<?xml version="1.0"?>
<?xml-stylesheet type="text/css" href="https://www.designingbuildings.co.uk/skins/common/feed.css?301"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
		<id>https://www.designingbuildings.co.uk/w/index.php?action=history&amp;feed=atom&amp;title=BIM_for_mechanical_electrical_and_plumbing_drawings</id>
		<title>BIM for mechanical electrical and plumbing drawings - Revision history</title>
		<link rel="self" type="application/atom+xml" href="https://www.designingbuildings.co.uk/w/index.php?action=history&amp;feed=atom&amp;title=BIM_for_mechanical_electrical_and_plumbing_drawings"/>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=BIM_for_mechanical_electrical_and_plumbing_drawings&amp;action=history"/>
		<updated>2026-04-17T17:31:56Z</updated>
		<subtitle>Revision history for this page on the wiki</subtitle>
		<generator>MediaWiki 1.17.4</generator>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=BIM_for_mechanical_electrical_and_plumbing_drawings&amp;diff=209951&amp;oldid=prev</id>
		<title>Editor at 17:06, 29 July 2021</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=BIM_for_mechanical_electrical_and_plumbing_drawings&amp;diff=209951&amp;oldid=prev"/>
				<updated>2021-07-29T17:06:44Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 17:06, 29 July 2021&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 15:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 15:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* There cane be cost savings at the end of the project because the maintenance costs throughout the lifetime of the project can be pre-calculated.[[File:BIM_for_Construction_Phase.png|link=File:BIM_for_Construction_Phase.png]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* There cane be cost savings at the end of the project because the maintenance costs throughout the lifetime of the project can be pre-calculated.[[File:BIM_for_Construction_Phase.png|link=File:BIM_for_Construction_Phase.png]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;= Find out more =&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;= Related articles on Designing Buildings Wiki =&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;==&lt;/del&gt;= Related articles on Designing Buildings Wiki &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;==&lt;/del&gt;=&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Building information modelling.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Building information modelling.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 24:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 22:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Building services.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Building services.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Mechanical electrical and plumbing.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Mechanical electrical and plumbing.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;color: red; font-weight: bold; text-decoration: none;&quot;&gt;* MEP BIM and the building lifecycle.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Virtual construction model.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Virtual construction model.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Articles_needing_more_work]] [[Category:DCN_Commentary]] [[Category:BIM]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Articles_needing_more_work]] [[Category:DCN_Commentary]] [[Category:BIM]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Editor</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=BIM_for_mechanical_electrical_and_plumbing_drawings&amp;diff=192243&amp;oldid=prev</id>
		<title>Designing Buildings at 07:30, 31 January 2021</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=BIM_for_mechanical_electrical_and_plumbing_drawings&amp;diff=192243&amp;oldid=prev"/>
				<updated>2021-01-31T07:30:36Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 07:30, 31 January 2021&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 26:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 26:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Virtual construction model.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Virtual construction model.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Articles_needing_more_work]] [[Category:BIM]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Articles_needing_more_work&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;]] [[Category:DCN_Commentary&lt;/ins&gt;]] [[Category:BIM]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=BIM_for_mechanical_electrical_and_plumbing_drawings&amp;diff=100808&amp;oldid=prev</id>
		<title>Designing Buildings at 10:28, 9 March 2018</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=BIM_for_mechanical_electrical_and_plumbing_drawings&amp;diff=100808&amp;oldid=prev"/>
				<updated>2018-03-09T10:28:47Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 10:28, 9 March 2018&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 15:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 15:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* There cane be cost savings at the end of the project because the maintenance costs throughout the lifetime of the project can be pre-calculated.[[File:BIM_for_Construction_Phase.png|link=File:BIM_for_Construction_Phase.png]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* There cane be cost savings at the end of the project because the maintenance costs throughout the lifetime of the project can be pre-calculated.[[File:BIM_for_Construction_Phase.png|link=File:BIM_for_Construction_Phase.png]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Conservation&lt;/del&gt;]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;= Find out more =&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;=== Related articles on Designing Buildings Wiki ===&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;* Building information modelling.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;* BIM articles.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;* BIM resources.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;* Building services.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;* Mechanical electrical and plumbing.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;* Virtual construction model.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Articles_needing_more_work]] [[Category:BIM&lt;/ins&gt;]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=BIM_for_mechanical_electrical_and_plumbing_drawings&amp;diff=100806&amp;oldid=prev</id>
		<title>Designing Buildings: moved BIM for Construction phase to BIM for mechanical electrical and plumbing drawings</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=BIM_for_mechanical_electrical_and_plumbing_drawings&amp;diff=100806&amp;oldid=prev"/>
				<updated>2018-03-09T10:26:46Z</updated>
		
		<summary type="html">&lt;p&gt;moved &lt;a href=&quot;/wiki/BIM_for_Construction_phase&quot; class=&quot;mw-redirect&quot; title=&quot;BIM for Construction phase&quot;&gt;BIM for Construction phase&lt;/a&gt; to &lt;a href=&quot;/wiki/BIM_for_mechanical_electrical_and_plumbing_drawings&quot; title=&quot;BIM for mechanical electrical and plumbing drawings&quot;&gt;BIM for mechanical electrical and plumbing drawings&lt;/a&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='1' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='1' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 10:26, 9 March 2018&lt;/td&gt;
		&lt;/tr&gt;&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=BIM_for_mechanical_electrical_and_plumbing_drawings&amp;diff=100805&amp;oldid=prev</id>
		<title>Designing Buildings at 10:26, 9 March 2018</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=BIM_for_mechanical_electrical_and_plumbing_drawings&amp;diff=100805&amp;oldid=prev"/>
				<updated>2018-03-09T10:26:07Z</updated>
		
		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: white; color:black;&quot;&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
			&lt;col class='diff-marker' /&gt;
			&lt;col class='diff-content' /&gt;
		&lt;tr valign='top'&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;← Older revision&lt;/td&gt;
		&lt;td colspan='2' style=&quot;background-color: white; color:black;&quot;&gt;Revision as of 10:26, 9 March 2018&lt;/td&gt;
		&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;BIM for Construction phase&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;To help develop this article, click 'Edit this article' above.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;There is a massive waste of time &lt;/del&gt;and money &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;generated because the &lt;/del&gt;projects &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;always &lt;/del&gt;go over the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;stipulated financial plan &lt;/del&gt;or &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;deadline&lt;/del&gt;. This &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;often &lt;/del&gt;happens because, the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;drawing sets &lt;/del&gt;produced preceding &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;the &lt;/del&gt;construction &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;procedure end up being &lt;/del&gt;extensively different from the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;As&lt;/del&gt;-&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Fitted &lt;/del&gt;drawings. This &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;especially &lt;/del&gt;happens in case of 3D (&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;M&amp;amp;amp;E) &lt;/del&gt;MEP &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;coordinated &lt;/del&gt;drawings. &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;This is where a BIM approach can assist the construction phase:&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;-----&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Time &lt;/ins&gt;and money &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;can be wasted when &lt;/ins&gt;projects go over the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;budget &lt;/ins&gt;or &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;programme&lt;/ins&gt;. This &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;sometimes &lt;/ins&gt;happens because, the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;drawings &lt;/ins&gt;produced preceding construction &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;are &lt;/ins&gt;extensively different from the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;as&lt;/ins&gt;-&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;constructed &lt;/ins&gt;drawings. This happens in &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;particular in the &lt;/ins&gt;case of 3D &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;mechanical electrical and plumbing &lt;/ins&gt;(MEP&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;) &lt;/ins&gt;drawings.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* BIM allows for stacking of more and more details &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;atop &lt;/del&gt;the same model. In architectural BIM Modeling, insertion of MEP &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;(M&amp;amp;amp;E) &lt;/del&gt;BIM information will &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;render &lt;/del&gt;a clearer observation of the project as a whole. This leads to a clearer vision throughout the construction phase of the project.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;This is where building information modelling (BIM) can assist:&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Working in a true 3D environment decreases &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;amends on the &lt;/del&gt;drawings, once the proposed solutions are viable in the real world and go into construction.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;&amp;#160;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* The importance of BIM is understood better when it comes to 3D &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;(M&amp;amp;amp;E) &lt;/del&gt;MEP coordinated drawings, &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;because doing so on BIM is quite uncomplicated. These drawings &lt;/del&gt;allow for the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;organization &lt;/del&gt;of &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;the &lt;/del&gt;multiple services &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;involved in any building, &lt;/del&gt;HVAC, plumbing, electrical systems and other public health systems with the structural and architectural (interior finishes, facades, partitions, etc.) elements.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* BIM allows for &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;the &lt;/ins&gt;stacking of more and more details &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;in &lt;/ins&gt;the same model. In architectural BIM Modeling, insertion of MEP BIM information will &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;allow &lt;/ins&gt;a clearer observation of the project as a whole. This leads to a clearer vision throughout the construction phase of the project.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* BIM &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;modeling &lt;/del&gt;ensures that anybody can view and &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;analyze &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;models &lt;/del&gt;in 3D, be it the builders or the installation workers. In case of an inaccuracy, once the model has been corrected and updated, it is shown back to everyone. This becomes even easier when the model is saved in cloud based applications &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;like Autodesk 360, which has all the models and the documents in one place&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* Working in a true 3D environment decreases &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;revisions to &lt;/ins&gt;drawings, once the proposed solutions are viable in the real world and go into construction.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* MEP &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;(M&amp;amp;amp;E) Prefabrication Models &lt;/del&gt;and &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Drawings are churned out &lt;/del&gt;in a much easier &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;way &lt;/del&gt;and &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;a &lt;/del&gt;quicker way&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;, when worked with 3D coordinated models and it is done with much reliance&lt;/del&gt;. Then the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;models need to &lt;/del&gt;be checked for interferences and &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;are spatially coordinated &lt;/del&gt;with the help of &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Navisworks tool preceding the pre-fabrication software process&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* The importance of BIM is understood better when it comes to 3D MEP coordinated drawings, &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;which &lt;/ins&gt;allow for the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;organisation &lt;/ins&gt;of multiple services &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;such as; &lt;/ins&gt;HVAC, plumbing, electrical systems and other public health systems with the structural and architectural (interior finishes, facades, partitions, etc.) elements.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* MEP installers &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;will be able to figure out &lt;/del&gt;the services through which they can access whatever is shown in the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;MEP (M&amp;amp;amp;E) BIM model&lt;/del&gt;. Similarly, MEP installers can &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;also &lt;/del&gt;view the areas they should keep the services out of, to reduce fire risks or allow future access or permit future construction phases to be executed.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* BIM ensures that anybody can view and &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;analyse &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;design &lt;/ins&gt;in 3D, be it the builders or the installation workers. In case of an inaccuracy, once the model has been corrected and updated, it is shown back to everyone. This becomes even easier when the model is saved in cloud based applications.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* During the completion of the construction and the installation phase, &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;the client and the architecture team &lt;/del&gt;can &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;make assessment between the unique drawings and the As fitted drawings and if necessary, the changes are &lt;/del&gt;made &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;in &lt;/del&gt;the BIM model &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;too from the beginning&lt;/del&gt;; so &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;usually &lt;/del&gt;there is not much difference &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;amid &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;materialized &lt;/del&gt;project and the one &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;modeled&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* MEP &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;prefabrication models &lt;/ins&gt;and &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;drawings can be generated &lt;/ins&gt;in a much easier &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;more reliable &lt;/ins&gt;and quicker way. Then the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;model can &lt;/ins&gt;be checked for interferences and &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;spatial coordination &lt;/ins&gt;with the help of &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;clash avoidance and clash detection tools&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;minus;&lt;/td&gt;&lt;td style=&quot;background: #ffa; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* There &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;is also a momentous [http://www.teslaoutsourcingservices.com/ &lt;/del&gt;cost savings at the end of the project&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;] &lt;/del&gt;because &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;by means of BIM modeling, &lt;/del&gt;the maintenance costs throughout the lifetime of the project &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;is &lt;/del&gt;pre-calculated &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;and considered and measured&lt;/del&gt;.[[File:&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;BIM for Construction Phase&lt;/del&gt;.png]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* MEP installers &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;can determine &lt;/ins&gt;the services through which they can access whatever is shown in the. Similarly, MEP installers can view the areas they should keep the services out of, to reduce fire risks or allow future access or permit future construction phases to be executed.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* During the completion of the construction and the installation phase, &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;changes &lt;/ins&gt;can &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;be &lt;/ins&gt;made &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;to &lt;/ins&gt;the BIM model; so there is not much difference &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;between &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;completed &lt;/ins&gt;project and the one &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;modelled&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;* There &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;cane be &lt;/ins&gt;cost savings at the end of the project because the maintenance costs throughout the lifetime of the project &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;can be &lt;/ins&gt;pre-calculated.[[File:&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;BIM_for_Construction_Phase.png|link=File:BIM_for_Construction_Phase&lt;/ins&gt;.png]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Conservation]]&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;&amp;#160;&lt;/td&gt;&lt;td style=&quot;background: #eee; color:black; font-size: smaller;&quot;&gt;&lt;div&gt;[[Category:Conservation]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Designing Buildings</name></author>	</entry>

	<entry>
		<id>https://www.designingbuildings.co.uk/w/index.php?title=BIM_for_mechanical_electrical_and_plumbing_drawings&amp;diff=97436&amp;oldid=prev</id>
		<title>Vincy Joseph: Created page with &quot;BIM for Construction phase  There is a massive waste of time and money generated because the projects always go over the stipulated financial plan or deadline. This often happens...&quot;</title>
		<link rel="alternate" type="text/html" href="https://www.designingbuildings.co.uk/w/index.php?title=BIM_for_mechanical_electrical_and_plumbing_drawings&amp;diff=97436&amp;oldid=prev"/>
				<updated>2018-02-03T07:31:10Z</updated>
		
		<summary type="html">&lt;p&gt;Created page with &amp;quot;BIM for Construction phase  There is a massive waste of time and money generated because the projects always go over the stipulated financial plan or deadline. This often happens...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;BIM for Construction phase&lt;br /&gt;
&lt;br /&gt;
There is a massive waste of time and money generated because the projects always go over the stipulated financial plan or deadline. This often happens because, the drawing sets produced preceding the construction procedure end up being extensively different from the As-Fitted drawings. This especially happens in case of 3D (M&amp;amp;amp;E) MEP coordinated drawings. This is where a BIM approach can assist the construction phase:&lt;br /&gt;
&lt;br /&gt;
* BIM allows for stacking of more and more details atop the same model. In architectural BIM Modeling, insertion of MEP (M&amp;amp;amp;E) BIM information will render a clearer observation of the project as a whole. This leads to a clearer vision throughout the construction phase of the project.&lt;br /&gt;
* Working in a true 3D environment decreases amends on the drawings, once the proposed solutions are viable in the real world and go into construction.&lt;br /&gt;
* The importance of BIM is understood better when it comes to 3D (M&amp;amp;amp;E) MEP coordinated drawings, because doing so on BIM is quite uncomplicated. These drawings allow for the organization of the multiple services involved in any building, HVAC, plumbing, electrical systems and other public health systems with the structural and architectural (interior finishes, facades, partitions, etc.) elements.&lt;br /&gt;
* BIM modeling ensures that anybody can view and analyze the models in 3D, be it the builders or the installation workers. In case of an inaccuracy, once the model has been corrected and updated, it is shown back to everyone. This becomes even easier when the model is saved in cloud based applications like Autodesk 360, which has all the models and the documents in one place.&lt;br /&gt;
* MEP (M&amp;amp;amp;E) Prefabrication Models and Drawings are churned out in a much easier way and a quicker way, when worked with 3D coordinated models and it is done with much reliance. Then the models need to be checked for interferences and are spatially coordinated with the help of Navisworks tool preceding the pre-fabrication software process.&lt;br /&gt;
* MEP installers will be able to figure out the services through which they can access whatever is shown in the MEP (M&amp;amp;amp;E) BIM model. Similarly, MEP installers can also view the areas they should keep the services out of, to reduce fire risks or allow future access or permit future construction phases to be executed.&lt;br /&gt;
* During the completion of the construction and the installation phase, the client and the architecture team can make assessment between the unique drawings and the As fitted drawings and if necessary, the changes are made in the BIM model too from the beginning; so usually there is not much difference amid the materialized project and the one modeled.&lt;br /&gt;
* There is also a momentous [http://www.teslaoutsourcingservices.com/ cost savings at the end of the project] because by means of BIM modeling, the maintenance costs throughout the lifetime of the project is pre-calculated and considered and measured.[[File:BIM for Construction Phase.png]]&lt;br /&gt;
&lt;br /&gt;
[[Category:Conservation]]&lt;/div&gt;</summary>
		<author><name>Vincy Joseph</name></author>	</entry>

	</feed>