<?xml version="1.0"?>
<?xml-stylesheet type="text/css" href="https://www.designingbuildings.co.uk/skins/common/feed.css?301"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
		<id>https://www.designingbuildings.co.uk/w/index.php?action=history&amp;feed=atom&amp;title=Handover_and_close_out</id>
		<title>Handover and close out - Revision history</title>
		<link rel="self" type="application/atom+xml" href="https://www.designingbuildings.co.uk/w/index.php?action=history&amp;feed=atom&amp;title=Handover_and_close_out"/>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;action=history"/>
		<updated>2026-05-17T11:43:30Z</updated>
		<subtitle>Revision history for this page on the wiki</subtitle>
		<generator>MediaWiki 1.17.4</generator>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=176489&amp;oldid=prev</id>
		<title>Editor at 10:36, 2 October 2020</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=176489&amp;oldid=prev"/>
				<updated>2020-10-02T10:36:23Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 10:36, 2 October 2020&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 27:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 27:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Appointing consultants.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Appointing consultants.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* BREEAM Handover.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* BREEAM Handover.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Comparison of work stages&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Comparison of work stages&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;* Creating an asset register for construction projects.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Defects liability period.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Defects liability period.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Designing Buildings Wiki Project plans.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Designing Buildings Wiki Project plans.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Editor</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=174150&amp;oldid=prev</id>
		<title>Designing Buildings at 07:54, 17 September 2020</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=174150&amp;oldid=prev"/>
				<updated>2020-09-17T07:54:46Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 07:54, 17 September 2020&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 41:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 41:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* [http://www.ribaplanofwork.com/ RIBA Plan of Work 2013].&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* [http://www.ribaplanofwork.com/ RIBA Plan of Work 2013].&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Design]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;[[Category:DCN_Definition]] [[Category:DCN_Guidance]] [[Category:DCN_Standard]] &lt;/ins&gt;[[Category:Design]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=155397&amp;oldid=prev</id>
		<title>Designing Buildings at 14:52, 4 March 2020</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=155397&amp;oldid=prev"/>
				<updated>2020-03-04T14:52:57Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 14:52, 4 March 2020&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 4:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 4:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The process for completing the design and construction of a building is often divided into notional ‘stages’. This can be helpful in establishing milestones for the submission of progress reports, the preparation of information for approval, client gateways, and for making payments. However there is a great deal of ambiguity between the naming of stages by different organisations and the definition of what individual stages include (see comparison of work stages). As a result, it is important that appointment documents make it clear explicitly what activities fall within which stage, and what level of detail is required, rather than relying on rather vague stage names.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The process for completing the design and construction of a building is often divided into notional ‘stages’. This can be helpful in establishing milestones for the submission of progress reports, the preparation of information for approval, client gateways, and for making payments. However there is a great deal of ambiguity between the naming of stages by different organisations and the definition of what individual stages include (see comparison of work stages). As a result, it is important that appointment documents make it clear explicitly what activities fall within which stage, and what level of detail is required, rather than relying on rather vague stage names.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;‘Handover and Close Out’ &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;is &lt;/del&gt;a new phrase coined by the Royal Institute of British Architects (RIBA) for the 2013 Plan of Work. This plan &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;comprises &lt;/del&gt;eight work stages, and its new terminology, stage referencing system and lack of detail have generated some criticism.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;‘Handover and Close Out’ &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;was &lt;/ins&gt;a new phrase coined by the Royal Institute of British Architects (RIBA) for the 2013 Plan of Work. This plan &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;comprised &lt;/ins&gt;eight work stages, and its new terminology, stage referencing system and lack of detail have generated some criticism.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* 0 - Strategic definition.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* 0 - Strategic definition.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 21:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 21:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Previously, this stage might have been described as the ‘defects liability period’, the period which begins on certification of practical completion at the end of the construction stage and typically lasts six to twelve months, during which the client takes possession of the site, defects are rectified and then the final certificate issued. This is perhaps a better description of the stage and in the Designing Buildings Wiki project plans, we describe this stage as the ‘occupation and defects liability period’&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Previously, this stage might have been described as the ‘defects liability period’, the period which begins on certification of practical completion at the end of the construction stage and typically lasts six to twelve months, during which the client takes possession of the site, defects are rectified and then the final certificate issued. This is perhaps a better description of the stage and in the Designing Buildings Wiki project plans, we describe this stage as the ‘occupation and defects liability period’&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;= Find out more =&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;The 2020 edition of the RIBA Plan of Work has renamed this stage 'Handover'.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;==&lt;/del&gt;= Related articles on Designing Buildings Wiki &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;==&lt;/del&gt;=&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Related articles on Designing Buildings Wiki =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Appointing consultants.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Appointing consultants.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=155396&amp;oldid=prev</id>
		<title>Designing Buildings at 14:52, 4 March 2020</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=155396&amp;oldid=prev"/>
				<updated>2020-03-04T14:52:07Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 14:52, 4 March 2020&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;NB The 2020 edition of the RIBA Plan of Work has renamed this stage 'Handover'.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;-----&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The process for completing the design and construction of a building is often divided into notional ‘stages’. This can be helpful in establishing milestones for the submission of progress reports, the preparation of information for approval, client gateways, and for making payments. However there is a great deal of ambiguity between the naming of stages by different organisations and the definition of what individual stages include (see comparison of work stages). As a result, it is important that appointment documents make it clear explicitly what activities fall within which stage, and what level of detail is required, rather than relying on rather vague stage names.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The process for completing the design and construction of a building is often divided into notional ‘stages’. This can be helpful in establishing milestones for the submission of progress reports, the preparation of information for approval, client gateways, and for making payments. However there is a great deal of ambiguity between the naming of stages by different organisations and the definition of what individual stages include (see comparison of work stages). As a result, it is important that appointment documents make it clear explicitly what activities fall within which stage, and what level of detail is required, rather than relying on rather vague stage names.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=101795&amp;oldid=prev</id>
		<title>Designing Buildings at 16:49, 19 March 2018</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=101795&amp;oldid=prev"/>
				<updated>2018-03-19T16:49:20Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 16:49, 19 March 2018&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The process for completing the design and construction of a building is often divided into notional ‘stages’. This can be helpful in establishing milestones for the submission of progress reports, the preparation of information for approval, client gateways, and for making payments. However there is a great deal of ambiguity between the naming of stages by different organisations and the definition of what individual stages include (see comparison of work stages). As a result, it is important that appointment documents make it clear explicitly what activities fall within which stage, and what level of detail is required, rather than relying on rather vague stage names.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The process for completing the design and construction of a building is often divided into notional ‘stages’. This can be helpful in establishing milestones for the submission of progress reports, the preparation of information for approval, client gateways, and for making payments. However there is a great deal of ambiguity between the naming of stages by different organisations and the definition of what individual stages include (see comparison of work stages). As a result, it is important that appointment documents make it clear explicitly what activities fall within which stage, and what level of detail is required, rather than relying on rather vague stage names.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;‘Handover and Close Out’ is a new phrase coined by the Royal Institute of British Architects (RIBA) for the 2013 Plan of Work. This plan comprises eight work stages, and its new terminology, stage referencing system and lack of detail have generated some criticism.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;‘Handover and Close Out’ is a new phrase coined by the Royal Institute of British Architects (RIBA) for the 2013 Plan of Work. This plan comprises eight work stages, and its new terminology, stage referencing system and lack of detail have generated some criticism.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*0 - Strategic definition.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*1 - Preparation and brief.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* 0 - Strategic definition.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*2 - Concept design.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* 1 - Preparation and brief.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*3 - Developed design.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* 2 - Concept design.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*4 - Technical design.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* 3 - Developed design.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*5 - Construction.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* 4 - Technical design.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*6 - Handover and close out.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* 5 - Construction.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*7 - In use.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* 6 - Handover and close out.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* 7 - In use.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The RIBA states that Stage 6, Handover and Close Out maps broadly to the former Stage L: Post Practical Completion.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The RIBA states that Stage 6, Handover and Close Out maps broadly to the former Stage L: Post Practical Completion.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 21:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 21:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;=== Related articles on Designing Buildings Wiki ===&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;=== Related articles on Designing Buildings Wiki ===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Appointing consultants.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Comparison of work stages&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Appointing consultants&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Defects liability period.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;* BREEAM Handover&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Designing Buildings Wiki Project plans.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Comparison of work stages&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Developed design.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Defects liability period.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Handover to client.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Designing Buildings Wiki Project plans.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Migration strategy.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Developed design.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*RIBA Plan of Work.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Handover to client.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Soft landings.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Migration strategy.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Traditional contract: occupation and defects liability period.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* RIBA Plan of Work.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Soft landings.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Traditional contract: occupation and defects liability period.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;=== External references ===&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;=== External references ===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*[http://www.ribaplanofwork.com/ RIBA Plan of Work 2013].&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* [http://www.ribaplanofwork.com/ RIBA Plan of Work 2013].&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Design]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Design]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=38059&amp;oldid=prev</id>
		<title>Designing Buildings at 07:34, 9 October 2015</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=38059&amp;oldid=prev"/>
				<updated>2015-10-09T07:34:06Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 07:34, 9 October 2015&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 21:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 21:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;=== Related articles on Designing Buildings Wiki ===&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;=== Related articles on Designing Buildings Wiki ===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Appointment&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Appointing consultants&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Comparison of work stages&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Comparison of work stages&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Defects liability period.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Defects liability period.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=18254&amp;oldid=prev</id>
		<title>Designing Buildings at 12:07, 25 February 2014</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=18254&amp;oldid=prev"/>
				<updated>2014-02-25T12:07:47Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 12:07, 25 February 2014&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 12:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 12:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*7 - In use.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*7 - In use.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The RIBA states that &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;‘Stage &lt;/del&gt;6 Handover and Close Out maps broadly to the former Stage L &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;– &lt;/del&gt;Post Practical Completion &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;– services&lt;/del&gt;.&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;’&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The RIBA states that &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Stage &lt;/ins&gt;6&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;, &lt;/ins&gt;Handover and Close Out maps broadly to the former Stage L&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;: &lt;/ins&gt;Post Practical Completion.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;They describe the activities carried out during the stage as, ‘handover of building and conclusion of building contract’ including updating ‘as constructed’ information, commissioning, training and perhaps post-occupancy evaluation following the ‘soft landings’ process. Presumably the stage also includes tasks associated with the defects liability period and issuing the final certificate, although these are not described.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;They describe the activities carried out during the stage as, ‘handover of building and conclusion of building contract’ including updating ‘as constructed’ information, commissioning, training and perhaps post-occupancy evaluation following the ‘soft landings’ process. Presumably the stage also includes tasks associated with the defects liability period and issuing the final certificate, although these are not described.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=18252&amp;oldid=prev</id>
		<title>Designing Buildings at 11:57, 25 February 2014</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=18252&amp;oldid=prev"/>
				<updated>2014-02-25T11:57:36Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 11:57, 25 February 2014&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 26:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 26:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Designing Buildings Wiki Project plans.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Designing Buildings Wiki Project plans.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Developed design.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Developed design.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;*Handover to client.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;*Migration strategy.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*RIBA Plan of Work.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*RIBA Plan of Work.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;*Soft landings.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Traditional contract: occupation and defects liability period.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;*Traditional contract: occupation and defects liability period.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;!-- diff cache key designingbuildings:diff:version:1.11a:oldid:18217:newid:18252 --&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=18217&amp;oldid=prev</id>
		<title>Designing Buildings: Created page with &quot; The process for completing the design and construction of a building is often divided into notional ‘stages’. This can be helpful in establishing milestones for the submissi...&quot;</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Handover_and_close_out&amp;diff=18217&amp;oldid=prev"/>
				<updated>2014-02-24T16:39:30Z</updated>
		
		<summary type="html">&lt;p&gt;Created page with &amp;quot; The process for completing the design and construction of a building is often divided into notional ‘stages’. This can be helpful in establishing milestones for the submissi...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;&lt;br /&gt;
The process for completing the design and construction of a building is often divided into notional ‘stages’. This can be helpful in establishing milestones for the submission of progress reports, the preparation of information for approval, client gateways, and for making payments. However there is a great deal of ambiguity between the naming of stages by different organisations and the definition of what individual stages include (see comparison of work stages). As a result, it is important that appointment documents make it clear explicitly what activities fall within which stage, and what level of detail is required, rather than relying on rather vague stage names.&lt;br /&gt;
&lt;br /&gt;
‘Handover and Close Out’ is a new phrase coined by the Royal Institute of British Architects (RIBA) for the 2013 Plan of Work. This plan comprises eight work stages, and its new terminology, stage referencing system and lack of detail have generated some criticism.&lt;br /&gt;
*0 - Strategic definition.&lt;br /&gt;
*1 - Preparation and brief.&lt;br /&gt;
*2 - Concept design.&lt;br /&gt;
*3 - Developed design.&lt;br /&gt;
*4 - Technical design.&lt;br /&gt;
*5 - Construction.&lt;br /&gt;
*6 - Handover and close out.&lt;br /&gt;
*7 - In use.&lt;br /&gt;
&lt;br /&gt;
The RIBA states that ‘Stage 6 Handover and Close Out maps broadly to the former Stage L – Post Practical Completion – services.’&lt;br /&gt;
&lt;br /&gt;
They describe the activities carried out during the stage as, ‘handover of building and conclusion of building contract’ including updating ‘as constructed’ information, commissioning, training and perhaps post-occupancy evaluation following the ‘soft landings’ process. Presumably the stage also includes tasks associated with the defects liability period and issuing the final certificate, although these are not described.&lt;br /&gt;
&lt;br /&gt;
Previously, this stage might have been described as the ‘defects liability period’, the period which begins on certification of practical completion at the end of the construction stage and typically lasts six to twelve months, during which the client takes possession of the site, defects are rectified and then the final certificate issued. This is perhaps a better description of the stage and in the Designing Buildings Wiki project plans, we describe this stage as the ‘occupation and defects liability period’&lt;br /&gt;
&lt;br /&gt;
= Find out more =&lt;br /&gt;
&lt;br /&gt;
=== Related articles on Designing Buildings Wiki ===&lt;br /&gt;
*Appointment.&lt;br /&gt;
*Comparison of work stages&lt;br /&gt;
*Defects liability period.&lt;br /&gt;
*Designing Buildings Wiki Project plans.&lt;br /&gt;
*Developed design.&lt;br /&gt;
*RIBA Plan of Work.&lt;br /&gt;
*Traditional contract: occupation and defects liability period.&lt;br /&gt;
&lt;br /&gt;
=== External references ===&lt;br /&gt;
*[http://www.ribaplanofwork.com/ RIBA Plan of Work 2013].&lt;br /&gt;
&lt;br /&gt;
[[Category:Design]]&lt;/div&gt;</summary>