*A* with Distinction)&lt;br /&gt;
&lt;br /&gt;
Activities and Societies: Student Representative for the School of Built Environment.&lt;br /&gt;
&lt;br /&gt;
=== Cheadle Hulme High School ===&lt;br /&gt;
&lt;br /&gt;
==== &amp;lt;abbr title=&amp;quot;2002-01-01&amp;quot;&amp;gt;2002&amp;lt;/abbr&amp;gt; – &amp;lt;abbr title=&amp;quot;2007-12-31&amp;quot;&amp;gt;2007&amp;lt;/abbr&amp;gt; ====&lt;br /&gt;
&lt;br /&gt;
Grade: 11 GCSE's at A*-C&lt;br /&gt;
&lt;br /&gt;
Activities and Societies: CHHS Basketball Team (Years 10-11)&lt;br /&gt;
&lt;br /&gt;
= Additional Information =&lt;br /&gt;
&lt;br /&gt;
== Groups and Associations: ==&lt;br /&gt;
undefined:&lt;br /&gt;
Institution of Civil Engineers (ICE), The Chartered Institute of Building (CIOB), Royal Institution of Chartered Surveyors (RICS), British Tunnelling Society (BTS), UK Tunnelling and Underground Construction Academy (TUCA)&lt;br /&gt;
&lt;br /&gt;
== Honors and Awards: ==&lt;br /&gt;
undefined:&lt;br /&gt;
National League Basketball, England Award Ceremony, 2004-2006, Trophies for Best Hustler and Point-Guard&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Cheadle Hulme High School Award Ceremony, 2007, Best in the School Year Achievement/Certificate in Manufacturing Engineering &amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;Stockport College Award Ceremony, 2009, Excellent Coursework in Civil Engineering &amp;amp; £50 cheque for 100% attendance throughout two years&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;The Chartered Institute of Building (CIOB), North West Branch, 2010-2013, Student Representative for North West Region, 2010-Present &amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;CIOB, The Queen Elizabeth II Jubilee Fund Scholarship 2012, 2012-2013, Award for distinction of intellect and character as evidenced by both scholastic attainments and by other extra-curricular activities&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;CIOB/Novus Group Student Challenge 2013, North West Branch, 2013, 1st Place, NW Regional Heat Winner. Held at the University of Salford&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;CIOB Student Challenge 2013, National Finals, Int. HQ, Ascot, UK, 2013, 2nd Place, Silver Medallist. Competed against 12 leading Universities in the UK&lt;br /&gt;
&lt;br /&gt;
== Contact Ryan for: ==&lt;br /&gt;
&amp;lt;div&amp;gt;*career opportunities&lt;br /&gt;
*consulting offers&lt;br /&gt;
*new ventures&lt;br /&gt;
*job inquiries&lt;br /&gt;
*expertise requests&lt;br /&gt;
*business deals&lt;br /&gt;
*reference requests&lt;br /&gt;
*getting back in touch&lt;br /&gt;
&amp;lt;/div&amp;gt;&lt;br /&gt;
&amp;lt;br/&amp;gt;&lt;/div&gt;</summary>
		<author><name>Raosullivan1</name></author>	</entry>

	</feed>