<?xml version="1.0"?>
<?xml-stylesheet type="text/css" href="https://www.designingbuildings.co.uk/skins/common/feed.css?301"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
		<id>https://www.designingbuildings.co.uk/w/index.php?action=history&amp;feed=atom&amp;title=Invert</id>
		<title>Invert - Revision history</title>
		<link rel="self" type="application/atom+xml" href="https://www.designingbuildings.co.uk/w/index.php?action=history&amp;feed=atom&amp;title=Invert"/>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;action=history"/>
		<updated>2026-05-05T08:14:54Z</updated>
		<subtitle>Revision history for this page on the wiki</subtitle>
		<generator>MediaWiki 1.17.4</generator>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=262117&amp;oldid=prev</id>
		<title>Kevin F. Cory at 17:50, 25 September 2023</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=262117&amp;oldid=prev"/>
				<updated>2023-09-25T17:50:48Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 17:50, 25 September 2023&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Introduction =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Introduction =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In a &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;[https://entertainseries.com/ &lt;/del&gt;pipe&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;]&lt;/del&gt;, sewer, channel or tunnel, the invert is the lowest point upon which water can flow on the inside. If circular in shape, the invert is the lowest point on the inner circle if looking at a section of the construction. The invert may be considered the 'floor level' of the vessel in question.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In a pipe, sewer, channel or tunnel, the invert is the lowest point upon which water can flow on the inside. If circular in shape, the invert is the lowest point on the inner circle if looking at a section of the construction. The invert may be considered the 'floor level' of the vessel in question.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In a tunnel constructed by drill and blast or by NATM (New Austrian Tunnelling Method), the invert will vary according to the stage of the construction: the invert will always be the lowest point inside that has been excavated at that point in time. This will become lower as the excavation proceeds, with the final invert level being that of the complete tunnel.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In a tunnel constructed by drill and blast or by NATM (New Austrian Tunnelling Method), the invert will vary according to the stage of the construction: the invert will always be the lowest point inside that has been excavated at that point in time. This will become lower as the excavation proceeds, with the final invert level being that of the complete tunnel.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Kevin F. Cory</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=262116&amp;oldid=prev</id>
		<title>Kevin F. Cory at 17:50, 25 September 2023</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=262116&amp;oldid=prev"/>
				<updated>2023-09-25T17:50:15Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 17:50, 25 September 2023&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Introduction =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Introduction =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In a pipe, sewer, channel or tunnel, the invert is the lowest point upon which water can flow on the inside. If circular in shape, the invert is the lowest point on the inner circle if looking at a section of the construction. The invert may be considered the 'floor level' of the vessel in question.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In a &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;[https://entertainseries.com/ &lt;/ins&gt;pipe&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;]&lt;/ins&gt;, sewer, channel or tunnel, the invert is the lowest point upon which water can flow on the inside. If circular in shape, the invert is the lowest point on the inner circle if looking at a section of the construction. The invert may be considered the 'floor level' of the vessel in question.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In a tunnel constructed by drill and blast or by NATM (New Austrian Tunnelling Method), the invert will vary according to the stage of the construction: the invert will always be the lowest point inside that has been excavated at that point in time. This will become lower as the excavation proceeds, with the final invert level being that of the complete tunnel.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In a tunnel constructed by drill and blast or by NATM (New Austrian Tunnelling Method), the invert will vary according to the stage of the construction: the invert will always be the lowest point inside that has been excavated at that point in time. This will become lower as the excavation proceeds, with the final invert level being that of the complete tunnel.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 43:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 43:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= External Links =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= External Links =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;https://routineconstruction.com/what-is-invert-level-in-sewer-calculation-of-invert-level/surveying/ invert level&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;[&lt;/ins&gt;https://routineconstruction.com/what-is-invert-level-in-sewer-calculation-of-invert-level/surveying/ &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;https://routineconstruction.com/what-is-invert-level-in-sewer-calculation-of-invert-level/surveying/] &lt;/ins&gt;invert level&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:DCN_Definition]] [[Category:DCN_Guidance]] [[Category:DCN_Product_Knowledge]] [[Category:Theory]] [[Category:Construction_techniques]] [[Category:Design]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:DCN_Definition]] [[Category:DCN_Guidance]] [[Category:DCN_Product_Knowledge]] [[Category:Theory]] [[Category:Construction_techniques]] [[Category:Design]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Kevin F. Cory</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=258173&amp;oldid=prev</id>
		<title>Editor at 12:08, 10 July 2023</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=258173&amp;oldid=prev"/>
				<updated>2023-07-10T12:08:28Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 12:08, 10 July 2023&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 19:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 19:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Sometimes it may be necessary to reverse this calculation when the crown is known and the invert level is not known.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Sometimes it may be necessary to reverse this calculation when the crown is known and the invert level is not known.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Related articles on Designing Buildings &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Wiki &lt;/del&gt;=&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Manhole Design &amp;amp;amp; invert level.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;The of the manhole is kept equal to the invert level of the sewer line. A manhole is dug 2 feet below the invert level, and a layer of concrete is poured up to the invert level, then filled with concrete half the pipe height with a little dry concrete to match the size of the round pipe. Is. , which makes the manhole look like a conduit in reverse.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;If the pipes are coming from different sides in the main hole, the pipe is diverted towards the main pipe at a suitable slope with the help of concrete as per the occasion. And it is also called manhole bunching in engineering.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;And it is smoothed from the top so that the material flowing from the reverse surface of the manhole easily enters the pipeline of the manhole. The measurement from the invert level of the manhole to the top surface of the manhole is called the height of the manhole.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Related articles on Designing Buildings =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* At grade.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* At grade.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 32:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 40:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Trenchless technology.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Trenchless technology.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Tunnelling.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Tunnelling.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;= External Links =&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;https://routineconstruction.com/what-is-invert-level-in-sewer-calculation-of-invert-level/surveying/ invert level&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:DCN_Definition]] [[Category:DCN_Guidance]] [[Category:DCN_Product_Knowledge]] [[Category:Theory]] [[Category:Construction_techniques]] [[Category:Design]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:DCN_Definition]] [[Category:DCN_Guidance]] [[Category:DCN_Product_Knowledge]] [[Category:Theory]] [[Category:Construction_techniques]] [[Category:Design]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Editor</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=258172&amp;oldid=prev</id>
		<title>Editor: Reverted edits by Kevin F. Cory (talk) to last revision by Designing Buildings</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=258172&amp;oldid=prev"/>
				<updated>2023-07-10T12:05:24Z</updated>
		
		<summary type="html">&lt;p&gt;Reverted edits by &lt;a href=&quot;/wiki/Special:Contributions/Kevin_F._Cory&quot; title=&quot;Special:Contributions/Kevin F. Cory&quot;&gt;Kevin F. Cory&lt;/a&gt; (&lt;a href=&quot;/wiki/User_talk:Kevin_F._Cory&quot;&gt;talk&lt;/a&gt;) to last revision by &lt;a href=&quot;/wiki/User:Designing_Buildings&quot; title=&quot;User:Designing Buildings&quot;&gt;Designing Buildings&lt;/a&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 12:05, 10 July 2023&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 18:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 18:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Sometimes it may be necessary to reverse this calculation when the crown is known and the invert level is not known.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Sometimes it may be necessary to reverse this calculation when the crown is known and the invert level is not known.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;Manhole Design &amp;amp;amp; invert level.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;The [https://routineconstruction.com/what-is-invert-level-in-sewer-calculation-of-invert-level/surveying/ invert level] of the manhole is kept equal to the invert level of the sewer line. A manhole is dug 2 feet below the invert level, and a layer of concrete is poured up to the invert level, then filled with concrete half the pipe height with a little dry concrete to match the size of the round pipe. Is. , which makes the manhole look like a conduit in reverse.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;If the pipes are coming from different sides in the main hole, the pipe is diverted towards the main pipe at a suitable slope with the help of concrete as per the occasion. And it is also called manhole bunching in engineering.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;And it is smoothed from the top so that the material flowing from the reverse surface of the manhole easily enters the pipeline of the manhole. The measurement from the invert level of the manhole to the top surface of the manhole is called the height of the manhole.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Related articles on Designing Buildings Wiki =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Related articles on Designing Buildings Wiki =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Editor</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=258171&amp;oldid=prev</id>
		<title>Kevin F. Cory at 11:39, 10 July 2023</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=258171&amp;oldid=prev"/>
				<updated>2023-07-10T11:39:16Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 11:39, 10 July 2023&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 18:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 18:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Sometimes it may be necessary to reverse this calculation when the crown is known and the invert level is not known.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Sometimes it may be necessary to reverse this calculation when the crown is known and the invert level is not known.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;Manhole Design &amp;amp;amp; invert level.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;The [https://routineconstruction.com/what-is-invert-level-in-sewer-calculation-of-invert-level/surveying/ invert level] of the manhole is kept equal to the invert level of the sewer line. A manhole is dug 2 feet below the invert level, and a layer of concrete is poured up to the invert level, then filled with concrete half the pipe height with a little dry concrete to match the size of the round pipe. Is. , which makes the manhole look like a conduit in reverse.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;If the pipes are coming from different sides in the main hole, the pipe is diverted towards the main pipe at a suitable slope with the help of concrete as per the occasion. And it is also called manhole bunching in engineering.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;And it is smoothed from the top so that the material flowing from the reverse surface of the manhole easily enters the pipeline of the manhole. The measurement from the invert level of the manhole to the top surface of the manhole is called the height of the manhole.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Related articles on Designing Buildings Wiki =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Related articles on Designing Buildings Wiki =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Kevin F. Cory</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=189573&amp;oldid=prev</id>
		<title>Designing Buildings at 08:05, 13 January 2021</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=189573&amp;oldid=prev"/>
				<updated>2021-01-13T08:05:20Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 08:05, 13 January 2021&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 33:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 33:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Tunnelling.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Tunnelling.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Theory]] [[Category:Construction_techniques]] [[Category:Design]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;[[Category:DCN_Definition]] [[Category:DCN_Guidance]] [[Category:DCN_Product_Knowledge]] &lt;/ins&gt;[[Category:Theory]] [[Category:Construction_techniques]] [[Category:Design]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=136377&amp;oldid=prev</id>
		<title>Editor at 19:09, 30 May 2019</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=136377&amp;oldid=prev"/>
				<updated>2019-05-30T19:09:16Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 19:09, 30 May 2019&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 26:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 26:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Cofferdam.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Cofferdam.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Controlled waters.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Controlled waters.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;* Datum.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Drainage.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Drainage.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Ordnance Datum.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Ordnance Datum.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Editor</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=128205&amp;oldid=prev</id>
		<title>Editor at 10:28, 19 February 2019</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=128205&amp;oldid=prev"/>
				<updated>2019-02-19T10:28:01Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 10:28, 19 February 2019&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 28:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 28:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Drainage.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Drainage.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Ordnance Datum.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Ordnance Datum.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;NATM&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Construction acronyms&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Trenchless technology.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Trenchless technology.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Tunnelling.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Tunnelling.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Theory]] [[Category:Construction_techniques]] [[Category:Design]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Theory]] [[Category:Construction_techniques]] [[Category:Design]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Editor</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=128204&amp;oldid=prev</id>
		<title>Editor at 10:26, 19 February 2019</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=128204&amp;oldid=prev"/>
				<updated>2019-02-19T10:26:54Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 10:26, 19 February 2019&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 4:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 4:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In a tunnel constructed by drill and blast or by NATM (New Austrian Tunnelling Method), the invert will vary according to the stage of the construction: the invert will always be the lowest point inside that has been excavated at that point in time. This will become lower as the excavation proceeds, with the final invert level being that of the complete tunnel.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In a tunnel constructed by drill and blast or by NATM (New Austrian Tunnelling Method), the invert will vary according to the stage of the construction: the invert will always be the lowest point inside that has been excavated at that point in time. This will become lower as the excavation proceeds, with the final invert level being that of the complete tunnel.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;Also, a tunnel being constructed using NATM (sometimes called 'sequential excavation') may have two or three varying inverts as excavation of the centre and sides of the tunnel may be at different stages.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;An invert will typically be laid to a gradient, particularly if it is to convey liquids, such as in a pipe or sewer. The level of the gradient will therefore vary according to the position of the invert along the flow.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;An invert will typically be laid to a gradient, particularly if it is to convey liquids, such as in a pipe or sewer. The level of the gradient will therefore vary according to the position of the invert along the flow.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 11:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 13:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In contrast, the ‘crown’ of the tunnel or pipe is that point located on the top external surface that is directly above the invert. One way to calculate the crown position is by adding (or subtracting) the internal diameter and the material’s thickness to (or from) the invert level.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In contrast, the ‘crown’ of the tunnel or pipe is that point located on the top external surface that is directly above the invert. One way to calculate the crown position is by adding (or subtracting) the internal diameter and the material’s thickness to (or from) the invert level.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;For example, if a 10m-internal diameter tunnel of circular-section with uniform 500mm thickness and an invert level of 16m below ground level, the crown level would be established by subtracting from the invert level &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;datum &lt;/del&gt;the internal diameter (10m) plus the material thickness, which is equivalent to: 16m – 10m – 0.5m = 5.5m.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;For example, if a 10m-internal diameter tunnel of circular-section with uniform 500mm thickness and an invert level of 16m below ground level, the crown level would be established by subtracting from the invert level the internal diameter (10m) plus &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;subtracting &lt;/ins&gt;the material thickness, which is equivalent to: 16m – 10m – 0.5m = 5.5m.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;So, the crown datum level is at 5.5m below ground.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;So, the crown datum level is at 5.5m below ground.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 26:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 28:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Drainage.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Drainage.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Ordnance Datum.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Ordnance Datum.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;* NATM.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Trenchless technology.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Trenchless technology.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Tunnelling.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Tunnelling.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Theory]] [[Category:Construction_techniques]] [[Category:Design]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Theory]] [[Category:Construction_techniques]] [[Category:Design]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Editor</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=128180&amp;oldid=prev</id>
		<title>Designing Buildings at 19:22, 18 February 2019</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Invert&amp;diff=128180&amp;oldid=prev"/>
				<updated>2019-02-18T19:22:59Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 19:22, 18 February 2019&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Introduction =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Introduction =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In a pipe, sewer, channel or tunnel, the invert is the lowest point upon which water can flow on the inside. If circular in shape, the invert is the lowest point on the inner circle if looking at a section of the construction. The invert may be considered the floor level of the vessel in question.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In a pipe, sewer, channel or tunnel, the invert is the lowest point upon which water can flow on the inside. If circular in shape, the invert is the lowest point on the inner circle if looking at a section of the construction. The invert may be considered the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;'&lt;/ins&gt;floor level&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;' &lt;/ins&gt;of the vessel in question.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In a tunnel constructed by drill and blast or by NATM, the invert will vary according to the stage of the construction: the invert will always be the lowest point inside that has been excavated at that point in time. This will become &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;increasingly &lt;/del&gt;lower as the excavation proceeds, with the final invert level being that of the complete tunnel.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In a tunnel constructed by drill and blast or by NATM &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;(New Austrian Tunnelling Method)&lt;/ins&gt;, the invert will vary according to the stage of the construction: the invert will always be the lowest point inside that has been excavated at that point in time. This will become lower as the excavation proceeds, with the final invert level being that of the complete tunnel.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;An invert will typically be laid to a gradient, particularly if it is to convey liquids, such as in a pipe or sewer. The level of the gradient will therefore vary according to the position of the invert along the flow.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;An invert will typically be laid to a gradient, particularly if it is to convey liquids, such as in a pipe or sewer. The level of the gradient will therefore vary according to the position of the invert along the flow.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	</feed>