<?xml version="1.0"?>
<?xml-stylesheet type="text/css" href="https://www.designingbuildings.co.uk/skins/common/feed.css?301"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
		<id>https://www.designingbuildings.co.uk/w/index.php?feed=atom&amp;target=Alison_Ewins&amp;title=Special%3AContributions%2FAlison_Ewins</id>
		<title>Designing Buildings - User contributions [en]</title>
		<link rel="self" type="application/atom+xml" href="https://www.designingbuildings.co.uk/w/index.php?feed=atom&amp;target=Alison_Ewins&amp;title=Special%3AContributions%2FAlison_Ewins"/>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/Special:Contributions/Alison_Ewins"/>
		<updated>2026-06-03T04:59:29Z</updated>
		<subtitle>From Designing Buildings</subtitle>
		<generator>MediaWiki 1.17.4</generator>

	<entry>
		<id>https://www.designingbuildings.co.uk/wiki/BREEAM_Construction_waste_management</id>
		<title>BREEAM Construction waste management</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/BREEAM_Construction_waste_management"/>
				<updated>2018-02-23T11:36:59Z</updated>
		
		<summary type="html">&lt;p&gt;Alison Ewins: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;= Aim and benefits =&lt;br /&gt;
&lt;br /&gt;
To promote resource efficiency via the effective management and reduction of construction waste.&lt;br /&gt;
&lt;br /&gt;
= When to consider =&lt;br /&gt;
&lt;br /&gt;
Pre demolition audit needs to be considered before demolition takes place.&lt;br /&gt;
&lt;br /&gt;
Resource Management Plan (RMP)/ Site Waste Management Plan (SWMP) needs to be considered before work on site starts&lt;br /&gt;
&lt;br /&gt;
= Step by step guidance =&lt;br /&gt;
&lt;br /&gt;
Pre demolition audit&lt;br /&gt;
&lt;br /&gt;
Pre-demo audit should be produced by the company doing the demolition (could be main contractor or a demolition contractor). Make sure it lists any materials on the existing site, amounts and potential applications.&lt;br /&gt;
&lt;br /&gt;
i.e. Timber doors-20 m3- recycle&lt;br /&gt;
&lt;br /&gt;
OR&lt;br /&gt;
&lt;br /&gt;
Concrete-100m3- crush and re-use on site.&lt;br /&gt;
&lt;br /&gt;
Make sure the pre-demo audit is referenced in the RMP/SWMP&lt;br /&gt;
&lt;br /&gt;
SWMP/RMP&lt;br /&gt;
&lt;br /&gt;
Most contractors will have their own template. Make sure it contains all the information required for BREEAM.&lt;br /&gt;
&lt;br /&gt;
A compliant RMP is one that defines:&lt;br /&gt;
&lt;br /&gt;
# A target benchmark for resource efficiency, i.e. m³ of waste per 100m² or tonnes of waste per 100m²&lt;br /&gt;
# Procedures and commitments for minimising non-hazardous waste in line with the target benchmark&lt;br /&gt;
# Procedures for minimising hazardous waste&lt;br /&gt;
# A waste minimisation target and details of waste minimisation actions to be undertaken&lt;br /&gt;
# Procedures for estimating, monitoring, measuring and reporting hazardous and non-hazardous site waste. If waste data is obtained from licensed external waste contractors, the data needs to be reliable and verifiable, e.g. by using data from EA/SEPA/EA Wales/NIEA Waste Return Forms&lt;br /&gt;
# Procedures for sorting, reusing and recycling construction waste into defined waste groups (see additional guidance section), either on-site or through a licensed external contractor&lt;br /&gt;
# Procedures for reviewing and updating the plan&lt;br /&gt;
# The name or job title of the individual responsible for implementing the above.&lt;br /&gt;
&lt;br /&gt;
When setting targets ask the contractor to look back at previous projects final waste figures to give a sensible estimate for the next project. It’s easy to set a tight target and get credits at design stage, but if the target isn’t met credits may be lost at Post Construction stage.&lt;br /&gt;
&lt;br /&gt;
At PC stage get final waste figures from waste carrier/s and contractor. Calculate total waste per 100 sq m GIFA. This should exclude excavation waste.&lt;br /&gt;
&lt;br /&gt;
Get final figures from waste carrier/s, contractor and demo contractor for diverting waste from landfill.&lt;br /&gt;
&lt;br /&gt;
Report all figures on the BREEAM scoring and reporting tool.&lt;br /&gt;
&lt;br /&gt;
= Questions to ask while seeking compliance =&lt;br /&gt;
&lt;br /&gt;
Is site team aware that RMP is required and must be updated throughout construction?&lt;br /&gt;
&lt;br /&gt;
Is demo contractor aware that pre-demo audit must be carried out before demolition?&lt;br /&gt;
&lt;br /&gt;
Is demo contractor aware that diversion from landfill rates will be needed after demolition has taken place?&lt;br /&gt;
&lt;br /&gt;
= Tools and resources =&lt;br /&gt;
&lt;br /&gt;
Example pre-demolition audits and SWMP/RMP can be found on the internet by googling them.&lt;br /&gt;
&lt;br /&gt;
Follow guidance from:&lt;br /&gt;
&lt;br /&gt;
* Defra (Department of Environment, Food and Rural Affairs) [https://www.gov.uk/government/policies/waste-and-recycling https://www.gov.uk/government/policies/waste-and-recycling]&lt;br /&gt;
* BRE (Building Research Establishment Ltd) [https://www.bre.co.uk/Waste_and_recycling.html https://www.bre.co.uk/Waste_and_recycling.html]&lt;br /&gt;
* WRAP (Waste and Resources Action Programme) [http://www.wrap.org.uk/ http://www.wrap.org.uk/]&lt;br /&gt;
* Welsh Government. [http://gov.wales/?lang=en http://gov.wales/?lang=en]&lt;br /&gt;
&lt;br /&gt;
= Tips and best practice =&lt;br /&gt;
&lt;br /&gt;
Most contractors will have other useful documents that may be used to supplement SWMPs where they don’t contain all the information needed. e.g. Project Environmental Plan. Reference this and submit as evidence.&lt;br /&gt;
&lt;br /&gt;
= Typical evidence =&lt;br /&gt;
&lt;br /&gt;
SWMP/RMP&lt;br /&gt;
&lt;br /&gt;
Pre-demolition audit&lt;br /&gt;
&lt;br /&gt;
Final waste figures&lt;br /&gt;
&lt;br /&gt;
KPIs&lt;br /&gt;
&lt;br /&gt;
Waste carrier records&lt;br /&gt;
&lt;br /&gt;
Project Environmental Plan&lt;br /&gt;
&lt;br /&gt;
=  =&lt;br /&gt;
&lt;br /&gt;
-----&lt;br /&gt;
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.&lt;br /&gt;
&lt;br /&gt;
--[[User:Alison Ewins|Alison Ewins]] 11:36, 23 Feb 2018 (BST)&lt;br /&gt;
&lt;br /&gt;
[[Category:BREEAM]]&lt;/div&gt;</summary>
		<author><name>Alison Ewins</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/wiki/BREEAM_Construction_waste_management</id>
		<title>BREEAM Construction waste management</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/BREEAM_Construction_waste_management"/>
				<updated>2018-02-23T11:17:29Z</updated>
		
		<summary type="html">&lt;p&gt;Alison Ewins: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;= Aim and benefits =&lt;br /&gt;
&lt;br /&gt;
To promote resource efficiency via the effective management and reduction of construction waste.&lt;br /&gt;
&lt;br /&gt;
= When to consider =&lt;br /&gt;
&lt;br /&gt;
Pre demolition audit needs to be considered before demolition takes place.&lt;br /&gt;
&lt;br /&gt;
Resource Management Plan (RMP)/ Site Waste Management Plan (SWMP) needs to be considered before work on site starts&lt;br /&gt;
&lt;br /&gt;
= Step by step guidance =&lt;br /&gt;
&lt;br /&gt;
Pre demolition audit&lt;br /&gt;
&lt;br /&gt;
Pre-demo audit should be produced by the company doing the demolition (could be main contractor or a demolition contractor). Make sure it lists any materials on the existing site, amounts and potential applications.&lt;br /&gt;
&lt;br /&gt;
i.e. Timber doors-20 m3- recycle&lt;br /&gt;
&lt;br /&gt;
OR&lt;br /&gt;
&lt;br /&gt;
Concrete-100m3- crush and re-use on site.&lt;br /&gt;
&lt;br /&gt;
Make sure the pre-demo audit is referenced in the RMP/SWMP&lt;br /&gt;
&lt;br /&gt;
SWMP/RMP&lt;br /&gt;
&lt;br /&gt;
Most contractors will have their own template. Make sure it contains all the information required for BREEAM.&lt;br /&gt;
&lt;br /&gt;
A compliant RMP is one that defines:&lt;br /&gt;
&lt;br /&gt;
# A target benchmark for resource efficiency, i.e. m³ of waste per 100m² or tonnes of waste per 100m²&lt;br /&gt;
# Procedures and commitments for minimising non-hazardous waste in line with the target benchmark&lt;br /&gt;
# Procedures for minimising hazardous waste&lt;br /&gt;
# A waste minimisation target and details of waste minimisation actions to be undertaken&lt;br /&gt;
# Procedures for estimating, monitoring, measuring and reporting hazardous and non-hazardous site waste. If waste data is obtained from licensed external waste contractors, the data needs to be reliable and verifiable, e.g. by using data from EA/SEPA/EA Wales/NIEA Waste Return Forms&lt;br /&gt;
# Procedures for sorting, reusing and recycling construction waste into defined waste groups (see additional guidance section), either on-site or through a licensed external contractor&lt;br /&gt;
# Procedures for reviewing and updating the plan&lt;br /&gt;
# The name or job title of the individual responsible for implementing the above.&lt;br /&gt;
&lt;br /&gt;
When setting targets ask the contractor to look back at previous projects final waste figures to give a sensible estimate for the next project. It’s easy to set a tight target and get credits at design stage, but if the target isn’t met credits may be lost at Post Construction stage.&lt;br /&gt;
&lt;br /&gt;
At PC stage get final waste figures from waste carrier/s and contractor. Calculate total waste per 100 sq m GIFA. This should exclude excavation waste.&lt;br /&gt;
&lt;br /&gt;
Get final figures from waste carrier/s, contractor and demo contractor for diverting waste from landfill.&lt;br /&gt;
&lt;br /&gt;
Report all figures on the BREEAM scoring and reporting tool.&lt;br /&gt;
&lt;br /&gt;
= Questions to ask while seeking compliance =&lt;br /&gt;
&lt;br /&gt;
Is site team aware that RMP is required and must be updated throughout construction?&lt;br /&gt;
&lt;br /&gt;
Is demo contractor aware that pre-demo audit must be carried out before demolition?&lt;br /&gt;
&lt;br /&gt;
Is demo contractor aware that diversion from landfill rates will be needed after demolition has taken place?&lt;br /&gt;
&lt;br /&gt;
= Tools and resources =&lt;br /&gt;
&lt;br /&gt;
Example pre-demolition audits and SWMP/RMP can be found on the internet by googling them.&lt;br /&gt;
&lt;br /&gt;
Follow guidance from:&lt;br /&gt;
&lt;br /&gt;
* Defra (Department of Environment, Food and Rural Affairs) [https://www.gov.uk/government/policies/waste-and-recycling https://www.gov.uk/government/policies/waste-and-recycling]&lt;br /&gt;
* BRE (Building Research Establishment Ltd) [https://www.bre.co.uk/Waste_and_recycling.html https://www.bre.co.uk/Waste_and_recycling.html]&lt;br /&gt;
* WRAP (Waste and Resources Action Programme) [http://www.wrap.org.uk/ http://www.wrap.org.uk/]&lt;br /&gt;
* Welsh Government. [http://gov.wales/?lang=en http://gov.wales/?lang=en]&lt;br /&gt;
&lt;br /&gt;
= Tips and best practice =&lt;br /&gt;
&lt;br /&gt;
Most contractors will have other useful documents that may be used to supplement SWMPs where they don’t contain all the information needed. e.g. Project Environmental Plan. Reference this and submit as evidence.&lt;br /&gt;
&lt;br /&gt;
= Typical evidence =&lt;br /&gt;
&lt;br /&gt;
SWMP/RMP&lt;br /&gt;
&lt;br /&gt;
Pre-demolition audit&lt;br /&gt;
&lt;br /&gt;
Final waste figures&lt;br /&gt;
&lt;br /&gt;
KPIs&lt;br /&gt;
&lt;br /&gt;
Waste carrier records&lt;br /&gt;
&lt;br /&gt;
Project Environmental Plan&lt;br /&gt;
&lt;br /&gt;
=  =&lt;br /&gt;
&lt;br /&gt;
-----&lt;br /&gt;
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.&lt;br /&gt;
&lt;br /&gt;
[[Category:BREEAM]]&lt;/div&gt;</summary>
		<author><name>Alison Ewins</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/wiki/BREEAM_Construction_waste_management</id>
		<title>BREEAM Construction waste management</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/BREEAM_Construction_waste_management"/>
				<updated>2018-02-23T11:09:41Z</updated>
		
		<summary type="html">&lt;p&gt;Alison Ewins: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Aims and benefits&lt;br /&gt;
&lt;br /&gt;
To promote resource efficiency via the effective management and reduction of construction waste.&lt;br /&gt;
&lt;br /&gt;
When to consider&lt;br /&gt;
&lt;br /&gt;
Pre demolition audit needs to be considered before demolition takes place.&lt;br /&gt;
&lt;br /&gt;
Resource Management Plan (RMP)/ Site Waste Management Plan (SWMP) needs to be considered before work on site starts&lt;br /&gt;
&lt;br /&gt;
Step by step guidance&lt;br /&gt;
&lt;br /&gt;
Pre demolition audit&lt;br /&gt;
&lt;br /&gt;
Pre-demo audit should be produced by the company doing the demolition (could be main contractor or a demolition contractor). Make sure it lists any materials on the existing site, amounts and potential applications.&lt;br /&gt;
&lt;br /&gt;
i.e. Timber doors-20 m3- recycle&lt;br /&gt;
&lt;br /&gt;
OR&lt;br /&gt;
&lt;br /&gt;
Concrete-100m3- crush and re-use on site.&lt;br /&gt;
&lt;br /&gt;
Make sure the pre-demo audit is referenced in the RMP/SWMP&lt;br /&gt;
&lt;br /&gt;
SWMP/RMP&lt;br /&gt;
&lt;br /&gt;
Most contractors will have their own template. Make sure it contains all the information required for BREEAM.&lt;br /&gt;
&lt;br /&gt;
A compliant RMP is one that defines:&lt;br /&gt;
&lt;br /&gt;
# A target benchmark for resource efficiency, i.e. m³ of waste per 100m² or tonnes of waste per 100m²&lt;br /&gt;
# Procedures and commitments for minimising non-hazardous waste in line with the target benchmark&lt;br /&gt;
# Procedures for minimising hazardous waste&lt;br /&gt;
# A waste minimisation target and details of waste minimisation actions to be undertaken&lt;br /&gt;
# Procedures for estimating, monitoring, measuring and reporting hazardous and non-hazardous site waste. If waste data is obtained from licensed external waste contractors, the data needs to be reliable and verifiable, e.g. by using data from EA/SEPA/EA Wales/NIEA Waste Return Forms&lt;br /&gt;
# Procedures for sorting, reusing and recycling construction waste into defined waste groups (see additional guidance section), either on-site or through a licensed external contractor&lt;br /&gt;
# Procedures for reviewing and updating the plan&lt;br /&gt;
# The name or job title of the individual responsible for implementing the above.&lt;br /&gt;
&lt;br /&gt;
When setting targets ask the contractor to look back at previous projects final waste figures to give a sensible estimate for the next project. It’s easy to set a tight target and get credits at design stage, but if the target isn’t met credits may be lost at Post Construction stage.&lt;br /&gt;
&lt;br /&gt;
At PC stage get final waste figures from waste carrier/s and contractor. Calculate total waste per 100 sq m GIFA. This should exclude excavation waste.&lt;br /&gt;
&lt;br /&gt;
Get final figures from waste carrier/s, contractor and demo contractor for diverting waste from landfill.&lt;br /&gt;
&lt;br /&gt;
Report all figures on the BREEAM scoring and reporting tool.&lt;br /&gt;
&lt;br /&gt;
Questions to ask&lt;br /&gt;
&lt;br /&gt;
Is site team aware that RMP is required and must be updated throughout construction?&lt;br /&gt;
&lt;br /&gt;
Is demo contractor aware that pre-demo audit must be carried out before demolition?&lt;br /&gt;
&lt;br /&gt;
Is demo contractor aware that diversion from landfill rates will be needed after demolition has taken place?&lt;br /&gt;
&lt;br /&gt;
Tools and resources&lt;br /&gt;
&lt;br /&gt;
Example pre-demolition audits and SWMP/RMP can be found on the internet by googling them.&lt;br /&gt;
&lt;br /&gt;
Follow guidance from:&lt;br /&gt;
&lt;br /&gt;
* Defra (Department of Environment, Food and Rural Affairs) [https://www.gov.uk/government/policies/waste-and-recycling https://www.gov.uk/government/policies/waste-and-recycling]&lt;br /&gt;
* BRE (Building Research Establishment Ltd) [https://www.bre.co.uk/Waste_and_recycling.html https://www.bre.co.uk/Waste_and_recycling.html]&lt;br /&gt;
* WRAP (Waste and Resources Action Programme) [http://www.wrap.org.uk/ http://www.wrap.org.uk/]&lt;br /&gt;
* Welsh Government. [http://gov.wales/?lang=en http://gov.wales/?lang=en]&lt;br /&gt;
&lt;br /&gt;
Tips and best practice&lt;br /&gt;
&lt;br /&gt;
Most contractors will have other useful documents that may be used to supplement SWMPs where they don’t contain all the information needed. E.g Project Environmental Plan. Reference this and submit as evidence.&lt;br /&gt;
&lt;br /&gt;
Typical evidence&lt;br /&gt;
&lt;br /&gt;
SWMP/RMP&lt;br /&gt;
&lt;br /&gt;
Pre-demolition audit&lt;br /&gt;
&lt;br /&gt;
Final waste figures&lt;br /&gt;
&lt;br /&gt;
KPIs&lt;br /&gt;
&lt;br /&gt;
Waste carrier records&lt;br /&gt;
&lt;br /&gt;
Project Environmental Plan&lt;br /&gt;
&lt;br /&gt;
[[Category:BREEAM]]&lt;/div&gt;</summary>
		<author><name>Alison Ewins</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/wiki/BREEAM_Construction_waste_management</id>
		<title>BREEAM Construction waste management</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/wiki/BREEAM_Construction_waste_management"/>
				<updated>2018-02-23T11:00:03Z</updated>
		
		<summary type="html">&lt;p&gt;Alison Ewins: Created page with &amp;quot;Aims and benefits  To promote resource efficiency via the effective management and reduction of construction waste.  When to consider  Pre demolition audit needs to be considered...&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Aims and benefits&lt;br /&gt;
&lt;br /&gt;
To promote resource efficiency via the effective management and reduction of construction waste.&lt;br /&gt;
&lt;br /&gt;
When to consider&lt;br /&gt;
&lt;br /&gt;
Pre demolition audit needs to be considered before demolition takes place.&lt;br /&gt;
&lt;br /&gt;
Resource Management Plan (RMP)/ Site Waste Management Plan (SWMP) needs to be considered before work on site starts&lt;br /&gt;
&lt;br /&gt;
Step by step guidance&lt;br /&gt;
&lt;br /&gt;
Pre demolition audit&lt;br /&gt;
&lt;br /&gt;
Pre-demo audit should be produced by the company doing the demolition (could be main contractor or a demolition contractor). Make sure it lists any materials on the existing site, amounts and potential applications.&lt;br /&gt;
&lt;br /&gt;
i.e. Timber doors-20 m3- recycle&lt;br /&gt;
&lt;br /&gt;
OR&lt;br /&gt;
&lt;br /&gt;
Concrete-100m3- crush and re-use on site.&lt;br /&gt;
&lt;br /&gt;
Make sure the pre-demo audit is referenced in the RMP/SWMP&lt;br /&gt;
&lt;br /&gt;
SWMP/RMP&lt;br /&gt;
&lt;br /&gt;
Most contractors will have their own template. Make sure it contains all the information required for BREEAM.&lt;br /&gt;
&lt;br /&gt;
A compliant RMP is one that defines:&lt;br /&gt;
&lt;br /&gt;
# A target benchmark for resource efficiency, i.e. m³ of waste per 100m² or tonnes of waste per 100m²&lt;br /&gt;
# Procedures and commitments for minimising non-hazardous waste in line with the target benchmark&lt;br /&gt;
# Procedures for minimising hazardous waste&lt;br /&gt;
# A waste minimisation target and details of waste minimisation actions to be undertaken&lt;br /&gt;
# Procedures for estimating, monitoring, measuring and reporting hazardous and non-hazardous site waste. If waste data is obtained from licensed external waste contractors, the data needs to be reliable and verifiable, e.g. by using data from EA/SEPA/EA Wales/NIEA Waste Return Forms&lt;br /&gt;
# Procedures for sorting, reusing and recycling construction waste into defined waste groups (see additional guidance section), either on-site or through a licensed external contractor&lt;br /&gt;
# Procedures for reviewing and updating the plan&lt;br /&gt;
# The name or job title of the individual responsible for implementing the above.&lt;br /&gt;
&lt;br /&gt;
When setting targets ask the contractor to look back at previous projects final waste figures to give a sensible estimate for the next project. It’s easy to set a tight target and get credits at design stage, but if the target isn’t met credits may be lost at Post Construction stage.&lt;br /&gt;
&lt;br /&gt;
At PC stage get final waste figures from waste carrier/s and contractor. Calculate total waste per 100 sq m GIFA. This should exclude excavation waste.&lt;br /&gt;
&lt;br /&gt;
Get final figures from waste carrier/s, contractor and demo contractor for diverting waste from landfill.&lt;br /&gt;
&lt;br /&gt;
Report all figures on the BREEAM scoring and reporting tool.&lt;br /&gt;
&lt;br /&gt;
Questions to ask&lt;br /&gt;
&lt;br /&gt;
Is site team aware that RMP is required and must be updated throughout construction?&lt;br /&gt;
&lt;br /&gt;
Is demo contractor aware that pre-demo audit must be carried out before demolition?&lt;br /&gt;
&lt;br /&gt;
Is demo contractor aware that diversion from landfill rates will be needed after demolition has taken place?&lt;br /&gt;
&lt;br /&gt;
Tools and resources&lt;br /&gt;
&lt;br /&gt;
Example pre-demolition audits and SWMP/RMP can be found on the internet by googling them.&lt;br /&gt;
&lt;br /&gt;
Follow guidance from:&lt;br /&gt;
&lt;br /&gt;
* Defra (Department of Environment, Food and Rural Affairs) [https://www.gov.uk/government/policies/waste-and-recycling https://www.gov.uk/government/policies/waste-and-recycling]&lt;br /&gt;
* BRE (Building Research Establishment Ltd) [https://www.bre.co.uk/Waste_and_recycling.html https://www.bre.co.uk/Waste_and_recycling.html]&lt;br /&gt;
* WRAP (Waste and Resources Action Programme) [http://www.wrap.org.uk/ http://www.wrap.org.uk/]&lt;br /&gt;
* Welsh Government. [http://gov.wales/?lang=en http://gov.wales/?lang=en]&lt;br /&gt;
&lt;br /&gt;
Tips and best practice&lt;br /&gt;
&lt;br /&gt;
Most contractors will have other useful documents that may be used to supplement SWMPs where they don’t contain all the information needed. E.g Project Environmental Plan. Reference this and submit as evidence.&lt;br /&gt;
&lt;br /&gt;
Typical evidence&lt;br /&gt;
&lt;br /&gt;
SWMP/RMP&lt;br /&gt;
&lt;br /&gt;
Pre-demolition audit&lt;br /&gt;
&lt;br /&gt;
Final waste figures&lt;br /&gt;
&lt;br /&gt;
KPIs&lt;br /&gt;
&lt;br /&gt;
Waste carrier records&lt;br /&gt;
&lt;br /&gt;
Project Environmental Plan&lt;/div&gt;</summary>
		<author><name>Alison Ewins</name></author>	</entry>

	</feed>