<?xml version="1.0"?>
<?xml-stylesheet type="text/css" href="https://www.designingbuildings.co.uk/skins/common/feed.css?301"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
		<id>https://www.designingbuildings.co.uk/w/index.php?action=history&amp;feed=atom&amp;title=Cable_route</id>
		<title>Cable route - Revision history</title>
		<link rel="self" type="application/atom+xml" href="https://www.designingbuildings.co.uk/w/index.php?action=history&amp;feed=atom&amp;title=Cable_route"/>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Cable_route&amp;action=history"/>
		<updated>2026-05-24T17:11:00Z</updated>
		<subtitle>Revision history for this page on the wiki</subtitle>
		<generator>MediaWiki 1.17.4</generator>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=Cable_route&amp;diff=232815&amp;oldid=prev</id>
		<title>Designing Buildings: Created page with &quot;Approved document S, Infrastructure for the charging of electric vehicles, published in 2021 by HM Government, defines a cable route as: ‘A safe, unobstructed route from the po...&quot;</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=Cable_route&amp;diff=232815&amp;oldid=prev"/>
				<updated>2022-06-15T09:07:40Z</updated>
		
		<summary type="html">&lt;p&gt;Created page with &amp;quot;Approved document S, Infrastructure for the charging of electric vehicles, published in 2021 by HM Government, defines a cable route as: ‘A safe, unobstructed route from the po...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Approved document S, Infrastructure for the charging of electric vehicles, published in 2021 by HM Government, defines a cable route as: ‘A safe, unobstructed route from the power supply to the envisaged electric vehicle charge point location, for electrical cabling to be installed in the future.&lt;br /&gt;
&lt;br /&gt;
It goes on to state that: ‘In this document, cable routes are described only in the context of where electric vehicle charge points have not yet been installed. Where electric vehicle charge points have been installed, they should be considered to have adequate cable routes.’&lt;br /&gt;
&lt;br /&gt;
= Related articles on Designing Buildings =&lt;br /&gt;
&lt;br /&gt;
* Accessible parking space.&lt;br /&gt;
* Approved Document M.&lt;br /&gt;
* Approved document S.&lt;br /&gt;
* Approved documents.&lt;br /&gt;
* Associated parking space.&lt;br /&gt;
* Building regulations.&lt;br /&gt;
* Cable route.&lt;br /&gt;
* Covered car park.&lt;br /&gt;
* Electric vehicle charge point.&lt;br /&gt;
* Parking space.&lt;br /&gt;
&lt;br /&gt;
[[Category:DCN_Definition]] [[Category:Definitions]]&lt;/div&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	</feed>