Management contract: outline work plan
An outline work plan for a project following a management contract procurement route is presented below. Project plans for other procurement routes are available by clicking here.
Clicking on any of the stages will open up the detailed tasks necessary to complete that stage. Together the tasks represent a single, consolidated project plan from the first moment it becomes apparent a project might be required right through to post occupation evaluation.
See also: Management contracting - pros and cons.
[edit] Management contract
Stage 1: Business justification.
Stage 2: Feasibility studies.
Stage 3: Project brief.
Stage 4: Concept design.
Stage 5: Appointing the management contractor.
Stage 6: Detailed design.
Stage 7: Production information.
Stage 8: Tender works contracts.
Stage 9: Mobilisation.
Stage 10: Construction.
Stage 11: Occupation and defects liability period.
Stage 12: Post occupation evaluation.
Moveable stages:
Featured articles and news
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding.
Types of rapidly renewable content
From forestry to agricultural crops and their by-products.
Terraced houses and the public realm
The discernible difference between the public realm of detached housing and of terraced housing.
Put digitalisation and sustainability at the core of curricula
Project management educators are urged.
Looking back at the influence of climate events
From a designer and writer: 'There are limits to growth but no limits to development'.
Terms, histories, theories and practice.
Biophilic design and natural light
Letting in the light and natural elements into spaces.
APM Programme Management Conference 2024
Strategies for Success.
Residential takes the reins as contract awards even out
Contracts down, but remain above the last quarter of 2023.
Celebrating Eid and the largest mud-brick building.
Barry Kingscote claims prestigious CIOB CMYA Award.
The British Mosque: an architectural and social history
The story of some 1,500 mosques or more in Britain.
Heat pump refrigerants, efficiencies and impacts
R12 to R1270 what are the differences?
Global heat pump market in 2023
Challenging times with positive but modest outlook.
Beyond the infrastructure pipeline
Opportunities and chokepoints.
Comments
What is a client coordinated approach to major project and what are key elements to consider? Any contribution to this,please.
Have a look at this and related articles: https://www.designingbuildings.co.uk/wiki/Major_project_definition