CDM 2015 designer duties
The Construction (Design and Management) Regulations (the ‘CDM Regulations’) are intended to ensure that health and safety issues are properly considered during a project’s development so that the risk of harm to those who have to build, use and maintain structures is reduced. They were introduced in 1994 and revised in 2007. A further revision came into force on 6 April 2015.
The 2015 CDM regulations include duties for:
- Clients. (see CDM 2015 client duties)
- Designers.
- Principal designers. (see CDM 2015 principal designer duties)
- Principal contractors. (see CDM 2015 principal contractor duties)
- Contractors. (see CDM 2015 contractor duties)
- Workers. (see CDM 2015 worker duties)
The duties of designers have changed slightly from the 2007 regulations.
Designers are defined in the 2015 CDM Regulations as ‘…an organisation or individual, who prepares or modifies a design for a construction project (including the design of temporary works); or arranges for, or instruct someone else to do so.’
Designs include drawings, design details, specifications, bills of quantity and calculations.
Designers include architects, engineers, quantity surveyors, interior designers, surveyors, technicians or anyone who specifies or alters a design. This can include contractors, principal contractors, specialist contractors, and commercial clients who become actively involved in design. It also includes those who select products for use in construction, and if a product is purpose-built, those who prepare the specification and manufacturers if they develop a detailed design.
Designers must be provided with pre-construction information by the client or by the principal designer where one is required. The principal designer has responsibility for the planning, management, monitoring and co-ordination of health and safety during the pre-construction phase. They are appointed by the client in projects involving more than one contractor. Pre-construction information is information in the client’s possession or information which is reasonably obtainable by or on behalf of the client, which is relevant to the construction work.
The designer’s duties apply as soon as designs are prepared which may be used in construction work, including concept design, competitions, bids for grants, modification of existing designs and relevant work carried out as part of feasibility studies.
The duties of designers include:
- Ensuring they have the necessary skills, knowledge and experience.
- Not commencing work unless they are satisfied that the client is aware of their duties under the regulations.
- Cooperating with others involved with the project or any project on an adjoining site.
- Reporting instances where they or others are working in a way that puts them or anyone else in danger.
- Providing information to other members of the project team to help them fulfil their duties.
- Taking account of the general principles of prevention and the pre-construction information, with the aim of eliminating foreseeable risks. Where this is not possible, taking steps to reduce the risks or control them through the design process, and providing information about the remaining risks to other dutyholders.
- Where it is not possible to eliminate health and safety risks when preparing or modifying designs, designers must ensure appropriate information is included in the health and safety file about the reasonably practicable steps they have taken to reduce or control those risks.
- Agreeing with the principal designer the arrangements for the sharing of information to avoid omissions or duplicated effort.
- Ensuring that any information they provide is easy to understand and provided in good time.
[edit] Related articles on Designing Buildings Wiki
- CDM.
- CDM 2007 designers.
- CDM 2015.
- CDM 2015 draft guidance.
- CDM 2015 client duties.
- CDM 2015 contractor duties.
- CDM 2015 legal considerations.
- CDM 2015 principal contractor duties.
- CDM 2015 principal designer duties.
- CDM 2015 worker duties.
- CDM regulations.
- Designer.
- Health and safety.
- Health and Safety Executive.
- What now for CDM 2015?
Featured articles and news
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding.
Types of rapidly renewable content
From forestry to agricultural crops and their by-products.
Terraced houses and the public realm
The discernible difference between the public realm of detached housing and of terraced housing.