		<title>Completion - Revision history</title>
		<link rel="self" type="application/atom+xml" href="https://www.designingbuildings.co.uk/w/index.php?action=history&amp;feed=atom&amp;title=Completion"/>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Completion&amp;action=history"/>
		<updated>2026-05-03T17:08:42Z</updated>
		<subtitle>Revision history for this page on the wiki</subtitle>
		<generator>MediaWiki 1.17.4</generator>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Completion&amp;diff=219794&amp;oldid=prev</id>
		<title>Designing Buildings at 08:55, 8 December 2021</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Completion&amp;diff=219794&amp;oldid=prev"/>
				<updated>2021-12-08T08:55:48Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 08:55, 8 December 2021&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 27:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 27:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Under other commercial contracts (i.e. those that relate to goods and services), the contract performance is not considered 'complete' until the obligations imposed by the contract have been fulfilled.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Under other commercial contracts (i.e. those that relate to goods and services), the contract performance is not considered 'complete' until the obligations imposed by the contract have been fulfilled.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Related articles on Designing Buildings &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Wiki &lt;/del&gt;=&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;See also: Failure to complete construction works.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Related articles on Designing Buildings =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Building completion.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Building completion.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 34:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 36:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Difference between practical completion and partial possession.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Difference between practical completion and partial possession.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Early use.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Early use.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;* Failure to complete construction works.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Handover to client.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Handover to client.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Partial possession.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Partial possession.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Completion&amp;diff=175274&amp;oldid=prev</id>
		<title>Designing Buildings at 09:41, 24 September 2020</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Completion&amp;diff=175274&amp;oldid=prev"/>
				<updated>2020-09-24T09:41:50Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 09:41, 24 September 2020&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 42:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 42:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Work-to-complete list.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Work-to-complete list.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Construction_management]] [[Category:Contracts_/_payment]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;[[Category:DCN_Definition]] [[Category:DCN_Guidance]] &lt;/ins&gt;[[Category:Construction_management]] [[Category:Contracts_/_payment&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;]] [[Category:Disambiguation&lt;/ins&gt;]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Completion&amp;diff=124486&amp;oldid=prev</id>
		<title>Designing Buildings at 12:25, 14 January 2019</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Completion&amp;diff=124486&amp;oldid=prev"/>
				<updated>2019-01-14T12:25:10Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 12:25, 14 January 2019&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 27:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 27:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Under other commercial contracts (i.e. those that relate to goods and services), the contract performance is not considered 'complete' until the obligations imposed by the contract have been fulfilled.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Under other commercial contracts (i.e. those that relate to goods and services), the contract performance is not considered 'complete' until the obligations imposed by the contract have been fulfilled.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;= Find out more =&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Related articles on Designing Buildings Wiki =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;==&lt;/del&gt;= Related articles on Designing Buildings Wiki &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;==&lt;/del&gt;=&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;* Building completion.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Certificate of non completion.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Certificate of non completion.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Completion date.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Completion date.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Completion&amp;diff=112079&amp;oldid=prev</id>
		<title>Editor at 16:57, 23 July 2018</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Completion&amp;diff=112079&amp;oldid=prev"/>
				<updated>2018-07-23T16:57:26Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 16:57, 23 July 2018&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 39:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 39:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Practical completion.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Practical completion.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Sectional completion.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Sectional completion.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;* Substantial completion.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Topping out.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Topping out.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Work-to-complete list.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Work-to-complete list.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Construction_management]] [[Category:Contracts_/_payment]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Construction_management]] [[Category:Contracts_/_payment]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;!-- diff cache key designingbuildings:diff:version:1.11a:oldid:102275:newid:112079 --&gt;
&lt;/table&gt;</summary>
		<author><name>Editor</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Completion&amp;diff=102275&amp;oldid=prev</id>
		<title>Editor at 13:01, 23 March 2018</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Completion&amp;diff=102275&amp;oldid=prev"/>
				<updated>2018-03-23T13:01:47Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 13:01, 23 March 2018&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 19:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 19:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In effect, this marks the completion of the works. There may still be latent defects, which do not appear for some time, however, the building owner no longer has a contractual right to insist that the contractor rectifies any defects, and they must instead seek redress in an action for damages, for breach of contract, or for negligence. In the case of dwellings there is a statutory remedy provided by the Defective Premises Act 1972.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In effect, this marks the completion of the works. There may still be latent defects, which do not appear for some time, however, the building owner no longer has a contractual right to insist that the contractor rectifies any defects, and they must instead seek redress in an action for damages, for breach of contract, or for negligence. In the case of dwellings there is a statutory remedy provided by the Defective Premises Act 1972.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;NB Sectional completion refers to a provision within construction contracts allowing different completion dates for different sections of the works. This is common on large projects that are completed in sections, allowing the client to take possession of the completed parts whilst construction continues on others. See Sectional completion for more information.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;NB&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;: &lt;/ins&gt;Sectional completion refers to a provision within construction contracts allowing different completion dates for different sections of the works. This is common on large projects that are completed in sections, allowing the client to take possession of the completed parts whilst construction continues on others. See Sectional completion for more information.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Partial possession clauses may permit the client or tenants to take possession of part of a building or site, even if the works are ongoing or there are defects that have not been rectified. See Partial possession for more information.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Partial possession clauses may permit the client or tenants to take possession of part of a building or site, even if the works are ongoing or there are defects that have not been rectified. See Partial possession for more information.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 34:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 34:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Completion date.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Completion date.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Difference between practical completion and partial possession.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Difference between practical completion and partial possession.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;* Early use.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Handover to client.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Handover to client.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Partial possession.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Partial possession.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Editor</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Completion&amp;diff=95897&amp;oldid=prev</id>
		<title>Designing Buildings at 15:06, 16 January 2018</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Completion&amp;diff=95897&amp;oldid=prev"/>
				<updated>2018-01-16T15:06:37Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 15:06, 16 January 2018&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 9:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 9:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Construction works =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Construction works =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;However, in &lt;/del&gt;relation to construction, the situation is considerably more complex as 'completion' is generally not a single event but takes place in stages&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;. This is because of the difficulty of ensuring that all the works described in the contract documents have been carried out as specified&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;In &lt;/ins&gt;relation to construction, the situation is considerably more complex as 'completion' is generally not a single event&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;, &lt;/ins&gt;but takes place in stages.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Most construction contracts will set a date by which the works described in the contract must be completed. However, this is not the date by which all obligations under the contract have to be discharged, but only the date by which 'practical completion' must be certified.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Most construction contracts will set a date by which the works described in the contract must be completed. However, this is not the date by which all obligations under the contract have to be discharged, but only the date by which 'practical completion' must be certified.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Again, there &lt;/del&gt;is no absolute definition of practical completion, but very broadly, practical completion is deemed to have occurred when all the construction works that are described in the contract have been carried out, and the contract administrator issues a certificate of practical completion. For more information see: Practical completion.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;There &lt;/ins&gt;is no absolute definition of practical completion, but very broadly, practical completion is deemed to have occurred when all the construction works that are described in the contract have been carried out, and the contract administrator issues a certificate of practical completion. For more information see: Practical completion.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;There &lt;/del&gt;is &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;then &lt;/del&gt;a defects liability period during which the contractor may be recalled to rectify defects which appear &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;following practical completion&lt;/del&gt;. At the end of the defects liability period, the contract administrator prepares a schedule of defects, listing those defects that have not yet been rectified, and agrees with the contractor the date by which they will be rectified. When the contract administrator considers all the items on the schedule of defects have been rectified, they issue a certificate of making good defects.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;This &lt;/ins&gt;is &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;followed by &lt;/ins&gt;a defects liability period during which the contractor may be recalled to rectify defects which appear. At the end of the defects liability period, the contract administrator prepares a schedule of defects, listing those defects that have not yet been rectified, and agrees with the contractor the date by which they will be rectified. When the contract administrator considers all the items on the schedule of defects have been rectified, they issue a certificate of making good defects.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In effect, this marks the completion of the works. There may still be latent defects, which do not appear for some time, however, the building owner no longer has a contractual right to insist that the contractor rectifies any defects, and they must instead seek redress in an action for damages, for breach of contract, or for negligence. In the case of dwellings there is a statutory remedy provided by the Defective Premises Act 1972.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In effect, this marks the completion of the works. There may still be latent defects, which do not appear for some time, however, the building owner no longer has a contractual right to insist that the contractor rectifies any defects, and they must instead seek redress in an action for damages, for breach of contract, or for negligence. In the case of dwellings there is a statutory remedy provided by the Defective Premises Act 1972.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Sectional completion refers to a provision within construction contracts allowing different completion dates for different sections of the works. This is common on large projects that are completed in sections, allowing the client to take possession of the completed parts whilst construction continues on others. See Sectional completion for more information.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;NB &lt;/ins&gt;Sectional completion refers to a provision within construction contracts allowing different completion dates for different sections of the works. This is common on large projects that are completed in sections, allowing the client to take possession of the completed parts whilst construction continues on others. See Sectional completion for more information.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Partial possession clauses may permit the client or tenants to take possession of part of a building or site, even if the works are ongoing or there are defects that have not been rectified. See Partial possession for more information.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Partial possession clauses may permit the client or tenants to take possession of part of a building or site, even if the works are ongoing or there are defects that have not been rectified. See Partial possession for more information.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Completion&amp;diff=95896&amp;oldid=prev</id>
		<title>Designing Buildings at 15:04, 16 January 2018</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Completion&amp;diff=95896&amp;oldid=prev"/>
				<updated>2018-01-16T15:04:02Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 15:04, 16 January 2018&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The term ‘completion’ is often used in the context of buildings and construction projects, but there is no precise legal definition.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;= Introduction =&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;The term ‘completion’ is often used in the context of buildings and construction projects, but there is no precise legal definition&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;, and its meaning is dependent on the situation in which it is being used&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;= Property sales =&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In the context of property, completion is the point at which the price of the property is paid and transfer documents are dated, thereby completing the final step in the legal process of transferring the ownership of property.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;In the context of property, completion is the point at which the price of the property is paid and transfer documents are dated, thereby completing the final step in the legal process of transferring the ownership of property.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;When &lt;/del&gt;all the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;construction &lt;/del&gt;works &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;that are &lt;/del&gt;described in the contract have been carried out&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;, and are certified by the contract administrator, ‘practical completion’ has been achieved&lt;/del&gt;. Most construction contracts set a date by which the works described in the contract must be completed. &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;This &lt;/del&gt;is not the date by which all obligations under the contract have to be discharged, but the date by which 'practical completion' must be certified.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;= Construction works =&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;However, in relation to construction, the situation is considerably more complex as 'completion' is generally not a single event but takes place in stages. This is because of the difficulty of ensuring that &lt;/ins&gt;all the works described in the contract &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;documents &lt;/ins&gt;have been carried out &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;as specified&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;Most construction contracts &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;will &lt;/ins&gt;set a date by which the works described in the contract must be completed. &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;However, this &lt;/ins&gt;is not the date by which all obligations under the contract have to be discharged, but &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;only &lt;/ins&gt;the date by which 'practical completion' must be certified&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Again, there is no absolute definition of practical completion, but very broadly, practical completion is deemed to have occurred when all the construction works that are described in the contract have been carried out, and the contract administrator issues a certificate of practical completion. For more information see: Practical completion.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;There is then a defects liability period during which the contractor may be recalled to rectify defects which appear following practical completion. At the end of the defects liability period, the contract administrator prepares a schedule of defects, listing those defects that have not yet been rectified, and agrees with the contractor the date by which they will be rectified. When the contract administrator considers all the items on the schedule of defects have been rectified, they issue a certificate of making good defects.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;In effect, this marks the completion of the works. There may still be latent defects, which do not appear for some time, however, the building owner no longer has a contractual right to insist that the contractor rectifies any defects, and they must instead seek redress in an action for damages, for breach of contract, or for negligence. In the case of dwellings there is a statutory remedy provided by the Defective Premises Act 1972&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;This is &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;similar under commercial contracts (i.e. those &lt;/del&gt;that &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;relate to goods and services)&lt;/del&gt;, &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;where &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;contract performance is not complete until &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;obligations imposed by the contract have been fulfilled&lt;/del&gt;. &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;This is subject to there being express provisions, such as clauses regarding sectional &lt;/del&gt;completion &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;or partial possession&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Sectional completion refers to a provision within construction contracts allowing different completion dates for different sections of the works. &lt;/ins&gt;This is &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;common on large projects &lt;/ins&gt;that &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;are completed in sections&lt;/ins&gt;, &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;allowing &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;client to take possession of &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;completed parts whilst construction continues on others&lt;/ins&gt;. &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;See Sectional &lt;/ins&gt;completion &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;for more information&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;The completion &lt;/del&gt;of &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;construction projects is generally not &lt;/del&gt;a &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;single event but takes place in stages. This is necessary to ensure that all &lt;/del&gt;the works &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;described in the contract documents have been carried out as specified, that all appropriate payments have been made, that &lt;/del&gt;there are &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;no &lt;/del&gt;defects &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;and &lt;/del&gt;that &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;an appropriate handover has taken place&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Partial possession clauses may permit the client or tenants to take possession of part &lt;/ins&gt;of a &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;building or site, even if &lt;/ins&gt;the works &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;are ongoing or &lt;/ins&gt;there are defects that &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;have not been rectified. See Partial possession for more information&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Sectional completion refers to a provision within construction &lt;/del&gt;contracts &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;allowing different completion dates for different sections of the works. This is common on large projects that are completed in sections, allowing the client to take possession of the completed parts whilst construction continues on others.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;= Other commercial &lt;/ins&gt;contracts &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;=&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Claims of unfairness can arise if there are perceived &lt;/del&gt;to &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;be criteria for completion which are overly onerous&lt;/del&gt;, &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;such as minor remedial works which do &lt;/del&gt;not &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;prevent occupation but nonetheless expose &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;contractor to liabilities for liquidated damages&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Under other commercial contracts (i.e. those that relate &lt;/ins&gt;to &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;goods and services)&lt;/ins&gt;, &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;the contract performance is &lt;/ins&gt;not &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;considered 'complete' until &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;obligations imposed by the contract have been fulfilled&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Find out more =&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Find out more =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Completion&amp;diff=94716&amp;oldid=prev</id>
		<title>Editor: Created page with &quot;The term ‘completion’ is often used in the context of buildings and construction projects, but there is no precise legal definition.  In the context of property, completion i...&quot;</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Completion&amp;diff=94716&amp;oldid=prev"/>
				<updated>2018-01-05T11:56:33Z</updated>
		
		<summary type="html">&lt;p&gt;Created page with &amp;quot;The term ‘completion’ is often used in the context of buildings and construction projects, but there is no precise legal definition.  In the context of property, completion i...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;The term ‘completion’ is often used in the context of buildings and construction projects, but there is no precise legal definition.&lt;br /&gt;
&lt;br /&gt;
In the context of property, completion is the point at which the price of the property is paid and transfer documents are dated, thereby completing the final step in the legal process of transferring the ownership of property.&lt;br /&gt;
&lt;br /&gt;
When all the construction works that are described in the contract have been carried out, and are certified by the contract administrator, ‘practical completion’ has been achieved. Most construction contracts set a date by which the works described in the contract must be completed. This is not the date by which all obligations under the contract have to be discharged, but the date by which 'practical completion' must be certified.&lt;br /&gt;
&lt;br /&gt;
This is similar under commercial contracts (i.e. those that relate to goods and services), where the contract performance is not complete until the obligations imposed by the contract have been fulfilled. This is subject to there being express provisions, such as clauses regarding sectional completion or partial possession.&lt;br /&gt;
&lt;br /&gt;
The completion of construction projects is generally not a single event but takes place in stages. This is necessary to ensure that all the works described in the contract documents have been carried out as specified, that all appropriate payments have been made, that there are no defects and that an appropriate handover has taken place.&lt;br /&gt;
&lt;br /&gt;
Sectional completion refers to a provision within construction contracts allowing different completion dates for different sections of the works. This is common on large projects that are completed in sections, allowing the client to take possession of the completed parts whilst construction continues on others.&lt;br /&gt;
&lt;br /&gt;
Claims of unfairness can arise if there are perceived to be criteria for completion which are overly onerous, such as minor remedial works which do not prevent occupation but nonetheless expose the contractor to liabilities for liquidated damages.&lt;br /&gt;
&lt;br /&gt;
= Find out more =&lt;br /&gt;
&lt;br /&gt;
=== Related articles on Designing Buildings Wiki ===&lt;br /&gt;
&lt;br /&gt;
* Certificate of non completion.&lt;br /&gt;
* Completion date.&lt;br /&gt;
* Difference between practical completion and partial possession.&lt;br /&gt;
* Handover to client.&lt;br /&gt;
* Partial possession.&lt;br /&gt;
* Practical completion.&lt;br /&gt;
* Sectional completion.&lt;br /&gt;
* Topping out.&lt;br /&gt;
* Work-to-complete list.&lt;br /&gt;
&lt;br /&gt;
[[Category:Construction_management]] [[Category:Contracts_/_payment]]&lt;/div&gt;</summary>