<?xml version="1.0"?>
<?xml-stylesheet type="text/css" href="https://www.designingbuildings.co.uk/skins/common/feed.css?301"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
		<id>https://www.designingbuildings.co.uk/w/index.php?feed=atom&amp;target=Archi1000&amp;title=Special%3AContributions%2FArchi1000</id>
		<title>Designing Buildings - User contributions [en]</title>
		<link rel="self" type="application/atom+xml" href="https://www.designingbuildings.co.uk/w/index.php?feed=atom&amp;target=Archi1000&amp;title=Special%3AContributions%2FArchi1000"/>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/Special:Contributions/Archi1000"/>
		<updated>2026-05-12T16:27:02Z</updated>
		<subtitle>From Designing Buildings</subtitle>
		<generator>MediaWiki 1.17.4</generator>

	<entry>
		<id>https://www.designingbuildings.co.uk/wiki/Procurement_route_options_pros_and_cons</id>
		<title>Procurement route options pros and cons</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/Procurement_route_options_pros_and_cons"/>
				<updated>2016-01-11T15:48:04Z</updated>
		
		<summary type="html">&lt;p&gt;Archi1000: Created page with &amp;quot;= Traditional Procurement =  Good for:  * QUALITY – full design pre tender * DESIGN FLEXIBILITY – variations &amp;amp;amp; instructions * SPECIALIST SUB-CON’S – Named specialist ...&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;= Traditional Procurement =&lt;br /&gt;
&lt;br /&gt;
Good for:&lt;br /&gt;
&lt;br /&gt;
* QUALITY – full design pre tender&lt;br /&gt;
* DESIGN FLEXIBILITY – variations &amp;amp;amp; instructions&lt;br /&gt;
* SPECIALIST SUB-CON’S – Named specialist update sbc11&lt;br /&gt;
* DESIGN CONTROL – through arch/CA&lt;br /&gt;
* CDPs – eg. M&amp;amp;amp;E&lt;br /&gt;
* COMPLEX&lt;br /&gt;
* COST – lump sum cost benefits unless multiple changes made&lt;br /&gt;
&lt;br /&gt;
Not Suited for:&lt;br /&gt;
&lt;br /&gt;
* TIME – req full detailed pack pre tender&lt;br /&gt;
* COST – not a benefit if many changes made&lt;br /&gt;
* INCOMPLETE DRAWINGS – lead to delay, costs and claims of negligence&lt;br /&gt;
&lt;br /&gt;
Contract: SBC11&lt;br /&gt;
&lt;br /&gt;
* LUMP SUM PAYMENT&lt;br /&gt;
* CDM&lt;br /&gt;
* CDP’s&lt;br /&gt;
* NAMED SUB CONTRACTORS&lt;br /&gt;
* VARIATIONS/INSTRUCTIONS&lt;br /&gt;
* RETENTION&lt;br /&gt;
* COLLATERAL WARRANTIES&lt;br /&gt;
* TERMINATION PROVISIONS&lt;br /&gt;
* PREAGREED ALT DISPUTE RESOLUTION&lt;br /&gt;
&lt;br /&gt;
= D&amp;amp;amp;B Procurement =&lt;br /&gt;
&lt;br /&gt;
Good for:&lt;br /&gt;
&lt;br /&gt;
* TIME – Fast track, overlap design &amp;amp;amp; construction&lt;br /&gt;
* COST – lump sum/ GMP&lt;br /&gt;
* SINGLE POINT RESPONSIBILITY – Contractor design and build responsibility&lt;br /&gt;
* COMPLEX&lt;br /&gt;
* NOVATION – can benefit quality. Prior knowledge, sub-con drawing review&lt;br /&gt;
* CLIENT RISK LOW&lt;br /&gt;
* NAMED SUB-CON – in employers requirements&lt;br /&gt;
&lt;br /&gt;
Not suited for:&lt;br /&gt;
&lt;br /&gt;
* QUALITY – cheapest route to meet contract spec can lead to low quality products/ build quality.&lt;br /&gt;
* DESIGN FLEXIBILITY – request for change – costs/time implications&lt;br /&gt;
&lt;br /&gt;
Contract: DB11&lt;br /&gt;
&lt;br /&gt;
* CONTRACTOR TO COMPLETE DESIGN +CARRY OUT WORKS&lt;br /&gt;
* LUMP SUM/GMP&lt;br /&gt;
* CDM&lt;br /&gt;
* COLLATERAL WARRANTIES&lt;br /&gt;
* TERMINATION PROVISIONS&lt;br /&gt;
* RETENTION&lt;br /&gt;
* PRE AGREED DISPUTE RESOLUTION&lt;br /&gt;
&lt;br /&gt;
= Management Contracting Procurement =&lt;br /&gt;
&lt;br /&gt;
Good for:&lt;br /&gt;
&lt;br /&gt;
* COMPLEX/SPECIALIST – individually appointed packages to best suited sub-contractor&lt;br /&gt;
* POTENTIAL COST SAVING – Competitive tender&lt;br /&gt;
* TIME – Overlap design/construction&lt;br /&gt;
* QUALITY – each package subcontracted to specialist&lt;br /&gt;
* DESIGN FLEXIBILITY – changes can be made throughout construction. Potential costs.&lt;br /&gt;
&lt;br /&gt;
Not suited for:&lt;br /&gt;
&lt;br /&gt;
* INEXPERIENCED – risk high&lt;br /&gt;
* FIXED COST - Prime cost basis per package. Fluctuations.&lt;br /&gt;
* LACK OF AVAILABLE SPECIALISTS – would leave gaps in work to be undertaken.&lt;br /&gt;
&lt;br /&gt;
Contract: MC11&lt;br /&gt;
&lt;br /&gt;
* PRIME COST CONTRACT&lt;br /&gt;
* PROVISIONS FOR COLLATERAL WARRANTIES&lt;br /&gt;
* SUSTAINABILITY&lt;br /&gt;
* COLLABERATIVE WORKING&lt;br /&gt;
* THIRD PARTY RIGHTS – funder-contractor&lt;br /&gt;
&lt;br /&gt;
= Construction Management Procurement =&lt;br /&gt;
&lt;br /&gt;
Good for:&lt;br /&gt;
&lt;br /&gt;
* COMPLEX/SPECIALIST - individually appointed packages to best suited sub-contractor&lt;br /&gt;
* TIME - Overlap design/construction&lt;br /&gt;
&lt;br /&gt;
* DESIGN FLEXIBILITY - changes can be made throughout construction. Potential costs.&lt;br /&gt;
&lt;br /&gt;
* POTENTIAL COST SAVING - Competitive tender&lt;br /&gt;
* QUALITY - each package subcontracted to specialist&lt;br /&gt;
* ALL BUILDING TYPES&lt;br /&gt;
* EFFICIENCY – Early appointment of CM to aid programme&lt;br /&gt;
&lt;br /&gt;
Not suited for:&lt;br /&gt;
&lt;br /&gt;
* UNEXPERIENCED EMPLOYER – risk high as appointing trade contractors&lt;br /&gt;
* FIXED COST- Prime cost basis per package.&lt;br /&gt;
* LACK OF AVAILABLE SPECIALISTS&lt;br /&gt;
&lt;br /&gt;
Contracts:&lt;br /&gt;
&lt;br /&gt;
CM/TC11&lt;br /&gt;
&lt;br /&gt;
* EMPLOYER – TRADE CONTRACTOR&lt;br /&gt;
* LUMP SUM&lt;br /&gt;
* COLLATERAL WARRANTIES &amp;amp;amp; THIRD PARTY RIGHTS&lt;br /&gt;
* RETENTION&lt;br /&gt;
&lt;br /&gt;
CM/A&lt;br /&gt;
&lt;br /&gt;
* EMPLYER – CM&lt;br /&gt;
* COLLATERAL WARRANTIES&lt;br /&gt;
* SUSTAINABILITY&lt;/div&gt;</summary>
		<author><name>Archi1000</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/wiki/Procurement_Route_Pros_%26_Cons</id>
		<title>Procurement Route Pros &amp; Cons</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/Procurement_Route_Pros_%26_Cons"/>
				<updated>2016-01-11T15:43:13Z</updated>
		
		<summary type="html">&lt;p&gt;Archi1000: Created page with &amp;quot;Traditional Procurement  Good for:  * QUALITY – full design pre tender * DESIGN FLEXIBILITY – variations &amp;amp;amp; instructions * SPECIALIST SUB-CON’S – Named specialist upda...&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Traditional Procurement&lt;br /&gt;
&lt;br /&gt;
Good for:&lt;br /&gt;
&lt;br /&gt;
* QUALITY – full design pre tender&lt;br /&gt;
* DESIGN FLEXIBILITY – variations &amp;amp;amp; instructions&lt;br /&gt;
* SPECIALIST SUB-CON’S – Named specialist update sbc11&lt;br /&gt;
* DESIGN CONTROL – through arch/CA&lt;br /&gt;
* CDPs – eg. M&amp;amp;amp;E&lt;br /&gt;
* COMPLEX&lt;br /&gt;
* COST – lump sum cost benefits unless multiple changes made&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Not Suited for:&lt;br /&gt;
&lt;br /&gt;
* TIME – req full detailed pack pre tender&lt;br /&gt;
* COST – not a benefit if many changes made&lt;br /&gt;
* INCOMPLETE DRAWINGS – lead to delay, costs and claims of negligence&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Contract: SBC11&lt;br /&gt;
&lt;br /&gt;
* LUMP SUM PAYMENT&lt;br /&gt;
* CDM&lt;br /&gt;
* CDP’s&lt;br /&gt;
* NAMED SUB CONTRACTORS&lt;br /&gt;
* VARIATIONS/INSTRUCTIONS&lt;br /&gt;
* RETENTION&lt;br /&gt;
* COLLATERAL WARRANTIES&lt;br /&gt;
* TERMINATION PROVISIONS&lt;br /&gt;
* PREAGREED ALT DISPUTE RESOLUTION&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
D&amp;amp;amp;B Procurement&lt;br /&gt;
&lt;br /&gt;
Good for:&lt;br /&gt;
&lt;br /&gt;
* TIME – Fast track, overlap design &amp;amp;amp; construction&lt;br /&gt;
* COST – lump sum/ GMP&lt;br /&gt;
* SINGLE POINT RESPONSIBILITY – Contractor design and build responsibility&lt;br /&gt;
* COMPLEX&lt;br /&gt;
* NOVATION – can benefit quality. Prior knowledge, sub-con drawing review&lt;br /&gt;
* CLIENT RISK LOW&lt;br /&gt;
* NAMED SUB-CON – in employers requirements&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Not suited for:&lt;br /&gt;
&lt;br /&gt;
* QUALITY – cheapest route to meet contract spec can lead to low quality products/ build quality.&lt;br /&gt;
* DESIGN FLEXIBILITY – request for change – costs/time implications&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Contract: DB11&lt;br /&gt;
&lt;br /&gt;
* CONTRACTOR TO COMPLETE DESIGN +CARRY OUT WORKS&lt;br /&gt;
* LUMP SUM/GMP&lt;br /&gt;
* CDM&lt;br /&gt;
* COLLATERAL WARRANTIES&lt;br /&gt;
* TERMINATION PROVISIONS&lt;br /&gt;
* RETENTION&lt;br /&gt;
* PRE AGREED DISPUTE RESOLUTION&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Management Contracting Procurement&lt;br /&gt;
&lt;br /&gt;
Good for:&lt;br /&gt;
&lt;br /&gt;
* COMPLEX/SPECIALIST – individually appointed packages to best suited sub-contractor&lt;br /&gt;
* POTENTIAL COST SAVING – Competitive tender&lt;br /&gt;
* TIME – Overlap design/construction&lt;br /&gt;
* QUALITY – each package subcontracted to specialist&lt;br /&gt;
* DESIGN FLEXIBILITY – changes can be made throughout construction. Potential costs.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Not suited for:&lt;br /&gt;
&lt;br /&gt;
* INEXPERIENCED – risk high&lt;br /&gt;
* FIXED COST - Prime cost basis per package. Fluctuations.&lt;br /&gt;
* LACK OF AVAILABLE SPECIALISTS – would leave gaps in work to be undertaken.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Contract: MC11&lt;br /&gt;
&lt;br /&gt;
* PRIME COST CONTRACT&lt;br /&gt;
* PROVISIONS FOR COLLATERAL WARRANTIES&lt;br /&gt;
* SUSTAINABILITY&lt;br /&gt;
* COLLABERATIVE WORKING&lt;br /&gt;
* THIRD PARTY RIGHTS – funder-contractor&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Construction Management Procurement&lt;br /&gt;
&lt;br /&gt;
Good for:&lt;br /&gt;
&lt;br /&gt;
* COMPLEX/SPECIALIST - individually appointed packages to best suited sub-contractor&lt;br /&gt;
* TIME - Overlap design/construction&lt;br /&gt;
&lt;br /&gt;
* DESIGN FLEXIBILITY - changes can be made throughout construction. Potential costs.&lt;br /&gt;
&lt;br /&gt;
* POTENTIAL COST SAVING - Competitive tender&lt;br /&gt;
* QUALITY - each package subcontracted to specialist&lt;br /&gt;
* ALL BUILDING TYPES&lt;br /&gt;
* EFFICIENCY – Early appointment of CM to aid programme&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Not suited for:&lt;br /&gt;
&lt;br /&gt;
* UNEXPERIENCED EMPLOYER – risk high as appointing trade contractors&lt;br /&gt;
* FIXED COST- Prime cost basis per package.&lt;br /&gt;
* LACK OF AVAILABLE SPECIALISTS&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Contracts:&lt;br /&gt;
&lt;br /&gt;
CM/TC11&lt;br /&gt;
&lt;br /&gt;
* EMPLOYER – TRADE CONTRACTOR&lt;br /&gt;
* LUMP SUM&lt;br /&gt;
* COLLATERAL WARRANTIES &amp;amp;amp; THIRD PARTY RIGHTS&lt;br /&gt;
* RETENTION&lt;br /&gt;
&lt;br /&gt;
CM/A&lt;br /&gt;
&lt;br /&gt;
* EMPLYER – CM&lt;br /&gt;
* COLLATERAL WARRANTIES&lt;br /&gt;
* SUSTAINABILITY&lt;br /&gt;
&lt;br /&gt;
[[Category:Articles_needing_more_work]]&lt;/div&gt;</summary>
		<author><name>Archi1000</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/wiki/Legislative_framework_for_building_design_and_construction</id>
		<title>Legislative framework for building design and construction</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/Legislative_framework_for_building_design_and_construction"/>
				<updated>2016-01-05T17:21:53Z</updated>
		
		<summary type="html">&lt;p&gt;Archi1000: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Town and Country Planning&lt;br /&gt;
&lt;br /&gt;
* Local Plan (LDF)&lt;br /&gt;
&lt;br /&gt;
-Based on guidance from NPPF&lt;br /&gt;
&lt;br /&gt;
-Provides guidance for local planning objectives + policies&lt;br /&gt;
&lt;br /&gt;
CONSULT: LA website for LDF&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* NPPF&lt;br /&gt;
&lt;br /&gt;
-Consult for 12 core planning principles (Paragraph 17)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* PLANNING HISTORY&lt;br /&gt;
&lt;br /&gt;
-Any previous relevant objections&lt;br /&gt;
&lt;br /&gt;
CONSULT: Planning Portal&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* SECTION 106 (If large project)&lt;br /&gt;
&lt;br /&gt;
-May be required for planning obligations that improve local area as compromise for disruption.&lt;br /&gt;
&lt;br /&gt;
CONSULT: Local Planning Authority&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Conservation Area&lt;br /&gt;
&lt;br /&gt;
-Permission required for demolition and alterations&lt;br /&gt;
&lt;br /&gt;
-Article 4 may apply (prevents permitted development)&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LA planning website (see if area is a CA)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* NPPF section 12 (for guidance of objectives and policies.)&lt;br /&gt;
&lt;br /&gt;
-Conservation Officer (for advice)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Listed Building -Criminal offence to alter/demo without Listed Building Consent&lt;br /&gt;
&lt;br /&gt;
CONSULT: -Local Planning Authority (for consent)&lt;br /&gt;
&lt;br /&gt;
-Historic England Website (determine if listed)&lt;br /&gt;
&lt;br /&gt;
-Planning Permission if external also required.&lt;br /&gt;
&lt;br /&gt;
LEGISL: -‘Listed Buildings and Conservation areas act 1990’&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Scheduled Monument&lt;br /&gt;
&lt;br /&gt;
-National Importance?&lt;br /&gt;
&lt;br /&gt;
-Scheduled monument consent if affect&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LPA (for consent)&lt;br /&gt;
&lt;br /&gt;
-Historic England (determine if scheduled)&lt;br /&gt;
&lt;br /&gt;
-Planning Consultant (advice best approach)&lt;br /&gt;
&lt;br /&gt;
LEGISL: -Ancient Monuments + archaeological Areas act 1979&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Change of Use -If required. See use category.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2. SUSTAINABILITY + H&amp;amp;amp;S&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Flood Risk&lt;br /&gt;
&lt;br /&gt;
-NPPF Sec 10 – need to be careful when choosing site&lt;br /&gt;
&lt;br /&gt;
CONSULT: -Environment agency&lt;br /&gt;
&lt;br /&gt;
-Flood Risk Assessment (Hydrologist report)&lt;br /&gt;
&lt;br /&gt;
LEGISL: -Environment act 1995&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Wildlife&lt;br /&gt;
&lt;br /&gt;
-Protected species (bats/newts/birds etc…)&lt;br /&gt;
&lt;br /&gt;
-Possible to restore habitat/ rehome&lt;br /&gt;
&lt;br /&gt;
CONSULT: Natural England (requires surveys + reports)&lt;br /&gt;
&lt;br /&gt;
LEGISL: The Conservation of habitats + species regs 2010&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Contamination&lt;br /&gt;
&lt;br /&gt;
-NPPF Sec 11 (120) states developer’s responsibility to decontaminate&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LA (to arrange inspection)&lt;br /&gt;
&lt;br /&gt;
-Environment agency&lt;br /&gt;
&lt;br /&gt;
LEGISL: -Environmental Protection Act 1990&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Green Belt&lt;br /&gt;
&lt;br /&gt;
-NPPF Sec 9 protects this&lt;br /&gt;
&lt;br /&gt;
-CONSULT: -LPA to establish if land is GB.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* CDM&lt;br /&gt;
&lt;br /&gt;
-Make client aware of responsibilities involved with CDM regs 2015&lt;br /&gt;
&lt;br /&gt;
-Ensures H&amp;amp;amp;S properly considered throughout development to reduce risk of harm to those who build, use and maintain it.&lt;br /&gt;
&lt;br /&gt;
-Applies from start inc site inspections (esp if suspected contamination)&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LA Environmental Health (for info on site)&lt;br /&gt;
&lt;br /&gt;
LEGISL: -CDM regulations 2015&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Asbestos&lt;br /&gt;
&lt;br /&gt;
-Req survey + removal by competent surveyor/contractor&lt;br /&gt;
&lt;br /&gt;
LEGISL: -Control of asbestos regs 2012&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Highways&lt;br /&gt;
&lt;br /&gt;
CONSULT:&lt;br /&gt;
&lt;br /&gt;
-Highways agency (if subject to change of access)&lt;br /&gt;
&lt;br /&gt;
-Local Plan&lt;br /&gt;
&lt;br /&gt;
-LA (may require discussion over sec 106 agreement)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
LEGISL:&lt;br /&gt;
&lt;br /&gt;
-Highways act 1980&lt;br /&gt;
&lt;br /&gt;
Section 106 agreement (as compromise disruption)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Party Walls&lt;br /&gt;
&lt;br /&gt;
-Prior to works, must give notice to adjoining neighbours of intention to build on boundary line/within 6 meters of it.&lt;br /&gt;
&lt;br /&gt;
-Act provides mechanism for resolving disputes.&lt;br /&gt;
&lt;br /&gt;
CONSULT: Adjoining Owner&lt;br /&gt;
&lt;br /&gt;
LEGISL: Party Wall Act 1996&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3. Land Law&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Boundaries:&lt;br /&gt;
&lt;br /&gt;
-Consult to establish boundaries.&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LA&lt;br /&gt;
&lt;br /&gt;
-Land Registry&lt;br /&gt;
&lt;br /&gt;
-Client&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Easements&lt;br /&gt;
&lt;br /&gt;
-Rights any party may have over the land.&lt;br /&gt;
&lt;br /&gt;
-Right of way&lt;br /&gt;
&lt;br /&gt;
-Right of support&lt;br /&gt;
&lt;br /&gt;
-Right of light&lt;br /&gt;
&lt;br /&gt;
CONSULT:&lt;br /&gt;
&lt;br /&gt;
-Land registry&lt;br /&gt;
&lt;br /&gt;
-Charted building surveyor specialising in ROL&lt;br /&gt;
&lt;br /&gt;
LEGISL: -Land registration act 2002&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Restrictive Covenants&lt;br /&gt;
&lt;br /&gt;
-Restrictions to the site such as: -land to remain open space/ prevent development/ prevent business use?&lt;br /&gt;
&lt;br /&gt;
CONSULT: -Land registry&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Wayleaves&lt;br /&gt;
&lt;br /&gt;
-annually renewed right of use by apparatus over or under someone else’s land for which payment is made.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Tree Preservation order&lt;br /&gt;
&lt;br /&gt;
-may apply to trees on site.&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LA&lt;br /&gt;
&lt;br /&gt;
LEGISL: -T+C planning (Tree Preservation) regs 2012&lt;br /&gt;
&lt;br /&gt;
[[Category:Articles_needing_more_work]]&lt;/div&gt;</summary>
		<author><name>Archi1000</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/wiki/Legislative_framework_for_building_design_and_construction</id>
		<title>Legislative framework for building design and construction</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/Legislative_framework_for_building_design_and_construction"/>
				<updated>2016-01-05T17:20:15Z</updated>
		
		<summary type="html">&lt;p&gt;Archi1000: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Town and Country Planning&lt;br /&gt;
&lt;br /&gt;
* Local Plan (LDF)&lt;br /&gt;
&lt;br /&gt;
-Based on guidance from NPPF&lt;br /&gt;
&lt;br /&gt;
-Provides guidance for local planning objectives + policies&lt;br /&gt;
&lt;br /&gt;
CONSULT: LA website for LDF&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* NPPF&lt;br /&gt;
&lt;br /&gt;
-Consult for 12 core planning principles (Paragraph 17)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* PLANNING HISTORY&lt;br /&gt;
&lt;br /&gt;
-Any previous relevant objections&lt;br /&gt;
&lt;br /&gt;
CONSULT: Planning Portal&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* SECTION 106 (If large project)&lt;br /&gt;
&lt;br /&gt;
-May be required for planning obligations that improve local area as compromise for disruption.&lt;br /&gt;
&lt;br /&gt;
CONSULT: Local Planning Authority&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Conservation Area&lt;br /&gt;
&lt;br /&gt;
-Permission required for demolition and alterations&lt;br /&gt;
&lt;br /&gt;
-Article 4 may apply (prevents permitted development)&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LA planning website (see if area is a CA)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* NPPF section 12 (for guidance of objectives and policies.)&lt;br /&gt;
&lt;br /&gt;
-Conservation Officer (for advice)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Listed Building -Criminal offence to alter/demo without Listed Building Consent&lt;br /&gt;
&lt;br /&gt;
CONSULT: -Local Planning Authority (for consent)&lt;br /&gt;
&lt;br /&gt;
-Historic England Website (determine if listed)&lt;br /&gt;
&lt;br /&gt;
-Planning Permission if external also required.&lt;br /&gt;
&lt;br /&gt;
LEGISL: -‘Listed Buildings and Conservation areas act 1990’&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Scheduled Monument&lt;br /&gt;
&lt;br /&gt;
-National Importance?&lt;br /&gt;
&lt;br /&gt;
-Scheduled monument consent if affect&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LPA (for consent)&lt;br /&gt;
&lt;br /&gt;
-Historic England (determine if scheduled)&lt;br /&gt;
&lt;br /&gt;
-Planning Consultant (advice best approach)&lt;br /&gt;
&lt;br /&gt;
LEGISL: -Ancient Monuments + archaeological Areas act 1979&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Change of Use -If required. See use category.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2. SUSTAINABILITY + H&amp;amp;amp;S&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Flood Risk&lt;br /&gt;
&lt;br /&gt;
-NPPF Sec 10 – need to be careful when choosing site&lt;br /&gt;
&lt;br /&gt;
CONSULT: -Environment agency&lt;br /&gt;
&lt;br /&gt;
-Flood Risk Assessment (Hydrologist report)&lt;br /&gt;
&lt;br /&gt;
LEGISL: -Environment act 1995&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Wildlife&lt;br /&gt;
&lt;br /&gt;
-Protected species (bats/newts/birds etc…)&lt;br /&gt;
&lt;br /&gt;
-Possible to restore habitat/ rehome&lt;br /&gt;
&lt;br /&gt;
CONSULT: Natural England (requires surveys + reports)&lt;br /&gt;
&lt;br /&gt;
LEGISL: The Conservation of habitats + species regs 2010&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Contamination&lt;br /&gt;
&lt;br /&gt;
-NPPF Sec 11 (120) states developer’s responsibility to decontaminate&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LA (to arrange inspection)&lt;br /&gt;
&lt;br /&gt;
-Environment agency&lt;br /&gt;
&lt;br /&gt;
LEGISL: -Environmental Protection Act 1990&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Green Belt&lt;br /&gt;
&lt;br /&gt;
-NPPF Sec 9 protects this&lt;br /&gt;
&lt;br /&gt;
-CONSULT: -LPA to establish if land is GB.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* CDM&lt;br /&gt;
&lt;br /&gt;
-Make client aware of responsibilities involved with CDM regs 2015&lt;br /&gt;
&lt;br /&gt;
-Ensures H&amp;amp;amp;S properly considered throughout development to reduce risk of harm to those who build, use and maintain it.&lt;br /&gt;
&lt;br /&gt;
-Applies from start inc site inspections (esp if suspected contamination)&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LA Environmental Health (for info on site)&lt;br /&gt;
&lt;br /&gt;
LEGISL: -CDM regulations 2015&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Asbestos&lt;br /&gt;
&lt;br /&gt;
-Req survey + removal by competent surveyor/contractor&lt;br /&gt;
&lt;br /&gt;
LEGISL: -Control of asbestos regs 2012&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Highways&lt;br /&gt;
&lt;br /&gt;
CONSULT:&lt;br /&gt;
&lt;br /&gt;
-Highways agency (if subject to change of access)&lt;br /&gt;
&lt;br /&gt;
-Local Plan&lt;br /&gt;
&lt;br /&gt;
-LA (may require discussion over sec 106 agreement)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
LEGISL:&lt;br /&gt;
&lt;br /&gt;
-Highways act 1980&lt;br /&gt;
&lt;br /&gt;
Section 106 agreement (as compromise disruption)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Party Walls&lt;br /&gt;
&lt;br /&gt;
-Prior to works, must give notice to adjoining neighbours of intention to build on boundary line/within 6 meters of it.&lt;br /&gt;
&lt;br /&gt;
-Act provides mechanism for resolving disputes.&lt;br /&gt;
&lt;br /&gt;
CONSULT: Adjoining Owner&lt;br /&gt;
&lt;br /&gt;
LEGISL: Party Wall Act 1996&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3. Land Law&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Boundaries:&lt;br /&gt;
&lt;br /&gt;
-Consult to establish boundaries.&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LA&lt;br /&gt;
&lt;br /&gt;
-Land Registry&lt;br /&gt;
&lt;br /&gt;
-Client&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Easements&lt;br /&gt;
&lt;br /&gt;
-Rights any party may have over the land.&lt;br /&gt;
&lt;br /&gt;
-Right of way&lt;br /&gt;
&lt;br /&gt;
-Right of support&lt;br /&gt;
&lt;br /&gt;
-Right of light&lt;br /&gt;
&lt;br /&gt;
CONSULT:&lt;br /&gt;
&lt;br /&gt;
-Land registry&lt;br /&gt;
&lt;br /&gt;
-Charted building surveyor specialising in ROL&lt;br /&gt;
&lt;br /&gt;
LEGISL: -Land registration act 2002&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Restrictive Covenants&lt;br /&gt;
&lt;br /&gt;
-Restrictions to the site such as: -land to remain open space/ prevent development/ prevent business use?&lt;br /&gt;
&lt;br /&gt;
CONSULT: -Land registry&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Wayleaves&lt;br /&gt;
&lt;br /&gt;
-annually renewed right of use by apparatus over or under someone else’s land for which payment is made.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Tree Preservation order&lt;br /&gt;
&lt;br /&gt;
-may apply to trees on site.&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LA&lt;br /&gt;
&lt;br /&gt;
LEGISL: -T+C planning (Tree Preservation) regs 2012&lt;/div&gt;</summary>
		<author><name>Archi1000</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/wiki/Legislative_framework_for_building_design_and_construction</id>
		<title>Legislative framework for building design and construction</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/Legislative_framework_for_building_design_and_construction"/>
				<updated>2016-01-05T17:04:37Z</updated>
		
		<summary type="html">&lt;p&gt;Archi1000: Created page with &amp;quot;Town and Country Planning  Local Plan (LDF) -Based on guidance from NPPF  -Provides guidance for local planning objectives + policies  CONSULT: LA website for LDF      NPPF -Cons...&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Town and Country Planning&lt;br /&gt;
&lt;br /&gt;
Local Plan (LDF) -Based on guidance from NPPF&lt;br /&gt;
&lt;br /&gt;
-Provides guidance for local planning objectives + policies&lt;br /&gt;
&lt;br /&gt;
CONSULT: LA website for LDF&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
NPPF -Consult for 12 core planning principles (Paragraph 17)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Planning -Any previous relevant objections&lt;br /&gt;
&lt;br /&gt;
(History) CONSULT: Planning Portal&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Section 106 -May be required for planning obligations that improve local area as compromise for disruption.&lt;br /&gt;
&lt;br /&gt;
(If large project)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
CONSULT: Local Planning Authority&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Conservation -Permission required for demolition and alterations&lt;br /&gt;
&lt;br /&gt;
Area -Article 4 may apply (prevents permitted development)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LA planning website (see if area is a CA)&lt;br /&gt;
&lt;br /&gt;
-NPPF section 12 (for guidance of objectives and policies.)&lt;br /&gt;
&lt;br /&gt;
-Conservation Officer (for advice)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Listed Building -Criminal offence to alter/demo without Listed Building Consent&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
CONSULT: -Local Planning Authority (for consent)&lt;br /&gt;
&lt;br /&gt;
-Historic England Website (determine if listed)&lt;br /&gt;
&lt;br /&gt;
-Planning Permission if external also required.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
LEGISL: -‘Listed Buildings and Conservation areas act 1990’&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Scheduled -National Importance?&lt;br /&gt;
&lt;br /&gt;
Monument -Scheduled monument consent if affect&lt;br /&gt;
&lt;br /&gt;
(Archaeology)&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LPA (for consent)&lt;br /&gt;
&lt;br /&gt;
-Historic England (determine if scheduled)&lt;br /&gt;
&lt;br /&gt;
-Planning Consultant (advice best approach)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
LEGISL: -Ancient Monuments + archaeological Areas act 1979&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Change of Use -If required. See use category.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Sustainability + H&amp;amp;amp;S&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Flood Risk -NPPF Sec 10 – need to be careful when choosing site&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
CONSULT: -Environment agency&lt;br /&gt;
&lt;br /&gt;
-Flood Risk Assessment (Hydrologist report)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
LEGISL: -Environment act 1995&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Wildlife -Protected species (bats/newts/birds etc…)&lt;br /&gt;
&lt;br /&gt;
-Possible to restore habitat/ rehome&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
CONSULT: Natural England (requires surveys + reports)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
LEGISL: The Conservation of habitats + species regs 2010&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Contamination -NPPF Sec 11 (120) states developer’s responsibility to decontaminate&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LA (to arrange inspection)&lt;br /&gt;
&lt;br /&gt;
-Environment agency&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
LEGISL: -Environmental Protection Act 1990&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Green Belt -NPPF Sec 9 protects this&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LPA to establish if land is GB.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
CDM -Make client aware of responsibilities involved with CDM regs 2015&lt;br /&gt;
&lt;br /&gt;
-Ensures H&amp;amp;amp;S properly considered throughout development to reduce risk of harm to those who build, use and maintain it.&lt;br /&gt;
&lt;br /&gt;
-Applies from start inc site inspections (esp if suspected contamination)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LA Environmental Health (for info on site)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
LEGISL: -CDM regulations 2015&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Asbestos -Req survey + removal by competent surveyor/contractor&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
LEGISL: -Control of asbestos regs 2012&lt;br /&gt;
&lt;br /&gt;
Highways CONSULT: -Highways agency (if subject to change of access)&lt;br /&gt;
&lt;br /&gt;
-Local Plan&lt;br /&gt;
&lt;br /&gt;
-LA (may require discussion over sec 106 agreement)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
LEGISL: -Highways act 1980&lt;br /&gt;
&lt;br /&gt;
-Section 106 agreement (as compromise disruption)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Party Walls -prior to works, must give notice to adjoining neighbours of intention to build on boundary line/within 6 meters of it.&lt;br /&gt;
&lt;br /&gt;
-Act provides mechanism for resolving disputes.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
CONSULT: Adjoining Owner&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
LEGISL: Party Wall Act 1996&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Land Law&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
BOUNDARIES: -Consult to establish boundaries.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
CONSULT: -LA&lt;br /&gt;
&lt;br /&gt;
-Land Registry&lt;br /&gt;
&lt;br /&gt;
-Client&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Easements -Rights any party may have over the land. -Right of way&lt;br /&gt;
&lt;br /&gt;
-Right of support&lt;br /&gt;
&lt;br /&gt;
-Right of light&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
CONSULT: -Land registry&lt;br /&gt;
&lt;br /&gt;
-Charted building surveyor specialising in ROL&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
LEGISL: -Land registration act 2002&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Restrictive -Restrictions to the site such as: -land to remain open space?&lt;br /&gt;
&lt;br /&gt;
Covenants -prevent development?&lt;br /&gt;
&lt;br /&gt;
-Prevent business use?&lt;br /&gt;
&lt;br /&gt;
CONSULT: -Land registry&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Wayleaves -annually renewed right of use by apparatus over or under someone else’s land for which payment is made.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Tree -may apply to trees on site.&lt;br /&gt;
&lt;br /&gt;
Preservation&lt;br /&gt;
&lt;br /&gt;
Order CONSULT: -LA&lt;br /&gt;
&lt;br /&gt;
LEGISL: -T+C planning (Tree Preservation) regs 2012&lt;/div&gt;</summary>
		<author><name>Archi1000</name></author>	</entry>

	</feed>