Atlantis, The Palm is a five-star ocean-themed resort hotel on the apex of the man-made Palm Island’s crescent, Dubai, UAE. The building was the first to be built on the island and is based around the myth of Atlantis, as depicted in the works of Plato. The main building has two central towers, referred to as East and West, joined together by the Royal Bridge Suite.
The 46 hectare resort comprises 1,539 rooms, 23 restaurants, luxury boutiques, and a 17 hectare nautical-themed water park and tropical gardens containing more than 250,000 plants and trees. A key feature of the water park is the Leap of Faith slide; a 60 ft drop at an 86-degree angle from the top of a replica Mayan temple. It propels riders through a clear acrylic tunnel submerged in a shark-filled lagoon.
The resort includes one of the largest open-air marine habitats in the world, containing approximately 65,000 marine animals in lagoons and other displays. Three-storey underwater suites allow guests to literally ‘sleep with the fishes’.
Atlantis was developed as a joint venture between Kerzner International Holdings Ltd. and Istithmar, and officially opened in September 2008. The construction cost was reported to be US$1.5 bn. In April 2012, Istithmar acquired Kerzner’s 50% stake in the property for US$ 250m. The property continues to be managed by Kerzner International Resorts.
Atlantis has become a landmark tourist attraction and an iconic symbol of Dubai’s place on the world-stage.
[edit] Design and construction
Atlantis was designed by Wimberly, Tong and Goo, an international firm specialising in luxury hotel complexes.
The design incorporates classical Arabian architecture in both the interior and exterior of the 23-storey hotel, with semi-precious stones, intricate fossilised shells and 'fish' stones included throughout. A 10 m-high glass sculpture by artist Dale Chihuly contains more than 3,000 pieces of intensely-coloured blown glass ranging from fiery oranges and reds to tranquil blues and greens, surrounded by a reflection pool. The hotel lobby's 19 m-high arched ceilings feature 8 hand-painted murals by Spanish artist Albino Gonzalez.
The contractor, Laing O’Rourke, developed the hotel envelope using a modular precast glass-fibre/reinforced concrete façade, which was installed by their in-house specialists Emirates Precast. They also developed a pioneering facility to pre assemble modular bathroom ‘pods’ in a controlled factory environment. 1,500 pods were delivered direct to the site and installed at a rate of 38 per week.
The logistical operation to facilitate the build of the intricate design presented challenges. A highly complex operation was set up involving road deliveries, handling and distribution, temporary utilities, communication systems, traffic management and an enormous amount of on-site labour. At its peak, a workforce of 10,000 were employed, working 2 million hours a month.
It was completed 2 months ahead of schedule.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Building of the week series.
- Burj al Arab, Dubai.
- Luxor Las Vegas.
- MahaNakhon, Bangkok.
- Petronas Twin Towers.
- Ryugyong Hotel, North Korea.
- Shanghai Tower.
- Taipei 101.
- Top 10 skyscrapers located in the UAE.
- Top Architectural Wonders of Dubai.
- Unusual building design of the week.
[edit] External resources
- Atlantis, The Palm - Official site
- Laing O'Rourke - Atlantis
Featured articles and news
Not buildings. Happy holiday from DB.
Future Homes Standard: Industry calls for more ambition
As the Government FHS consultation finally closes.
Improving government projects with data and AI
Enabling better outcomes, efficient modern delivery and influential leadership on government projects.
BSRIA Living Laboratory Innovation Challenge
Final days for submission, closing March 29.
Windows, their frames, forms, factors and functions.
The hidden subtleties of U-Value calculations
Different contexts and what to include as variables.
A brief run down with related articles.
Electrical sector calls for safer public EV charge points
Serious concerns about electrical safety in the public domain.
Building Blocks manifesto presented to parliament
Architects Declare call in for support of five critical policies.
The four elements of project management with APM
Analysis, expectations, collaborative communication and partnerships.
City of London launches Heritage Building Retrofit Toolkit
Empowering owners to initiate necessary adaptations.
Guidance on RAAC in listed buildings
Published by Purcell, endorsed by IHBC, SPAB and C20.
Learning from the past.
Reluctance to hire people with criminal convictions revealed
Employing People with Criminal Convictions Report.
Tackling unconscious bias; Women's History Month
Personal reflections, as the last week of March approaches.