<?xml version="1.0"?>
<?xml-stylesheet type="text/css" href="https://www.designingbuildings.co.uk/skins/common/feed.css?301"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
		<id>https://www.designingbuildings.co.uk/w/index.php?action=history&amp;feed=atom&amp;title=Vitiate</id>
		<title>Vitiate - Revision history</title>
		<link rel="self" type="application/atom+xml" href="https://www.designingbuildings.co.uk/w/index.php?action=history&amp;feed=atom&amp;title=Vitiate"/>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Vitiate&amp;action=history"/>
		<updated>2026-06-10T09:26:42Z</updated>
		<subtitle>Revision history for this page on the wiki</subtitle>
		<generator>MediaWiki 1.17.4</generator>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Vitiate&amp;diff=261155&amp;oldid=prev</id>
		<title>Editor: Created page with &quot;To vitiate is the act of impairing or voiding the effect of something else. In terms of buildings and construction this may be an action, failure of an action or a factor that ha...&quot;</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Vitiate&amp;diff=261155&amp;oldid=prev"/>
				<updated>2023-09-08T13:41:45Z</updated>
		
		<summary type="html">&lt;p&gt;Created page with &amp;quot;To vitiate is the act of impairing or voiding the effect of something else. In terms of buildings and construction this may be an action, failure of an action or a factor that ha...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;To vitiate is the act of impairing or voiding the effect of something else. In terms of buildings and construction this may be an action, failure of an action or a factor that has the potential to invalidate a contract or specific element of a contract or agreement tis making it void. For example through fraud, misrepresentation, legal capacity and so on.&lt;br /&gt;
&lt;br /&gt;
For example if an insured person fails to disclose relevant material facts or misrepresents a case to an an insurer before the insurance policy is issued it may vitiate the policy, thus making it invalid. If a landlord does of fails to do something to a property that is likely to make a tenant's insurance policy void, the landlord may be liable for reparation costs.&lt;br /&gt;
&lt;br /&gt;
In the case of a force majeure event, it may be ground for and excuse non-performance in a contract, but only for the duration of the event, it does not necessarily void or vitiate the contract in its entirety.&lt;br /&gt;
&lt;br /&gt;
In a construction project variations to a contract, that are agreed upon, may be requested under the correct procedure, variations do not vitiate a contract. The original contract remains in tact and in place, it merely has been adjusted, a vitiated contract is one that is no longer valid and is thus void.&lt;br /&gt;
&lt;br /&gt;
= Related articles on Designing Buildings =&lt;br /&gt;
&lt;br /&gt;
* Abortive work in building design and construction.&lt;br /&gt;
* Architect's instruction.&lt;br /&gt;
* Change control procedure for building design and construction.&lt;br /&gt;
* Change order for construction contracts.&lt;br /&gt;
* Compensation event.&lt;br /&gt;
* Confirmation of verbal instruction.&lt;br /&gt;
* Contract sum.&lt;br /&gt;
* Extension of time EOT in construction contracts.&lt;br /&gt;
* How to prepare a claim for an extension of time.&lt;br /&gt;
* Loss and expense.&lt;br /&gt;
* Payment for extra work.&lt;br /&gt;
* Prime cost sum.&lt;br /&gt;
* Provisional sum.&lt;br /&gt;
* Relevant event.&lt;br /&gt;
* Relevant matter.&lt;br /&gt;
* Scope of work.&lt;br /&gt;
* Valuation of interim payments.&lt;br /&gt;
* Variations in construction contracts.&lt;br /&gt;
&lt;br /&gt;
[[Category:DCN_Definition]] [[Category:DCN_Project_Knowledge]] [[Category:Definitions]] [[Category:Publications_/_reports]]&lt;/div&gt;</summary>
		<author><name>Editor</name></author>	</entry>

	</feed>