Engineering procurement and construction contract
Engineering, procurement, and construction (EPC) contracts, sometimes called turnkey contracts are similar to design and build contracts, in that there is a single contract for the design and construction of the project, but generally with an EPC contract, the client has less say over the design of the project and the contractor takes more risk.
On a design and build project, the client may produce an outline design upon which tenders are sought. On an EPC project, the client may seek tenders based on a performance specification and then have no input into the design, other than if variations are instructed.
Payment can be on a lump sum, cost reimbursable basis, or some other basis, but generally the client would be likely to seek a fixed price, lump sum agreement where the responsibility for cost control is taken by the contractor. This gives the client a relatively risk-free arrangement, with one point of responsibility and cost certainty. They can therefore operate the contract with the minimum resource.
The clients main risk lies in the definition of the specification upon which the contract is based. If the specification is not well developed and concise otherwise the quality and performance of the completed development may be compromised (see performance specification and output-based specification for more information)
Generally, EPC contracts are used on engineering and infrastructure projects, or industrial projects, where the aesthetics of design might be considered less important to the client than performance and cost certainty.
The FIDIC Conditions of Contract for EPC Turnkey Projects (The Silver Book) is an example of an engineering procurement and construction contract.
[edit] Related articles on Designing Buildings
- Construction contract.
- Contract conditions.
- EPCM contract.
- FIDIC.
- Output-based specification.
- Performance specification.
- Procurement route.
- Procurement team.
- Reliance data in EPC contracts.
- What is an EPC contract?
[edit] External references
- Skills Funding Agency: Procurement routes.
- CABE: Procurement routes.
- PACE Guidance on the Appointment of Contractors and Consultants for a detailed analysis of the pros and cons of various procurement routes.
- nbs: National Construction Contracts and Law Survey 2012.
Featured articles and news
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding.
Types of rapidly renewable content
From forestry to agricultural crops and their by-products.
Terraced houses and the public realm
The discernible difference between the public realm of detached housing and of terraced housing.
Put digitalisation and sustainability at the core of curricula
Project management educators are urged.
Looking back at the influence of climate events
From a designer and writer: 'There are limits to growth but no limits to development'.
Terms, histories, theories and practice.
Biophilic design and natural light
Letting in the light and natural elements into spaces.
APM Programme Management Conference 2024
Strategies for Success.
Residential takes the reins as contract awards even out
Contracts down, but remain above the last quarter of 2023.
Celebrating Eid and the largest mud-brick building.
Barry Kingscote claims prestigious CIOB CMYA Award.
The British Mosque: an architectural and social history
The story of some 1,500 mosques or more in Britain.
Heat pump refrigerants, efficiencies and impacts
R12 to R1270 what are the differences?
Global heat pump market in 2023
Challenging times with positive but modest outlook.
Beyond the infrastructure pipeline
Opportunities and chokepoints.