Preventing unauthorised access to construction sites
The Health and Safety at Work etc Act 1974 requires that employers take reasonable steps to ensure the health and safety of persons other than their employees, which implies a duty to ensure people are safe from activities on construction sites.
In addition, the Construction (Design and Management) Regulations (the CDM Regulations) require the prevention of access to construction sites by unauthorised persons, and that ‘… where necessary in the interests of health and safety, a construction site must, so far as is reasonably practicable, and in accordance with the level of risk posed, comply with either or both of the following; have its perimeter identified by suitable signs and be arranged so that its extent is readily identifiable; or be fenced off.'
The principal contractor must take necessary steps to prevent access by unauthorised persons to the construction site and contractors must not begin work on a construction site unless reasonable steps have been taken to prevent access by unauthorised persons to that site.
Principal contractors should liaise with contractors to define the site boundaries using suitable barriers and take steps to ensure that only those authorised to access the site do so. For projects involving only one contractor, the contractor must do whatever is proportionate to prevent unauthorised access before starting work on the site.
Special consideration will be required for sites that have:
- Rights of way through them.
- Other work areas next to them.
- Occupied houses next to them.
- Children or vulnerable people nearby.
There may also be may be planning conditions attached to a planning permission setting out specific obligations in relation to the site perimeter.
[edit] Related articles on Designing Buildings
Featured articles and news
Not buildings. Happy holiday from DB.
Future Homes Standard: Industry calls for more ambition
As the Government FHS consultation finally closes.
Improving government projects with data and AI
Enabling better outcomes, efficient modern delivery and influential leadership on government projects.
BSRIA Living Laboratory Innovation Challenge
Final days for submission, closing March 29.
Windows, their frames, forms, factors and functions.
The hidden subtleties of U-Value calculations
Different contexts and what to include as variables.
A brief run down with related articles.
Electrical sector calls for safer public EV charge points
Serious concerns about electrical safety in the public domain.
Building Blocks manifesto presented to parliament
Architects Declare call in for support of five critical policies.
The four elements of project management with APM
Analysis, expectations, collaborative communication and partnerships.
City of London launches Heritage Building Retrofit Toolkit
Empowering owners to initiate necessary adaptations.
Guidance on RAAC in listed buildings
Published by Purcell, endorsed by IHBC, SPAB and C20.
Learning from the past.
Reluctance to hire people with criminal convictions revealed
Employing People with Criminal Convictions Report.
Tackling unconscious bias; Women's History Month
Personal reflections, as the last week of March approaches.