<?xml version="1.0"?>
<?xml-stylesheet type="text/css" href="https://www.designingbuildings.co.uk/skins/common/feed.css?301"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
		<id>https://www.designingbuildings.co.uk/w/index.php?action=history&amp;feed=atom&amp;title=Fabrication</id>
		<title>Fabrication - Revision history</title>
		<link rel="self" type="application/atom+xml" href="https://www.designingbuildings.co.uk/w/index.php?action=history&amp;feed=atom&amp;title=Fabrication"/>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Fabrication&amp;action=history"/>
		<updated>2026-06-13T02:08:11Z</updated>
		<subtitle>Revision history for this page on the wiki</subtitle>
		<generator>MediaWiki 1.17.4</generator>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Fabrication&amp;diff=186027&amp;oldid=prev</id>
		<title>Designing Buildings at 06:48, 14 December 2020</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Fabrication&amp;diff=186027&amp;oldid=prev"/>
				<updated>2020-12-14T06:48:29Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 06:48, 14 December 2020&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 27:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 27:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* The overlooked secret of off-site fabrication.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* The overlooked secret of off-site fabrication.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Theory&lt;/del&gt;]] [[Category:&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Construction_techniques&lt;/del&gt;]] [[Category:&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Design&lt;/del&gt;]] [[Category:&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Products_/_components&lt;/del&gt;]] [[Category:&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;DCN_Product_Knowledge&lt;/del&gt;]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;DCN_Definition&lt;/ins&gt;]] [[Category:&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;DCN_Guidance&lt;/ins&gt;]] [[Category:&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Theory&lt;/ins&gt;]] [[Category:&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Construction_techniques&lt;/ins&gt;]] [[Category:&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Design]] [[Category:Products_/_components&lt;/ins&gt;]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Fabrication&amp;diff=137337&amp;oldid=prev</id>
		<title>Designing Buildings at 09:48, 13 June 2019</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Fabrication&amp;diff=137337&amp;oldid=prev"/>
				<updated>2019-06-13T09:48:35Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 09:48, 13 June 2019&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 6:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 6:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;A building’s windows are normally fabricated off-site to special dimensions that the fabricator has either taken off the drawings or specification, or else has visited the site and measured for the item to be supplied. The fabricator can then proceed to manufacture. It should be noted that a fabrication can be termed ‘prefabricated’ if it is made off site. Delivered to site ready to install means that these items can help reduce waste and time and cut emissions.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;A building’s windows are normally fabricated off-site to special dimensions that the fabricator has either taken off the drawings or specification, or else has visited the site and measured for the item to be supplied. The fabricator can then proceed to manufacture. It should be noted that a fabrication can be termed ‘prefabricated’ if it is made off site. Delivered to site ready to install means that these items can help reduce waste and time and cut emissions.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;For more information see: Prefabrication.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In theory, it is possible for fabrications to be made on site (or in a flying factory) as opposed to off site, assuming the process is simple enough (e.g timber windows) and there is enough space on site to allow the fabrication process to take place. In most circumstances however, fabricating building elements can require complex machinery that requires the controlled conditions, accuracy and space offered by a manufacturing plant.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In theory, it is possible for fabrications to be made on site (or in a flying factory) as opposed to off site, assuming the process is simple enough (e.g timber windows) and there is enough space on site to allow the fabrication process to take place. In most circumstances however, fabricating building elements can require complex machinery that requires the controlled conditions, accuracy and space offered by a manufacturing plant.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 25:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 27:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* The overlooked secret of off-site fabrication.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* The overlooked secret of off-site fabrication.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Theory]] [[Category:Construction_techniques]] [[Category:Design]] [[Category:Products_/_components]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Theory]] [[Category:Construction_techniques]] [[Category:Design]] [[Category:Products_/_components&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;]] [[Category:DCN_Product_Knowledge&lt;/ins&gt;]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Fabrication&amp;diff=137335&amp;oldid=prev</id>
		<title>Designing Buildings at 09:47, 13 June 2019</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Fabrication&amp;diff=137335&amp;oldid=prev"/>
				<updated>2019-06-13T09:47:35Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 09:47, 13 June 2019&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 3:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 3:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;|}&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;|}&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In construction, a ‘fabrication’ is an item that is manufactured by a fabricator for installation on a building site as part of an ongoing construction project&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;. It is usually an item such as an aluminium &lt;/del&gt;window, &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;glass &lt;/del&gt;door, steel member &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;or stair element &lt;/del&gt;that is &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;usually &lt;/del&gt;made off-site &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;and to a specific set of dimensions that are unique &lt;/del&gt;to the project.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In construction, a ‘fabrication’ is an item that is manufactured by a fabricator for installation on a building site as part of an ongoing construction project&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;, for example, a &lt;/ins&gt;window, door, steel member&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;, staircase and so on &lt;/ins&gt;that is &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;typically &lt;/ins&gt;made off-site to &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;the specification required for &lt;/ins&gt;the project.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;A building’s windows are normally fabricated off-site to special dimensions that the fabricator has either taken off the drawings or specification, or else has visited the site and measured for the item to be supplied. The fabricator can then proceed to manufacture. It should be noted that a fabrication can be termed ‘prefabricated’ if it is made off site. Delivered to site ready to install means that these items help reduce waste and cut emissions.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;A building’s windows are normally fabricated off-site to special dimensions that the fabricator has either taken off the drawings or specification, or else has visited the site and measured for the item to be supplied. The fabricator can then proceed to manufacture. It should be noted that a fabrication can be termed ‘prefabricated’ if it is made off site. Delivered to site ready to install means that these items &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;can &lt;/ins&gt;help reduce waste &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;and time &lt;/ins&gt;and cut emissions.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In theory, it is possible for fabrications to be made on site as opposed to off site, assuming the process is simple enough (e.g timber windows) and there is enough space on site to allow the fabrication process to take place. In most circumstances however, fabricating building elements can require complex machinery that requires the controlled conditions, accuracy and space offered by a manufacturing plant.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In theory, it is possible for fabrications to be made on site &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;(or in a flying factory) &lt;/ins&gt;as opposed to off site, assuming the process is simple enough (e.g timber windows) and there is enough space on site to allow the fabrication process to take place. In most circumstances however, fabricating building elements can require complex machinery that requires the controlled conditions, accuracy and space offered by a manufacturing plant.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Related articles on Designing Buildings Wiki =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Related articles on Designing Buildings Wiki =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Fabrication&amp;diff=136536&amp;oldid=prev</id>
		<title>Editor at 14:32, 3 June 2019</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Fabrication&amp;diff=136536&amp;oldid=prev"/>
				<updated>2019-06-03T14:32:07Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 14:32, 3 June 2019&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;{|&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;{|&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;| [[File:&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;ATawards timber 290&lt;/del&gt;.jpg]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;| [[File:&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;ATawards_timber_290.jpg|link=File:ATawards_timber_290&lt;/ins&gt;.jpg]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;|}&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;|}&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In construction, a ‘fabrication’ is an item that is manufactured by a fabricator for installation on a building site as part of an ongoing construction project. It is usually an item such as an aluminium window, glass door, steel member or stair element that is usually made off-site and to a specific set of dimensions that are unique to the project.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In construction, a ‘fabrication’ is an item that is manufactured by a fabricator for installation on a building site as part of an ongoing construction project. It is usually an item such as an aluminium window, glass door, steel member or stair element that is usually made off-site and to a specific set of dimensions that are unique to the project.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;A building’s windows are normally fabricated off-site to special dimensions that the fabricator has either taken off the drawings or specification, or else has visited the site and measured for the item to be supplied. The fabricator can then proceed to manufacture. It should be noted that a fabrication can be termed ‘prefabricated’ if it is made off site.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;A building’s windows are normally fabricated off-site to special dimensions that the fabricator has either taken off the drawings or specification, or else has visited the site and measured for the item to be supplied. The fabricator can then proceed to manufacture. It should be noted that a fabrication can be termed ‘prefabricated’ if it is made off site&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;. Delivered to site ready to install means that these items help reduce waste and cut emissions&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In theory, it is possible for fabrications to be made on site as opposed to off site, assuming the process is simple enough (e.g timber windows) and there is enough space on site to allow the fabrication process to take place. In most circumstances however, fabricating building elements can require complex machinery that requires the controlled conditions, accuracy and space offered by a manufacturing plant.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In theory, it is possible for fabrications to be made on site as opposed to off site, assuming the process is simple enough (e.g timber windows) and there is enough space on site to allow the fabrication process to take place. In most circumstances however, fabricating building elements can require complex machinery that requires the controlled conditions, accuracy and space offered by a manufacturing plant.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Editor</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Fabrication&amp;diff=136531&amp;oldid=prev</id>
		<title>Editor at 14:28, 3 June 2019</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Fabrication&amp;diff=136531&amp;oldid=prev"/>
				<updated>2019-06-03T14:28:47Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 14:28, 3 June 2019&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;{|&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;| [[File:ATawards timber 290.jpg]]&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;|}&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In construction, a ‘fabrication’ is an item that is manufactured by a fabricator for installation on a building site as part of an ongoing construction project. It is usually an item such as an aluminium window, glass door, steel member or stair element that is usually made off-site and to a specific set of dimensions that are unique to the project.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In construction, a ‘fabrication’ is an item that is manufactured by a fabricator for installation on a building site as part of an ongoing construction project. It is usually an item such as an aluminium window, glass door, steel member or stair element that is usually made off-site and to a specific set of dimensions that are unique to the project.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Editor</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Fabrication&amp;diff=136530&amp;oldid=prev</id>
		<title>Editor: Created page with &quot;In construction, a ‘fabrication’ is an item that is manufactured by a fabricator for installation on a building site as part of an ongoing construction project. It is usually...&quot;</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Fabrication&amp;diff=136530&amp;oldid=prev"/>
				<updated>2019-06-03T14:27:57Z</updated>
		
		<summary type="html">&lt;p&gt;Created page with &amp;quot;In construction, a ‘fabrication’ is an item that is manufactured by a fabricator for installation on a building site as part of an ongoing construction project. It is usually...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;In construction, a ‘fabrication’ is an item that is manufactured by a fabricator for installation on a building site as part of an ongoing construction project. It is usually an item such as an aluminium window, glass door, steel member or stair element that is usually made off-site and to a specific set of dimensions that are unique to the project.&lt;br /&gt;
&lt;br /&gt;
A building’s windows are normally fabricated off-site to special dimensions that the fabricator has either taken off the drawings or specification, or else has visited the site and measured for the item to be supplied. The fabricator can then proceed to manufacture. It should be noted that a fabrication can be termed ‘prefabricated’ if it is made off site.&lt;br /&gt;
&lt;br /&gt;
In theory, it is possible for fabrications to be made on site as opposed to off site, assuming the process is simple enough (e.g timber windows) and there is enough space on site to allow the fabrication process to take place. In most circumstances however, fabricating building elements can require complex machinery that requires the controlled conditions, accuracy and space offered by a manufacturing plant.&lt;br /&gt;
&lt;br /&gt;
= Related articles on Designing Buildings Wiki =&lt;br /&gt;
&lt;br /&gt;
* Concrete frame.&lt;br /&gt;
* Construction problems avoided by using a modular approach.&lt;br /&gt;
* Crosswall construction.&lt;br /&gt;
* Design for Manufacture and Assembly (DfMA).&lt;br /&gt;
* Modular buildings.&lt;br /&gt;
* Offsite manufacturing.&lt;br /&gt;
* Off-site construction.&lt;br /&gt;
* Off site, on track.&lt;br /&gt;
* Prefabrication.&lt;br /&gt;
* Stainless steel.&lt;br /&gt;
* Steel frame.&lt;br /&gt;
* Structure relocation.&lt;br /&gt;
* The overlooked secret of off-site fabrication.&lt;br /&gt;
&lt;br /&gt;
[[Category:Theory]] [[Category:Construction_techniques]] [[Category:Design]] [[Category:Products_/_components]]&lt;/div&gt;</summary>
		<author><name>Editor</name></author>	</entry>

	</feed>