<?xml version="1.0"?>
<?xml-stylesheet type="text/css" href="https://www.designingbuildings.co.uk/skins/common/feed.css?301"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
		<id>https://www.designingbuildings.co.uk/w/index.php?action=history&amp;feed=atom&amp;title=Stratford_Town_Centre_Link</id>
		<title>Stratford Town Centre Link - Revision history</title>
		<link rel="self" type="application/atom+xml" href="https://www.designingbuildings.co.uk/w/index.php?action=history&amp;feed=atom&amp;title=Stratford_Town_Centre_Link"/>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Stratford_Town_Centre_Link&amp;action=history"/>
		<updated>2026-05-14T22:32:28Z</updated>
		<subtitle>Revision history for this page on the wiki</subtitle>
		<generator>MediaWiki 1.17.4</generator>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Stratford_Town_Centre_Link&amp;diff=182513&amp;oldid=prev</id>
		<title>Designing Buildings at 07:08, 18 November 2020</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Stratford_Town_Centre_Link&amp;diff=182513&amp;oldid=prev"/>
				<updated>2020-11-18T07:08:58Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 07:08, 18 November 2020&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 48:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 48:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge sections were prefabricated off site and delivered in transportable sections for assembly by welding adjacent to the bridge’s final position. Custom-designed temporary works were required to maintain the geometric relationship between adjacent units.&amp;lt;br /&amp;gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge sections were prefabricated off site and delivered in transportable sections for assembly by welding adjacent to the bridge’s final position. Custom-designed temporary works were required to maintain the geometric relationship between adjacent units.&amp;lt;br /&amp;gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;&amp;lt;br /&amp;gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt; &lt;/del&gt;A launching nose and tail frame were installed and the first 48m section of the bridge was slid into position using strand jacks to pull the rear of the assembly forward and low-friction skates to support the bottom chords of the trusses. This process was then repeated for the second and third sections of the bridge. The individual launch stages were separated by several weeks to allow for intermediate assembly.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;A launching nose and tail frame were installed and the first 48m section of the bridge was slid into position using strand jacks to pull the rear of the assembly forward and low-friction skates to support the bottom chords of the trusses. This process was then repeated for the second and third sections of the bridge. The individual launch stages were separated by several weeks to allow for intermediate assembly.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:Stratford_Town_Centre_Link_third_launch.png|link=File:Stratford_Town_Centre_Link_third_launch.png]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:Stratford_Town_Centre_Link_third_launch.png|link=File:Stratford_Town_Centre_Link_third_launch.png]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 92:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 93:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;-----&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;-----&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Projects_and_case_studies&lt;/del&gt;]] [[Category:DCN_Project_Knowledge]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;DCN_Commentary&lt;/ins&gt;]] [[Category:DCN_Project_Knowledge&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;]] [[Category:Projects_and_case_studies&lt;/ins&gt;]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Stratford_Town_Centre_Link&amp;diff=51265&amp;oldid=prev</id>
		<title>83.12.106.41 at 20:37, 13 May 2016</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Stratford_Town_Centre_Link&amp;diff=51265&amp;oldid=prev"/>
				<updated>2016-05-13T20:37:54Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 20:37, 13 May 2016&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Description =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Description =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The Stratford Town Centre Link is a landmark structure forming the gateway to the Stratford City development in East London. Conceived as an “urban piazza”, its location makes it an important link for the local community as well as a significant route into the Olympic Park for the 2012 Games. It was completed on 12th September 2011.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The Stratford Town Centre Link is a landmark structure forming the gateway to the Stratford City development in East London. Conceived as an “urban piazza”, its location makes it an important link for the local community as well as a significant route into the Olympic Park for the 2012 Games. It was completed on 12th September 2011.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Stratford Town Centre Link&lt;/del&gt;.png|&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;715x513px|alt&lt;/del&gt;=&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Stratford Town Centre Link&lt;/del&gt;.png]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Stratford_Town_Centre_Link&lt;/ins&gt;.png|&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;link&lt;/ins&gt;=&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;File:Stratford_Town_Centre_Link&lt;/ins&gt;.png]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge crosses eleven railway lines including Network Rail and London Underground assets as well as the platforms of Stratford Regional Station and a highway. Its high-profile location demanded utmost attention to safety, quality and inventiveness in delivery.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge crosses eleven railway lines including Network Rail and London Underground assets as well as the platforms of Stratford Regional Station and a highway. Its high-profile location demanded utmost attention to safety, quality and inventiveness in delivery.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The project is notable for a number of reasons:&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The project is notable for a number of reasons:&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*A striking and unique design combining the use of low-maintenance, weathering steel and glazing.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Exceptional standards of construction.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* A striking and unique design combining the use of low-maintenance, weathering steel and glazing.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*The ingenious method of installation which culminated in the first known live bridge launch over an operational station in the UK.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Exceptional standards of construction.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* The ingenious method of installation which culminated in the first known live bridge launch over an operational station in the UK.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Design Concept =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Design Concept =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 21:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 21:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge is subtlety curved in plan. The trusses vary gradually in height from 4.5m at the ends to 6.5m at the centre pier and the outermost truss develops a deliberate lean of up to 15 degrees. These geometric devices achieve an even greater sense of space and transparency. The constantly changing geometry combines with the plan curve to give the crossing a dynamism and drama that is reinforced by the cladding system.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge is subtlety curved in plan. The trusses vary gradually in height from 4.5m at the ends to 6.5m at the centre pier and the outermost truss develops a deliberate lean of up to 15 degrees. These geometric devices achieve an even greater sense of space and transparency. The constantly changing geometry combines with the plan curve to give the crossing a dynamism and drama that is reinforced by the cladding system.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Stratford Town Centre Link variation of truss&lt;/del&gt;.png|&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;1218x865px|alt&lt;/del&gt;=&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Stratford Town Centre Link variation of truss&lt;/del&gt;.png]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Stratford_Town_Centre_Link_variation_of_truss&lt;/ins&gt;.png|&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;link&lt;/ins&gt;=&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;File:Stratford_Town_Centre_Link_variation_of_truss&lt;/ins&gt;.png]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The lean of the outer truss has structural as well as aesthetic benefits as the top boom of the truss, which is in tension over much of its length, becomes straighter and therefore more efficient. The outer profile of the vertical and horizontal members is shaped to create sharp edges and chamfered planes which are defined by light and shadow to accentuate the form and reduce the visual mass in elevation.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The lean of the outer truss has structural as well as aesthetic benefits as the top boom of the truss, which is in tension over much of its length, becomes straighter and therefore more efficient. The outer profile of the vertical and horizontal members is shaped to create sharp edges and chamfered planes which are defined by light and shadow to accentuate the form and reduce the visual mass in elevation.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 39:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 39:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Care was taken in the bridge detailing in order to produce a design whose aesthetic qualities are intrinsic to the structure. The use of weathering steel offers great potential benefits in terms of durability, however it requires skilful detailing. The design team conducted its own tests on the weathering process and visited precedents. Best practice in relation to the use of this material was researched prior to detailed design and as a result the truss chords were developed with in-built drip details and chamfer plates to prevent pigeon roosting.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Care was taken in the bridge detailing in order to produce a design whose aesthetic qualities are intrinsic to the structure. The use of weathering steel offers great potential benefits in terms of durability, however it requires skilful detailing. The design team conducted its own tests on the weathering process and visited precedents. Best practice in relation to the use of this material was researched prior to detailed design and as a result the truss chords were developed with in-built drip details and chamfer plates to prevent pigeon roosting.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Stratford Town Centre Link waethering of steel&lt;/del&gt;.png|&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;640x108px|alt&lt;/del&gt;=&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Stratford Town Centre Link waethering of steel&lt;/del&gt;.png]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Stratford_Town_Centre_Link_waethering_of_steel&lt;/ins&gt;.png|&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;link&lt;/ins&gt;=&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;File:Stratford_Town_Centre_Link_waethering_of_steel&lt;/ins&gt;.png]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;It was recognised that a high standard of workmanship and dimensional control was essential to the successful delivery of the project. For this reason, intensive workshops were held within the design and construction team to carefully plan the execution of the fabrication and erection of the bridge and its finishes. For example, it was vital that the launch surface of the underside of the trusses was perfectly flat to ensure a smooth installation. In the event, remarkable standards were achieved which are a tribute to the expertise and ingenuity of the individuals involved.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;It was recognised that a high standard of workmanship and dimensional control was essential to the successful delivery of the project. For this reason, intensive workshops were held within the design and construction team to carefully plan the execution of the fabrication and erection of the bridge and its finishes. For example, it was vital that the launch surface of the underside of the trusses was perfectly flat to ensure a smooth installation. In the event, remarkable standards were achieved which are a tribute to the expertise and ingenuity of the individuals involved.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 47:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 47:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Adherence to programme for the bridge construction was critical to the adjacent retail development due to need to occupy part of the site for assembly. The design of the bridge was also significantly affected by the chosen method of installation and the engineer was therefore novated to the contractor for the detailed design.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Adherence to programme for the bridge construction was critical to the adjacent retail development due to need to occupy part of the site for assembly. The design of the bridge was also significantly affected by the chosen method of installation and the engineer was therefore novated to the contractor for the detailed design.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge sections were prefabricated off site and delivered in transportable sections for assembly by welding adjacent to the bridge’s final position. Custom-designed temporary works were required to maintain the geometric relationship between adjacent units.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;A launching nose and tail frame were installed and the first 48m section of the bridge was slid into position using strand jacks to pull the rear of the assembly forward and low-friction skates to support the bottom chords of the trusses. This process was then repeated for the second and third sections of the bridge. The individual launch stages were separated by several weeks to allow for intermediate assembly.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge sections were prefabricated off site and delivered in transportable sections for assembly by welding adjacent to the bridge’s final position. Custom-designed temporary works were required to maintain the geometric relationship between adjacent units.&amp;lt;br /&amp;gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;lt;br /&amp;gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt; &lt;/ins&gt;A launching nose and tail frame were installed and the first 48m section of the bridge was slid into position using strand jacks to pull the rear of the assembly forward and low-friction skates to support the bottom chords of the trusses. This process was then repeated for the second and third sections of the bridge. The individual launch stages were separated by several weeks to allow for intermediate assembly.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Stratford Town Centre Link third launch&lt;/del&gt;.png|&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;1266x843px|alt&lt;/del&gt;=&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Stratford Town Centre Link third launch&lt;/del&gt;.png]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Stratford_Town_Centre_Link_third_launch&lt;/ins&gt;.png|&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;link&lt;/ins&gt;=&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;File:Stratford_Town_Centre_Link_third_launch&lt;/ins&gt;.png]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;By the third bridge launch, the railway authorities had developed sufficient confidence in the project team’s competency and the careful planning of the operation to permit work to be carried out without a railway possession or station closure, thus avoiding disruption and inconvenience to passengers. This is understood to be a first.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;By the third bridge launch, the railway authorities had developed sufficient confidence in the project team’s competency and the careful planning of the operation to permit work to be carried out without a railway possession or station closure, thus avoiding disruption and inconvenience to passengers. This is understood to be a first.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 59:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 61:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Permanent formwork soffit panels and temporary side screens were deployed to provide a secure working environment. Showing considerable foresight, the client commissioned a computer animation to clearly communicate the complex sequencing to the approval authorities and operatives.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Permanent formwork soffit panels and temporary side screens were deployed to provide a secure working environment. Showing considerable foresight, the client commissioned a computer animation to clearly communicate the complex sequencing to the approval authorities and operatives.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Stratford Town Centre Link computer animation&lt;/del&gt;.png|&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;990x591px|alt&lt;/del&gt;=&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Stratford Town Centre Link computer animation&lt;/del&gt;.png]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Stratford_Town_Centre_Link_computer_animation&lt;/ins&gt;.png|&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;link&lt;/ins&gt;=&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;File:Stratford_Town_Centre_Link_computer_animation&lt;/ins&gt;.png]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Safety of the bridge in service has also been an important issue:&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Safety of the bridge in service has also been an important issue:&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Maintenance risks have been significantly reduced by employing weathering steel for the main structure, which requires minimal long-term maintenance.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*The high sides of the structure protect the railway from falling or thrown objects.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Maintenance risks have been significantly reduced by employing weathering steel for the main structure, which requires minimal long-term maintenance.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Special glazing tests, involving dropping a steel sphere from a height of 15m, were undertaken to prove the integrity of the laminated glass to the approval authorities.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* The high sides of the structure protect the railway from falling or thrown objects.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*The bridge lighting, which is simple yet striking, is effective in providing a well lit and non-threatening environment for users at night.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Special glazing tests, involving dropping a steel sphere from a height of 15m, were undertaken to prove the integrity of the laminated glass to the approval authorities.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* The bridge lighting, which is simple yet striking, is effective in providing a well lit and non-threatening environment for users at night.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Sustainability =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Sustainability =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 76:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 79:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Project team =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Project team =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;*Client: Westfield Shoppingtowns Ltd&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;*Bridge Engineer: Buro Happold Ltd&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;*Architect: Knight Architects&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;*Main Contractor: Morgan Est PLC&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;*Steel Fabricator: Watson Steel&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;*Specialist Launch Contractor: ALE&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;*Glazing Subcontractor: AGF&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;----&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;This article was created by --[[User%3ABuro%20Happold|&lt;/del&gt;Buro Happold&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;]].&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;* Client: Westfield Shoppingtowns Ltd&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;* Bridge Engineer: &lt;/ins&gt;Buro Happold &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Ltd&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;* Architect: Knight Architects&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;* Main Contractor: Morgan Est PLC&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;* Steel Fabricator: Watson Steel&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;* Specialist Launch Contractor: ALE&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;* Glazing Subcontractor: AGF&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;----&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;----&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;-&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;This article was created by --[[User:Buro_Happold|Buro Happold]].&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Projects_and_case_studies]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;-----&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Projects_and_case_studies&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;]] [[Category:DCN_Project_Knowledge&lt;/ins&gt;]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>[IP address hidden]</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Stratford_Town_Centre_Link&amp;diff=20567&amp;oldid=prev</id>
		<title>Designing Buildings at 06:37, 28 May 2014</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Stratford_Town_Centre_Link&amp;diff=20567&amp;oldid=prev"/>
				<updated>2014-05-28T06:37:26Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 06:37, 28 May 2014&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;&amp;lt;div&amp;gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Description =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Description =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The Stratford Town Centre Link is a landmark structure forming the gateway to the Stratford City development in East London. Conceived as an “urban piazza”, its location makes it an important link for the local community as well as a significant route into the Olympic Park for the 2012 Games. It was completed on 12th September 2011.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The Stratford Town Centre Link is a landmark structure forming the gateway to the Stratford City development in East London. Conceived as an “urban piazza”, its location makes it an important link for the local community as well as a significant route into the Olympic Park for the 2012 Games. It was completed on 12th September 2011.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:Stratford Town Centre Link.png|715x513px]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:Stratford Town Centre Link.png|715x513px&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;|alt=Stratford Town Centre Link.png&lt;/ins&gt;]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;&amp;lt;/div&amp;gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge crosses eleven railway lines including Network Rail and London Underground assets as well as the platforms of Stratford Regional Station and a highway. Its high-profile location demanded utmost attention to safety, quality and inventiveness in delivery.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge crosses eleven railway lines including Network Rail and London Underground assets as well as the platforms of Stratford Regional Station and a highway. Its high-profile location demanded utmost attention to safety, quality and inventiveness in delivery.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 21:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 21:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge is subtlety curved in plan. The trusses vary gradually in height from 4.5m at the ends to 6.5m at the centre pier and the outermost truss develops a deliberate lean of up to 15 degrees. These geometric devices achieve an even greater sense of space and transparency. The constantly changing geometry combines with the plan curve to give the crossing a dynamism and drama that is reinforced by the cladding system.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge is subtlety curved in plan. The trusses vary gradually in height from 4.5m at the ends to 6.5m at the centre pier and the outermost truss develops a deliberate lean of up to 15 degrees. These geometric devices achieve an even greater sense of space and transparency. The constantly changing geometry combines with the plan curve to give the crossing a dynamism and drama that is reinforced by the cladding system.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:Stratford Town Centre Link variation of truss.png|1218x865px]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:Stratford Town Centre Link variation of truss.png|1218x865px&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;|alt=Stratford Town Centre Link variation of truss.png&lt;/ins&gt;]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The lean of the outer truss has structural as well as aesthetic benefits as the top boom of the truss, which is in tension over much of its length, becomes straighter and therefore more efficient. The outer profile of the vertical and horizontal members is shaped to create sharp edges and chamfered planes which are defined by light and shadow to accentuate the form and reduce the visual mass in elevation.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The lean of the outer truss has structural as well as aesthetic benefits as the top boom of the truss, which is in tension over much of its length, becomes straighter and therefore more efficient. The outer profile of the vertical and horizontal members is shaped to create sharp edges and chamfered planes which are defined by light and shadow to accentuate the form and reduce the visual mass in elevation.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 39:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 39:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Care was taken in the bridge detailing in order to produce a design whose aesthetic qualities are intrinsic to the structure. The use of weathering steel offers great potential benefits in terms of durability, however it requires skilful detailing. The design team conducted its own tests on the weathering process and visited precedents. Best practice in relation to the use of this material was researched prior to detailed design and as a result the truss chords were developed with in-built drip details and chamfer plates to prevent pigeon roosting.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Care was taken in the bridge detailing in order to produce a design whose aesthetic qualities are intrinsic to the structure. The use of weathering steel offers great potential benefits in terms of durability, however it requires skilful detailing. The design team conducted its own tests on the weathering process and visited precedents. Best practice in relation to the use of this material was researched prior to detailed design and as a result the truss chords were developed with in-built drip details and chamfer plates to prevent pigeon roosting.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:Stratford Town Centre Link waethering of steel.png|640x108px]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:Stratford Town Centre Link waethering of steel.png|640x108px&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;|alt=Stratford Town Centre Link waethering of steel.png&lt;/ins&gt;]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;It was recognised that a high standard of workmanship and dimensional control was essential to the successful delivery of the project. For this reason, intensive workshops were held within the design and construction team to carefully plan the execution of the fabrication and erection of the bridge and its finishes. For example, it was vital that the launch surface of the underside of the trusses was perfectly flat to ensure a smooth installation. In the event, remarkable standards were achieved which are a tribute to the expertise and ingenuity of the individuals involved.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;It was recognised that a high standard of workmanship and dimensional control was essential to the successful delivery of the project. For this reason, intensive workshops were held within the design and construction team to carefully plan the execution of the fabrication and erection of the bridge and its finishes. For example, it was vital that the launch surface of the underside of the trusses was perfectly flat to ensure a smooth installation. In the event, remarkable standards were achieved which are a tribute to the expertise and ingenuity of the individuals involved.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 49:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 49:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge sections were prefabricated off site and delivered in transportable sections for assembly by welding adjacent to the bridge’s final position. Custom-designed temporary works were required to maintain the geometric relationship between adjacent units.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;A launching nose and tail frame were installed and the first 48m section of the bridge was slid into position using strand jacks to pull the rear of the assembly forward and low-friction skates to support the bottom chords of the trusses. This process was then repeated for the second and third sections of the bridge. The individual launch stages were separated by several weeks to allow for intermediate assembly.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge sections were prefabricated off site and delivered in transportable sections for assembly by welding adjacent to the bridge’s final position. Custom-designed temporary works were required to maintain the geometric relationship between adjacent units.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;A launching nose and tail frame were installed and the first 48m section of the bridge was slid into position using strand jacks to pull the rear of the assembly forward and low-friction skates to support the bottom chords of the trusses. This process was then repeated for the second and third sections of the bridge. The individual launch stages were separated by several weeks to allow for intermediate assembly.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:Stratford Town Centre Link third launch.png|1266x843px]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:Stratford Town Centre Link third launch.png|1266x843px&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;|alt=Stratford Town Centre Link third launch.png&lt;/ins&gt;]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;By the third bridge launch, the railway authorities had developed sufficient confidence in the project team’s competency and the careful planning of the operation to permit work to be carried out without a railway possession or station closure, thus avoiding disruption and inconvenience to passengers. This is understood to be a first.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;By the third bridge launch, the railway authorities had developed sufficient confidence in the project team’s competency and the careful planning of the operation to permit work to be carried out without a railway possession or station closure, thus avoiding disruption and inconvenience to passengers. This is understood to be a first.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 59:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 59:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Permanent formwork soffit panels and temporary side screens were deployed to provide a secure working environment. Showing considerable foresight, the client commissioned a computer animation to clearly communicate the complex sequencing to the approval authorities and operatives.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Permanent formwork soffit panels and temporary side screens were deployed to provide a secure working environment. Showing considerable foresight, the client commissioned a computer animation to clearly communicate the complex sequencing to the approval authorities and operatives.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:Stratford Town Centre Link computer animation.png|990x591px]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[File:Stratford Town Centre Link computer animation.png|990x591px&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;|alt=Stratford Town Centre Link computer animation.png&lt;/ins&gt;]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Safety of the bridge in service has also been an important issue:&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Safety of the bridge in service has also been an important issue:&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 86:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 86:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;----&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;----&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;[[File:Buro-happold-logo.jpg|141x180px|link=User:Buro_Happold]]&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;This article was created by &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;--&lt;/ins&gt;[[User&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;%3ABuro%20Happold&lt;/ins&gt;|Buro Happold]].&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;This article was created by [[User&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;:Buro_Happold&lt;/del&gt;|Buro Happold]]. &amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;----&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;----&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Projects_and_case_studies]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Projects_and_case_studies]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Stratford_Town_Centre_Link&amp;diff=12537&amp;oldid=prev</id>
		<title>Designing Buildings at 07:22, 2 August 2013</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Stratford_Town_Centre_Link&amp;diff=12537&amp;oldid=prev"/>
				<updated>2013-08-02T07:22:21Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 07:22, 2 August 2013&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 3:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 3:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The Stratford Town Centre Link is a landmark structure forming the gateway to the Stratford City development in East London. Conceived as an “urban piazza”, its location makes it an important link for the local community as well as a significant route into the Olympic Park for the 2012 Games. It was completed on 12th September 2011.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The Stratford Town Centre Link is a landmark structure forming the gateway to the Stratford City development in East London. Conceived as an “urban piazza”, its location makes it an important link for the local community as well as a significant route into the Olympic Park for the 2012 Games. It was completed on 12th September 2011.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;[[File:Stratford Town Centre Link.png|715x513px]]&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;lt;/div&amp;gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;lt;/div&amp;gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge crosses eleven railway lines including Network Rail and London Underground assets as well as the platforms of Stratford Regional Station and a highway. Its high-profile location demanded utmost attention to safety, quality and inventiveness in delivery.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge crosses eleven railway lines including Network Rail and London Underground assets as well as the platforms of Stratford Regional Station and a highway. Its high-profile location demanded utmost attention to safety, quality and inventiveness in delivery.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 18:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 20:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge is subtlety curved in plan. The trusses vary gradually in height from 4.5m at the ends to 6.5m at the centre pier and the outermost truss develops a deliberate lean of up to 15 degrees. These geometric devices achieve an even greater sense of space and transparency. The constantly changing geometry combines with the plan curve to give the crossing a dynamism and drama that is reinforced by the cladding system.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge is subtlety curved in plan. The trusses vary gradually in height from 4.5m at the ends to 6.5m at the centre pier and the outermost truss develops a deliberate lean of up to 15 degrees. These geometric devices achieve an even greater sense of space and transparency. The constantly changing geometry combines with the plan curve to give the crossing a dynamism and drama that is reinforced by the cladding system.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;[[File:Stratford Town Centre Link variation of truss.png|1218x865px]]&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The lean of the outer truss has structural as well as aesthetic benefits as the top boom of the truss, which is in tension over much of its length, becomes straighter and therefore more efficient. The outer profile of the vertical and horizontal members is shaped to create sharp edges and chamfered planes which are defined by light and shadow to accentuate the form and reduce the visual mass in elevation.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The lean of the outer truss has structural as well as aesthetic benefits as the top boom of the truss, which is in tension over much of its length, becomes straighter and therefore more efficient. The outer profile of the vertical and horizontal members is shaped to create sharp edges and chamfered planes which are defined by light and shadow to accentuate the form and reduce the visual mass in elevation.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 34:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 38:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Care was taken in the bridge detailing in order to produce a design whose aesthetic qualities are intrinsic to the structure. The use of weathering steel offers great potential benefits in terms of durability, however it requires skilful detailing. The design team conducted its own tests on the weathering process and visited precedents. Best practice in relation to the use of this material was researched prior to detailed design and as a result the truss chords were developed with in-built drip details and chamfer plates to prevent pigeon roosting.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Care was taken in the bridge detailing in order to produce a design whose aesthetic qualities are intrinsic to the structure. The use of weathering steel offers great potential benefits in terms of durability, however it requires skilful detailing. The design team conducted its own tests on the weathering process and visited precedents. Best practice in relation to the use of this material was researched prior to detailed design and as a result the truss chords were developed with in-built drip details and chamfer plates to prevent pigeon roosting.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;[[File:Stratford Town Centre Link waethering of steel.png|640x108px]]&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;It was recognised that a high standard of workmanship and dimensional control was essential to the successful delivery of the project. For this reason, intensive workshops were held within the design and construction team to carefully plan the execution of the fabrication and erection of the bridge and its finishes. For example, it was vital that the launch surface of the underside of the trusses was perfectly flat to ensure a smooth installation. In the event, remarkable standards were achieved which are a tribute to the expertise and ingenuity of the individuals involved.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;It was recognised that a high standard of workmanship and dimensional control was essential to the successful delivery of the project. For this reason, intensive workshops were held within the design and construction team to carefully plan the execution of the fabrication and erection of the bridge and its finishes. For example, it was vital that the launch surface of the underside of the trusses was perfectly flat to ensure a smooth installation. In the event, remarkable standards were achieved which are a tribute to the expertise and ingenuity of the individuals involved.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 42:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 48:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge sections were prefabricated off site and delivered in transportable sections for assembly by welding adjacent to the bridge’s final position. Custom-designed temporary works were required to maintain the geometric relationship between adjacent units.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;A launching nose and tail frame were installed and the first 48m section of the bridge was slid into position using strand jacks to pull the rear of the assembly forward and low-friction skates to support the bottom chords of the trusses. This process was then repeated for the second and third sections of the bridge. The individual launch stages were separated by several weeks to allow for intermediate assembly.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge sections were prefabricated off site and delivered in transportable sections for assembly by welding adjacent to the bridge’s final position. Custom-designed temporary works were required to maintain the geometric relationship between adjacent units.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;A launching nose and tail frame were installed and the first 48m section of the bridge was slid into position using strand jacks to pull the rear of the assembly forward and low-friction skates to support the bottom chords of the trusses. This process was then repeated for the second and third sections of the bridge. The individual launch stages were separated by several weeks to allow for intermediate assembly.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;[[File:Stratford Town Centre Link third launch.png|1266x843px]]&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;By the third bridge launch, the railway authorities had developed sufficient confidence in the project team’s competency and the careful planning of the operation to permit work to be carried out without a railway possession or station closure, thus avoiding disruption and inconvenience to passengers. This is understood to be a first.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;By the third bridge launch, the railway authorities had developed sufficient confidence in the project team’s competency and the careful planning of the operation to permit work to be carried out without a railway possession or station closure, thus avoiding disruption and inconvenience to passengers. This is understood to be a first.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 50:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 58:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Permanent formwork soffit panels and temporary side screens were deployed to provide a secure working environment. Showing considerable foresight, the client commissioned a computer animation to clearly communicate the complex sequencing to the approval authorities and operatives.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Permanent formwork soffit panels and temporary side screens were deployed to provide a secure working environment. Showing considerable foresight, the client commissioned a computer animation to clearly communicate the complex sequencing to the approval authorities and operatives.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;[[File:Stratford Town Centre Link computer animation.png|990x591px]]&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Safety of the bridge in service has also been an important issue:&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Safety of the bridge in service has also been an important issue:&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Maintenance risks have been significantly reduced by employing weathering steel for the main structure, which requires minimal long-term maintenance. &amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Maintenance risks have been significantly reduced by employing weathering steel for the main structure, which requires minimal long-term maintenance.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*The high sides of the structure protect the railway from falling or thrown objects. &amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*The high sides of the structure protect the railway from falling or thrown objects.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Special glazing tests, involving dropping a steel sphere from a height of 15m, were undertaken to prove the integrity of the laminated glass to the approval authorities. &amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Special glazing tests, involving dropping a steel sphere from a height of 15m, were undertaken to prove the integrity of the laminated glass to the approval authorities.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*The bridge lighting, which is simple yet striking, is effective in providing a well lit and non-threatening environment for users at night.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*The bridge lighting, which is simple yet striking, is effective in providing a well lit and non-threatening environment for users at night.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 73:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 83:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Specialist Launch Contractor: ALE&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Specialist Launch Contractor: ALE&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Glazing Subcontractor: AGF&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Glazing Subcontractor: AGF&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;----&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;[[File:Buro-happold-logo.jpg|141x180px|link=User:Buro_Happold]]&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;This article was created by [[User:Buro_Happold|Buro Happold]]. &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;----&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Projects_and_case_studies]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Projects_and_case_studies]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Stratford_Town_Centre_Link&amp;diff=12531&amp;oldid=prev</id>
		<title>Designing Buildings at 07:09, 2 August 2013</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Stratford_Town_Centre_Link&amp;diff=12531&amp;oldid=prev"/>
				<updated>2013-08-02T07:09:17Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 07:09, 2 August 2013&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 39:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 39:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Construction =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Construction =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Adherence to programme for the bridge construction was critical to the adjacent retail development due to need to occupy part of the site for assembly. The design of the bridge was also significantly affected by the chosen method of installation and the engineer was therefore novated to the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;contract &lt;/del&gt;for the detailed design.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Adherence to programme for the bridge construction was critical to the adjacent retail development due to need to occupy part of the site for assembly. The design of the bridge was also significantly affected by the chosen method of installation and the engineer was therefore novated to the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;contractor &lt;/ins&gt;for the detailed design.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge sections were prefabricated off site and delivered in transportable sections for assembly by welding adjacent to the bridge’s final position. Custom-designed temporary works were required to maintain the geometric relationship between adjacent units.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;A launching nose and tail frame were installed and the first 48m section of the bridge was slid into position using strand jacks to pull the rear of the assembly forward and low friction skates to support the bottom chords of the trusses. This process was then repeated for the second and third sections of the bridge &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;– the &lt;/del&gt;individual launch stages &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;being &lt;/del&gt;separated by several weeks to allow for &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;the &lt;/del&gt;intermediate assembly&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge sections were prefabricated off site and delivered in transportable sections for assembly by welding adjacent to the bridge’s final position. Custom-designed temporary works were required to maintain the geometric relationship between adjacent units.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;A launching nose and tail frame were installed and the first 48m section of the bridge was slid into position using strand jacks to pull the rear of the assembly forward and low&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;-&lt;/ins&gt;friction skates to support the bottom chords of the trusses. This process was then repeated for the second and third sections of the bridge&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;. The &lt;/ins&gt;individual launch stages &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;were &lt;/ins&gt;separated by several weeks to allow for intermediate assembly&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;By the third bridge launch, the railway authorities had developed sufficient confidence in the project team’s competency and the careful planning of the operation to permit work to be carried out without a railway possession or station closure, thus avoiding disruption and inconvenience to passengers &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;– this &lt;/del&gt;is understood to be a first.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;By the third bridge launch, the railway authorities had developed sufficient confidence in the project team’s competency and the careful planning of the operation to permit work to be carried out without a railway possession or station closure, thus avoiding disruption and inconvenience to passengers&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;. This &lt;/ins&gt;is understood to be a first.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Safety =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Safety =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 49:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 49:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge’s location above a busy railway and station meant that health and safety considerations were paramount. Its design was profoundly influenced by the need to ensure the safety and practicality of the method of construction.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge’s location above a busy railway and station meant that health and safety considerations were paramount. Its design was profoundly influenced by the need to ensure the safety and practicality of the method of construction.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;A three stage incremental launch process was necessary due to the limited working area available for assembly adjacent to the bridge site. &lt;/del&gt;Permanent formwork soffit panels and temporary side screens were deployed to provide a secure working environment. Showing considerable foresight, the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Client &lt;/del&gt;commissioned a computer animation to clearly communicate the complex sequencing to the approval authorities and operatives.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Permanent formwork soffit panels and temporary side screens were deployed to provide a secure working environment. Showing considerable foresight, the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;client &lt;/ins&gt;commissioned a computer animation to clearly communicate the complex sequencing to the approval authorities and operatives.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Safety of the bridge in service has also been an important issue&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;. &lt;/del&gt;Maintenance risks have been significantly reduced by employing weathering steel for the main structure, which &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;therefore &lt;/del&gt;requires minimal long term maintenance. The high sides &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;to &lt;/del&gt;the structure protect the railway from falling or thrown objects. Special glazing tests, involving &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;the &lt;/del&gt;dropping &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;of &lt;/del&gt;a steel sphere from a height of 15m, were &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;carried out &lt;/del&gt;to prove the integrity of the laminated glass to the approval authorities. The bridge lighting, which is simple yet striking, is effective in providing a well lit and non-threatening environment for users at night.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Safety of the bridge in service has also been an important issue&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;:&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;*&lt;/ins&gt;Maintenance risks have been significantly reduced by employing weathering steel for the main structure, which requires minimal long&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;-&lt;/ins&gt;term maintenance. &amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;*&lt;/ins&gt;The high sides &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;of &lt;/ins&gt;the structure protect the railway from falling or thrown objects. &amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;*&lt;/ins&gt;Special glazing tests, involving dropping a steel sphere from a height of 15m, were &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;undertaken &lt;/ins&gt;to prove the integrity of the laminated glass to the approval authorities. &amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;*&lt;/ins&gt;The bridge lighting, which is simple yet striking, is effective in providing a well lit and non-threatening environment for users at night.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Sustainability =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Sustainability =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge materials were selected &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;in order &lt;/del&gt;to maximise durability and minimise maintenance &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;of the bridge&lt;/del&gt;, which is an important consideration given its location above a busy railway. Consequently life cycle costs &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;are &lt;/del&gt;minimised. The bridge design was also driven by the desire to minimise construction time and impact. The bridge brings significant local benefits in terms of connectivity.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge materials were selected to maximise durability and minimise maintenance, which is an important consideration given its location above a busy railway. Consequently life&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;-&lt;/ins&gt;cycle costs &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;have been &lt;/ins&gt;minimised. The bridge design was also driven by the desire to minimise construction time and impact. The bridge brings significant local benefits in terms of connectivity.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Performance against prediction =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Performance against prediction =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The project has required close &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;cooperation &lt;/del&gt;between the client, designers, main contractor and steel fabricator to deliver a complex structure within a tight timescale. It is a tribute to the team members that the project was completed on time and within budget.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The project has required close &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;co-operation &lt;/ins&gt;between the client, designers, main contractor and steel fabricator to deliver a complex structure within a tight timescale. It is a tribute to the team members that the project was completed on time and within budget.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Project team =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Project team =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Stratford_Town_Centre_Link&amp;diff=12529&amp;oldid=prev</id>
		<title>Designing Buildings at 07:01, 2 August 2013</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Stratford_Town_Centre_Link&amp;diff=12529&amp;oldid=prev"/>
				<updated>2013-08-02T07:01:37Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 07:01, 2 August 2013&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;lt;div&amp;gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;lt;div&amp;gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Description =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Description =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;br/&amp;gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;The Stratford Town Centre Link is a landmark structure forming the gateway to the Stratford City development in East London. Conceived as an “urban piazza”, its location makes it an important link for the local community as well as a significant route into the Olympic Park for the 2012 Games. It was completed on 12th September 2011.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;lt;/div&amp;gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;lt;/div&amp;gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;&amp;lt;br/&amp;gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;The bridge crosses eleven railway lines including Network Rail and London Underground assets as well as the platforms of Stratford Regional Station and a highway. Its high-profile location demanded utmost attention to safety, quality and inventiveness in delivery.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Stratford Town Centre Link is a landmark structure forming the gateway to the Stratford City development in East London. Conceived as an “urban piazza”, its location makes it an important link for the local community as well as a significant route into the Olympic Park for the 2012 Games. It was completed on 12th September 2011.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The project is notable for a number of reasons:&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*A striking and unique design combining the use of low-maintenance&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;, &lt;/ins&gt;weathering steel and glazing&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;The bridge crosses eleven railway lines including Network Rail and London Underground assets as well as the platforms of Stratford Regional Station and a highway. Its high profile location demanded utmost attention to safety, quality and inventiveness in delivery.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Exceptional standards of construction&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;This &lt;/del&gt;project is notable for a number of reasons:&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*A striking and unique design combining the use of low-maintenance weathering steel and glazing&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Exceptional standards of construction&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;, and&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*The ingenious method of installation which culminated in the first known live bridge launch over an operational station in the UK.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*The ingenious method of installation which culminated in the first known live bridge launch over an operational station in the UK.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Design Concept =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Design Concept =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The development of the bridge concept was a close collaboration between the client, architect and engineer. The engineering constraints included geometric clearances, limited positions for supports and the need to design for minimal long term maintenance. Architecturally the bridge needed a strong presence whilst providing an open yet secure environment above the railway. From a construction point of view, disruption to the railway needed to be minimised&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The development of the bridge concept was a close collaboration between the client, architect and engineer. The engineering constraints included geometric clearances, limited positions for supports and the need to design for minimal long&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;-&lt;/ins&gt;term maintenance. Architecturally the bridge needed a strong presence whilst providing an open yet secure environment above the railway. From a construction point of view, disruption to the railway needed to be minimised.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;The selected design comprises a ladder beam arrangement with steel side trusses fabricated entirely from weathering steel, forming two equal spans of 65m. The bridge width, dictated by crowd flows of up to 80,000 people per hour during the Games, is 12m. A full height glazed façade is provided along each side and this open structure without diagonals provides suitable edge protection against falling objects without detriment to the experience of the user. A Vierendeel truss form was selected because it is more easily integrated with a glazed cladding system, avoids the visual interference of diagonals and complements the rectilinear language of the neighbouring buildings&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;bridge is curved subtlety in plan, the &lt;/del&gt;trusses &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;vary gradually in height &lt;/del&gt;from &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;4&lt;/del&gt;.&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;5m at the ends to 6.5m at the centre pier and the outermost truss develops a deliberate lean &lt;/del&gt;of up to &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;15 degrees&lt;/del&gt;. &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;These clever geometric devices achieve an even greater sense of space &lt;/del&gt;and &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;transparency. The constantly changing geometry combines with the plan curve &lt;/del&gt;to &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;give &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;crossing a dynamism and drama that is reinforced by &lt;/del&gt;the cladding system.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;design comprises a ladder beam arrangement with steel side &lt;/ins&gt;trusses &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;fabricated entirely &lt;/ins&gt;from &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;weathering steel forming two equal spans of 65m&lt;/ins&gt;. &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;The bridge width, dictated by crowd flows &lt;/ins&gt;of up to &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;80,000 people per hour during the Games, is 12m&lt;/ins&gt;. &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;A full-height glazed façade is provided along each side &lt;/ins&gt;and &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;this open structure without diagonals provides suitable edge protection against falling objects without detriment &lt;/ins&gt;to the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;experience of &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;user. A Vierendeel truss form was selected because it is more easily integrated with a glazed &lt;/ins&gt;cladding system&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;, avoids the visual interference of diagonals and complements the rectilinear language of the neighbouring buildings&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;lean of &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;outer truss has structural as well as aesthetic benefits as &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;top boom of &lt;/del&gt;the truss&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;, which is in tension over much &lt;/del&gt;of &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;its length, becomes straighter &lt;/del&gt;and &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;therefore more efficient&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;bridge is subtlety curved in plan. The trusses vary gradually in height from 4.5m at &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;ends to 6.5m at &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;centre pier and &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;outermost &lt;/ins&gt;truss &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;develops a deliberate lean &lt;/ins&gt;of &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;up to 15 degrees. These geometric devices achieve an even greater sense of space &lt;/ins&gt;and &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;transparency. The constantly changing geometry combines with the plan curve to give the crossing a dynamism and drama that is reinforced by the cladding system&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The outer profile of the vertical and horizontal members is shaped to &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;define &lt;/del&gt;sharp edges and chamfered planes which are defined by light and shadow to accentuate the form and reduce the visual mass in elevation.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;The lean of the outer truss has structural as well as aesthetic benefits as the top boom of the truss, which is in tension over much of its length, becomes straighter and therefore more efficient. &lt;/ins&gt;The outer profile of the vertical and horizontal members is shaped to &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;create &lt;/ins&gt;sharp edges and chamfered planes which are defined by light and shadow to accentuate the form and reduce the visual mass in elevation.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The selected method of installation was an incremental launch procedure which required the design of significant temporary works and associated foundations&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The selected method of installation was an incremental launch procedure which required the design of significant temporary works and associated foundations&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Creativity&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;/&lt;/del&gt;Innovation =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Creativity &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;and &lt;/ins&gt;Innovation =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;bold &lt;/del&gt;decision to combine the use of weathering steel &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;for the structure &lt;/del&gt;with a high quality glazed façade &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;brings &lt;/del&gt;the structure a sophisticated urban appearance that harmonises with its environment yet makes it unique among architectural footbridges. At 130m long, it is thought to be the largest single footbridge structure fabricated from weathering steel plate.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The decision to combine the use of weathering steel with a high&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;-&lt;/ins&gt;quality glazed façade &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;gives &lt;/ins&gt;the structure a sophisticated urban appearance that harmonises with its environment yet makes it unique among architectural footbridges. At 130m long, it is thought to be the largest single footbridge structure fabricated from weathering steel plate.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The central pier was constructed in the footprint of an existing signal box with very restricted access for plant and materials. The design solution was an innovative minipile design incorporating tubular steel sections as permanent casing and reinforcement.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The central pier was constructed in the footprint of an existing signal box with very restricted access for plant and materials. The design solution was an innovative minipile design incorporating tubular steel sections as permanent casing and reinforcement.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The incremental launch procedure had to be undertaken around a curved alignment with &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;tight &lt;/del&gt;special constraints above and beside the bridge. The temporary works were carefully designed with input from a specialist &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;launch &lt;/del&gt;contractor to enable the launch to be carried out in three weekend operations.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The incremental launch procedure had to be undertaken around a curved alignment with special constraints above and beside the bridge. The temporary works were carefully designed with input from a specialist contractor to enable the launch to be carried out in three weekend operations.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Excellence =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Excellence =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Care was taken in the bridge detailing in order to produce a design whose aesthetic qualities &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;were &lt;/del&gt;intrinsic to the structure. The use of weathering steel offers great potential benefits in terms of durability, however &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;this &lt;/del&gt;requires skilful detailing. The design team conducted its own tests on the weathering process and visited precedents. Best practice in relation to the use of this material was researched prior to &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;the &lt;/del&gt;detailed design and as a result the truss chords were developed with in built drip details and chamfer plates to prevent pigeon roosting.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Care was taken in the bridge detailing in order to produce a design whose aesthetic qualities &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;are &lt;/ins&gt;intrinsic to the structure. The use of weathering steel offers great potential benefits in terms of durability, however &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;it &lt;/ins&gt;requires skilful detailing. The design team conducted its own tests on the weathering process and visited precedents. Best practice in relation to the use of this material was researched prior to detailed design and as a result the truss chords were developed with in&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;-&lt;/ins&gt;built drip details and chamfer plates to prevent pigeon roosting.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;It was recognised that a high standard of workmanship and dimensional control was essential to the successful delivery of the project. For this reason, intensive workshops were held within the design and construction team to carefully plan the execution of the fabrication and erection of the bridge and its finishes. For example, it was vital that the launch surface of the underside of the trusses was perfectly flat to ensure a smooth installation. In the event, remarkable standards were achieved which are a tribute to the expertise and ingenuity of the individuals involved.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;It was recognised that a high standard of workmanship and dimensional control was essential to the successful delivery of the project. For this reason, intensive workshops were held within the design and construction team to carefully plan the execution of the fabrication and erection of the bridge and its finishes. For example, it was vital that the launch surface of the underside of the trusses was perfectly flat to ensure a smooth installation. In the event, remarkable standards were achieved which are a tribute to the expertise and ingenuity of the individuals involved.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 48:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 41:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Adherence to programme for the bridge construction was critical to the adjacent retail development due to need to occupy part of the site for assembly. The design of the bridge was also significantly affected by the chosen method of installation and the engineer was therefore novated to the contract for the detailed design.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Adherence to programme for the bridge construction was critical to the adjacent retail development due to need to occupy part of the site for assembly. The design of the bridge was also significantly affected by the chosen method of installation and the engineer was therefore novated to the contract for the detailed design.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge sections were prefabricated off site and delivered in transportable sections for assembly by welding adjacent to the bridge’s final position. Custom-designed temporary works were required to maintain the geometric relationship between adjacent units.&amp;lt;br/&amp;gt; &amp;lt;br/&amp;gt;A launching nose and tail frame were installed and the first 48m section of the bridge was slid into position using strand jacks to pull the rear of the assembly forward and low friction skates to support the bottom chords of the trusses. This process was then repeated for the second and third sections of the bridge – the individual launch stages being separated by several weeks to allow for the intermediate assembly&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The bridge sections were prefabricated off site and delivered in transportable sections for assembly by welding adjacent to the bridge’s final position. Custom-designed temporary works were required to maintain the geometric relationship between adjacent units.&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;A launching nose and tail frame were installed and the first 48m section of the bridge was slid into position using strand jacks to pull the rear of the assembly forward and low friction skates to support the bottom chords of the trusses. This process was then repeated for the second and third sections of the bridge – the individual launch stages being separated by several weeks to allow for the intermediate assembly&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;By the third bridge launch, the railway authorities had developed sufficient confidence in the project team’s competency and the careful planning of the operation to permit work to be carried out without a railway possession or station closure, thus avoiding disruption and inconvenience to passengers – this is understood to be a first.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;By the third bridge launch, the railway authorities had developed sufficient confidence in the project team’s competency and the careful planning of the operation to permit work to be carried out without a railway possession or station closure, thus avoiding disruption and inconvenience to passengers – this is understood to be a first.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 69:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 62:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Project team =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Project team =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Client: Westfield Shoppingtowns Ltd &amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Client: Westfield Shoppingtowns Ltd&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Bridge Engineer: Buro Happold Ltd &amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Bridge Engineer: Buro Happold Ltd&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Architect: Knight Architects &amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Architect: Knight Architects&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Main Contractor: Morgan Est PLC &amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Main Contractor: Morgan Est PLC&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Steel Fabricator: Watson Steel &amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Steel Fabricator: Watson Steel&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Specialist Launch Contractor: ALE &amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Specialist Launch Contractor: ALE&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Glazing Subcontractor: AGF&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Glazing Subcontractor: AGF&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Projects_and_case_studies]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Projects_and_case_studies]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Stratford_Town_Centre_Link&amp;diff=12528&amp;oldid=prev</id>
		<title>Designing Buildings: Created page with &quot;&lt;div&gt; = Description = &lt;br/&gt;  &lt;/div&gt; &lt;br/&gt;  The Stratford Town Centre Link is a landmark structure forming the gateway to the Stratford City development in East London. Conceived ...&quot;</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Stratford_Town_Centre_Link&amp;diff=12528&amp;oldid=prev"/>
				<updated>2013-08-02T06:53:29Z</updated>
		
		<summary type="html">&lt;p&gt;Created page with &amp;quot;&amp;lt;div&amp;gt; = Description = &amp;lt;br/&amp;gt;  &amp;lt;/div&amp;gt; &amp;lt;br/&amp;gt;  The Stratford Town Centre Link is a landmark structure forming the gateway to the Stratford City development in East London. Conceived ...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;&amp;lt;div&amp;gt;&lt;br /&gt;
= Description =&lt;br /&gt;
&amp;lt;br/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;/div&amp;gt;&lt;br /&gt;
&amp;lt;br/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
The Stratford Town Centre Link is a landmark structure forming the gateway to the Stratford City development in East London. Conceived as an “urban piazza”, its location makes it an important link for the local community as well as a significant route into the Olympic Park for the 2012 Games. It was completed on 12th September 2011.&lt;br /&gt;
&lt;br /&gt;
The bridge crosses eleven railway lines including Network Rail and London Underground assets as well as the platforms of Stratford Regional Station and a highway. Its high profile location demanded utmost attention to safety, quality and inventiveness in delivery.&lt;br /&gt;
&lt;br /&gt;
This project is notable for a number of reasons:&lt;br /&gt;
&lt;br /&gt;
*A striking and unique design combining the use of low-maintenance weathering steel and glazing;&lt;br /&gt;
*Exceptional standards of construction, and&lt;br /&gt;
*The ingenious method of installation which culminated in the first known live bridge launch over an operational station in the UK.&lt;br /&gt;
&lt;br /&gt;
= Design Concept =&lt;br /&gt;
&lt;br /&gt;
The development of the bridge concept was a close collaboration between the client, architect and engineer. The engineering constraints included geometric clearances, limited positions for supports and the need to design for minimal long term maintenance. Architecturally the bridge needed a strong presence whilst providing an open yet secure environment above the railway. From a construction point of view, disruption to the railway needed to be minimised.&lt;br /&gt;
&lt;br /&gt;
The selected design comprises a ladder beam arrangement with steel side trusses fabricated entirely from weathering steel, forming two equal spans of 65m. The bridge width, dictated by crowd flows of up to 80,000 people per hour during the Games, is 12m. A full height glazed façade is provided along each side and this open structure without diagonals provides suitable edge protection against falling objects without detriment to the experience of the user. A Vierendeel truss form was selected because it is more easily integrated with a glazed cladding system, avoids the visual interference of diagonals and complements the rectilinear language of the neighbouring buildings.&lt;br /&gt;
&lt;br /&gt;
The bridge is curved subtlety in plan, the trusses vary gradually in height from 4.5m at the ends to 6.5m at the centre pier and the outermost truss develops a deliberate lean of up to 15 degrees. These clever geometric devices achieve an even greater sense of space and transparency. The constantly changing geometry combines with the plan curve to give the crossing a dynamism and drama that is reinforced by the cladding system.&lt;br /&gt;
&lt;br /&gt;
The lean of the outer truss has structural as well as aesthetic benefits as the top boom of the truss, which is in tension over much of its length, becomes straighter and therefore more efficient.&lt;br /&gt;
&lt;br /&gt;
The outer profile of the vertical and horizontal members is shaped to define sharp edges and chamfered planes which are defined by light and shadow to accentuate the form and reduce the visual mass in elevation.&lt;br /&gt;
&lt;br /&gt;
The selected method of installation was an incremental launch procedure which required the design of significant temporary works and associated foundations&lt;br /&gt;
&lt;br /&gt;
= Creativity/Innovation =&lt;br /&gt;
&lt;br /&gt;
The bold decision to combine the use of weathering steel for the structure with a high quality glazed façade brings the structure a sophisticated urban appearance that harmonises with its environment yet makes it unique among architectural footbridges. At 130m long, it is thought to be the largest single footbridge structure fabricated from weathering steel plate.&lt;br /&gt;
&lt;br /&gt;
The central pier was constructed in the footprint of an existing signal box with very restricted access for plant and materials. The design solution was an innovative minipile design incorporating tubular steel sections as permanent casing and reinforcement.&lt;br /&gt;
&lt;br /&gt;
The incremental launch procedure had to be undertaken around a curved alignment with tight special constraints above and beside the bridge. The temporary works were carefully designed with input from a specialist launch contractor to enable the launch to be carried out in three weekend operations.&lt;br /&gt;
&lt;br /&gt;
= Excellence =&lt;br /&gt;
&lt;br /&gt;
Care was taken in the bridge detailing in order to produce a design whose aesthetic qualities were intrinsic to the structure. The use of weathering steel offers great potential benefits in terms of durability, however this requires skilful detailing. The design team conducted its own tests on the weathering process and visited precedents. Best practice in relation to the use of this material was researched prior to the detailed design and as a result the truss chords were developed with in built drip details and chamfer plates to prevent pigeon roosting.&lt;br /&gt;
&lt;br /&gt;
It was recognised that a high standard of workmanship and dimensional control was essential to the successful delivery of the project. For this reason, intensive workshops were held within the design and construction team to carefully plan the execution of the fabrication and erection of the bridge and its finishes. For example, it was vital that the launch surface of the underside of the trusses was perfectly flat to ensure a smooth installation. In the event, remarkable standards were achieved which are a tribute to the expertise and ingenuity of the individuals involved.&lt;br /&gt;
&lt;br /&gt;
= Construction =&lt;br /&gt;
&lt;br /&gt;
Adherence to programme for the bridge construction was critical to the adjacent retail development due to need to occupy part of the site for assembly. The design of the bridge was also significantly affected by the chosen method of installation and the engineer was therefore novated to the contract for the detailed design.&lt;br /&gt;
&lt;br /&gt;
The bridge sections were prefabricated off site and delivered in transportable sections for assembly by welding adjacent to the bridge’s final position. Custom-designed temporary works were required to maintain the geometric relationship between adjacent units.&amp;lt;br/&amp;gt; &amp;lt;br/&amp;gt;A launching nose and tail frame were installed and the first 48m section of the bridge was slid into position using strand jacks to pull the rear of the assembly forward and low friction skates to support the bottom chords of the trusses. This process was then repeated for the second and third sections of the bridge – the individual launch stages being separated by several weeks to allow for the intermediate assembly&lt;br /&gt;
&lt;br /&gt;
By the third bridge launch, the railway authorities had developed sufficient confidence in the project team’s competency and the careful planning of the operation to permit work to be carried out without a railway possession or station closure, thus avoiding disruption and inconvenience to passengers – this is understood to be a first.&lt;br /&gt;
&lt;br /&gt;
= Safety =&lt;br /&gt;
&lt;br /&gt;
The bridge’s location above a busy railway and station meant that health and safety considerations were paramount. Its design was profoundly influenced by the need to ensure the safety and practicality of the method of construction.&lt;br /&gt;
&lt;br /&gt;
A three stage incremental launch process was necessary due to the limited working area available for assembly adjacent to the bridge site. Permanent formwork soffit panels and temporary side screens were deployed to provide a secure working environment. Showing considerable foresight, the Client commissioned a computer animation to clearly communicate the complex sequencing to the approval authorities and operatives.&lt;br /&gt;
&lt;br /&gt;
Safety of the bridge in service has also been an important issue. Maintenance risks have been significantly reduced by employing weathering steel for the main structure, which therefore requires minimal long term maintenance. The high sides to the structure protect the railway from falling or thrown objects. Special glazing tests, involving the dropping of a steel sphere from a height of 15m, were carried out to prove the integrity of the laminated glass to the approval authorities. The bridge lighting, which is simple yet striking, is effective in providing a well lit and non-threatening environment for users at night.&lt;br /&gt;
&lt;br /&gt;
= Sustainability =&lt;br /&gt;
&lt;br /&gt;
The bridge materials were selected in order to maximise durability and minimise maintenance of the bridge, which is an important consideration given its location above a busy railway. Consequently life cycle costs are minimised. The bridge design was also driven by the desire to minimise construction time and impact. The bridge brings significant local benefits in terms of connectivity.&lt;br /&gt;
&lt;br /&gt;
= Performance against prediction =&lt;br /&gt;
&lt;br /&gt;
The project has required close cooperation between the client, designers, main contractor and steel fabricator to deliver a complex structure within a tight timescale. It is a tribute to the team members that the project was completed on time and within budget.&lt;br /&gt;
&lt;br /&gt;
= Project team =&lt;br /&gt;
*Client: Westfield Shoppingtowns Ltd &lt;br /&gt;
*Bridge Engineer: Buro Happold Ltd &lt;br /&gt;
*Architect: Knight Architects &lt;br /&gt;
*Main Contractor: Morgan Est PLC &lt;br /&gt;
*Steel Fabricator: Watson Steel &lt;br /&gt;
*Specialist Launch Contractor: ALE &lt;br /&gt;
*Glazing Subcontractor: AGF&lt;br /&gt;
&lt;br /&gt;
[[Category:Projects_and_case_studies]]&lt;/div&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	</feed>