<?xml version="1.0"?>
<?xml-stylesheet type="text/css" href="https://www.designingbuildings.co.uk/skins/common/feed.css?301"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
		<id>https://www.designingbuildings.co.uk/w/index.php?feed=atom&amp;target=Magdaarent&amp;title=Special%3AContributions%2FMagdaarent</id>
		<title>Designing Buildings - User contributions [en]</title>
		<link rel="self" type="application/atom+xml" href="https://www.designingbuildings.co.uk/w/index.php?feed=atom&amp;target=Magdaarent&amp;title=Special%3AContributions%2FMagdaarent"/>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/Special:Contributions/Magdaarent"/>
		<updated>2026-04-15T00:39:31Z</updated>
		<subtitle>From Designing Buildings</subtitle>
		<generator>MediaWiki 1.17.4</generator>

	<entry>
		<id>https://www.designingbuildings.co.uk/wiki/RIBA_plan_of_work</id>
		<title>RIBA plan of work</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/RIBA_plan_of_work"/>
				<updated>2014-06-16T12:31:38Z</updated>
		
		<summary type="html">&lt;p&gt;Magdaarent: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;br /&gt;
The RIBA Plan of Work is published by the Royal Institute of British Architects (RIBA). The latest version is also is endorsed by the Chartered Institute of Architectural Technologists, the Construction Industry Council, the Royal Incorporation of Architects in Scotland, the Royal Society of Architects in Wales and the Royal Society of Ulster Architects.&lt;br /&gt;
&lt;br /&gt;
It was originally launched in 1963 as a fold out sheet that illustrated the roles of participants in design and construction in a simple matrix format. The first detailed plan of work was published in 1964 (ref Introduction, RIBA Plan of Work 2007).&lt;br /&gt;
&lt;br /&gt;
Split into a number of key project stages, the RIBA Plan of Work provides a shared framework for design and construction that offers both a process map and a management tool. Whilst it has never been clear that architects actually follow the detail of the plan in their day to day activities, the work stages have been used as a means of designating stage payments and identifying team members responsibilities when assessing insurance liabilities, and they commonly appear in contracts and appointment documents.&lt;br /&gt;
&lt;br /&gt;
The Plan of Work has evolved through its history to reflect the increasing complexity of projects, to incorporate increasing and changing regulatory requirements and to reflect the demands of industry and government reports criticising the industry. It has moved from a simple matrix representing just the traditional procurement route, to include multiple procurement routes, more diverse roles, multi-disciplinary teams, government gateways and to add stages before and after design and construction. It is supported by other RIBA publications such as the RIBA Job Book.&lt;br /&gt;
&lt;br /&gt;
The Plan of Work has been criticised for being too architect focussed, for missing many of the client tasks undertaken at the beginning of a project and for condensing construction into a single stage.&lt;br /&gt;
&lt;br /&gt;
The latest version, published in 2013 has moved online and has undergone a radical overhaul. It is now more flexible, with stages such as planning permission and procurement being moveable, it reflects increasing requirements for sustainability and Building Information Modelling (BIM) and it allows simple, project-specific plans to be created. In addition, the work stages have been re-structured and re-named.&lt;br /&gt;
&lt;br /&gt;
However, it has come in for considerable criticism as it is significantly less detailed than the previous 2007 edition, its flexibility and customisability is very limited and the definition and naming of work stages does not reflect the terminology that is used by the industry:&lt;br /&gt;
*0 - Strategic definition.&lt;br /&gt;
*1 - Preparation and brief.&lt;br /&gt;
*2 - Concept design.&lt;br /&gt;
*3 - Developed design.&lt;br /&gt;
*4 - Technical design.&lt;br /&gt;
*5 - Construction.&lt;br /&gt;
*6 - Handover and close out.&lt;br /&gt;
*7 - In use.&lt;br /&gt;
&lt;br /&gt;
There is also a BIM overlay and a sustainability overlay for the plan, but these do not seem to have been updated to reflect the 2013 work stage definitions.&lt;br /&gt;
&lt;br /&gt;
Other project plans that are available include the [http://www.bimtaskgroup.org/task-group-labs-portal/ BIM Task Group Digital Plan of Work], the OGC gateway review process (still used in government even though OGC no longer exists), and [[Check%20out%20our%20project%20plans|Designing Buildings Wiki project plans]] as well as plans from [http://www.oasys-software.com/products/email-and-document-management/definit.html CIC], CIBSE and the RICS.&lt;br /&gt;
&lt;br /&gt;
See also: [[RIBA%20plan%20of%20work%20v%20project%20plans%20v%20OGC%20gateways|Comparison between the RIBA plan of work 2013, RIBA plan of work 2007, Designing Buildings Wiki project plans and OGC gateways]].&lt;br /&gt;
&lt;br /&gt;
= Find out more =&lt;br /&gt;
&lt;br /&gt;
=== Related articles on Designing Buildings Wiki ===&lt;br /&gt;
*[[Check%20out%20our%20project%20plans|Designing Buildings Wiki project plans]].&lt;br /&gt;
*OGC gateway review process.&lt;br /&gt;
*Nbs.&lt;br /&gt;
*RIBA plan of work v project plans v OGC gateways.&lt;br /&gt;
*RIBA.&lt;br /&gt;
&lt;br /&gt;
[[Category:Design]]&lt;br /&gt;
[[Category:Appointments]]&lt;/div&gt;</summary>