Scaffolding
Scaffolding provides a temporary safe working platform for activities such as:
It is formed from individual tubes and joints or proprietary components.
There are two main types of scaffolding:
- Freestanding scaffolds, such as Independent towers,
- Independent tied scaffolds, such as independent towers tied to an adjacent structure.
NB For more types of scaffold, see Types of scaffolding.
The most common piece of structure used in scaffolding is the scaffold tube (known as a standard). The tube generally comes in two thicknesses, 3.2 mm or 4 mm. The tubes are galvanised due to their exposure to the elements and axial capacity loads are given either ‘as new’ or ‘used.’ Capacities of tubes used in tension are usually limited by the safe slip load capacity of the coupler, which is far lower than the actual tensile resistance of the tube.
Scaffolding is designed for its self-weight, i.e. the weight of the boards, tubes, guardrails, toeboards, etc. and imposed loads such as wind. The imposed load applied to the scaffolding depends on its use.
Four classes of loading are available:
- Service Class 1 - 0.75 kN/m2 – Inspection and very light duty access
- Service Class 2 - 1.50 kN/m2 – Light duty such as painting and cleaning
- Service Class 3 - 2.00 kN/m2 – General building work, brickwork, etc.
- Service Class 4 - 3.00 kN/m2 – Heavy duty such as masonry and heavy cladding
The wind load applied to scaffolding will change depending on whether sheeting or debris nets are used. The magnitude of the wind load will alter the required capacity of the ties and may affect their frequency.
When scaffolding is tied to a building it uses the permanent structure of the building to provide stability. The selection of tie positions should be tested and checked before use and the suitability of the permanent structures composition to carry the ties should be analysed.
Scaffolding is also braced laterally using façade and ledger bracing.
Workmanship and inspection is vital for the erection and dismantling of scaffolding and must be undertaken by competent personal under supervision.
For more information, see Scaffold register.
For information about removing scaffolding, see How to remove scaffolding.
The National Access and Scaffolding Confederation (NASC) has published TG20:21, which provides the definitive guidance for scaffolding constructed with tube and fittings throughout the UK. TG20 comprises four elements; the Operational Guide, the Design Guide, the User Guide and the NASC’s innovative, user-friendly and widely-adopted eGuide software.
Up until March 2021, this bundle came only in the form of three hard copy guides and a digital download, and was titled TG20:13. TG20:13 was formally withdrawn, in favour of fully adopting TG20:21, on October 12 2021. Further information can be found here.
Through TG20:21 the guides and eGuide are now available online, with the improved and expanded software and the associated and updated Operational and Design Guides accessible via the NASC ePortal.
The NASC has five membership categories; Contractor, Supplier, Design, Information and International Information.
[edit] Related articles on Designing Buildings
- Building wraps.
- CDM.
- Debris netting.
- Demolition.
- Facade retention.
- Falsework.
- Formwork.
- Gantry.
- How to remove scaffolding.
- How to use a ladder.
- Putlog holes.
- Roped access for conservation projects.
- Rubble chute.
- Scaffold register.
- Shoring.
- Temporary works.
- Ties.
- Trench support.
- Types of crane.
- Types of scaffolding.
- Work at height.
- Work at height checklist for managers.
- Work at height regulations.
- Working platform.
[edit] External references
- BS5975:2008 + A1: 2001 Code of Practice for Temporary Works Procedures and the Permissible Stress Design of Falsework (BSI 2011).
- The National Access And Scaffolding Confederation (NASC).
- Scaffolding Safety Tips
Featured articles and news
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding.
Types of rapidly renewable content
From forestry to agricultural crops and their by-products.
Terraced houses and the public realm
The discernible difference between the public realm of detached housing and of terraced housing.
Put digitalisation and sustainability at the core of curricula
Project management educators are urged.
Looking back at the influence of climate events
From a designer and writer: 'There are limits to growth but no limits to development'.
Terms, histories, theories and practice.
Biophilic design and natural light
Letting in the light and natural elements into spaces.
APM Programme Management Conference 2024
Strategies for Success.
Residential takes the reins as contract awards even out
Contracts down, but remain above the last quarter of 2023.
Celebrating Eid and the largest mud-brick building.
Barry Kingscote claims prestigious CIOB CMYA Award.
The British Mosque: an architectural and social history
The story of some 1,500 mosques or more in Britain.
Heat pump refrigerants, efficiencies and impacts
R12 to R1270 what are the differences?
Global heat pump market in 2023
Challenging times with positive but modest outlook.
Beyond the infrastructure pipeline
Opportunities and chokepoints.