Last edited 31 Aug 2016

Crossrail 2

Crossrail 2 is a proposal for a high-frequency, high-capacity rail line across London, from north to south, into Surrey and Hertfordshire. It is expected to open in the early 2030s.

London is projected to grow by two million people by the early 2030s. Transport for London (TfL) and Network Rail are promoting Crossrail 2 as a key project necessary to support London's long-term growth. It replaces an earlier scheme known as the Chelsea-Hackney line.

TfL suggest that Crossrail 2 will:

  • Help reduce congestion on busy routes into central London, relieving crowding on the Victoria, Piccadilly and Northern lines, and National Rail services into Waterloo and Liverpool Street.
  • Support economic development, in particular in the Upper Lea Valley, Victoria and King’s Cross.
  • Create better connections across London and a new Euston St Pancras station providing direct access to the new High Speed 2 line, Thameslink and Eurostar services.
  • Encourage people to make 'greener' journeys.
  • Add substantial capacity to London’s rail network.
  • Provide new, more direct, faster and less crowded journeys.

The projected cost is £12-20bn at 2012 prices. It is expected to be funded in a similar way to Crossrail 1, from sources including; Transport for London, the Greater London Authority (GLA), Network Rail, the Department for Transport and private sources with London businesses contributing in the form of the Crossrail Business Rate Supplement and the property industry contributing through the Community Infrastructure Levy.

In 2009 TfL undertook a review of the need for a new rail line and concluded that there was a need for a new north east – south west line. A large number of options were assessed, two of which were selected for further development:

  • The 'metro option' proposed an underground railway between Wimbledon and Alexandra Palace.
  • The 'regional option' combined underground and overground railway, operating from Alexandra Palace and Hertfordshire to various locations in south west London and Surrey.

A 2013 consultation found strong support for the idea of Crossrail 2 and suggested greater support for a Regional option:

  • It would serve a wider population including regions outside London.
  • It would enable people to relocate to more affordable areas but continue working in London.
  • It would be more effective in alleviating overcrowding as it reduces the need to interchange in central London.

A subsequent consultation in 2014 focused on three specific areas of the route:

  • The location of a station in Chelsea.
  • An extension from Alexandra Palace to New Southgate.
  • The route alignment in Dalston and Hackney.

A preferred route was identified by the Mayor of London Boris Johnson in October 2018.

Crossrail Regional Route.jpg

Boris Johnson, said: “Crossrail 2 is a vital project not just for the capital, but also for the regions from which people travel in to London on packed trains each day of the week. With London’s population soon to surpass its previous 1939 peak of 8.6m, and with more people travelling by Tube and rail than ever before, we need additional rail capacity to support future growth.” Ref GLA Crossrail 2 vital to support London’s growth, says Mayor 28 October 2014.

The proposed next steps are:

  • 2014: Protect a preferred route from development by ‘safeguarding’.
  • 2014-15: Planning work on the preferred option.
  • Late 2015: Undertake a public consultation on the preferred option.
  • 2016-19: Detailed design, further consultation and application for planning powers.
  • 2020-2030: Construct and test Crossrail 2.
  • Early 2030s: Crossrail 2 opens to the public.

In January 2016, Surrey County Council suggested the line should extend as far as Woking and Dorking, whilst Hackney Council demanded a rethink over the station in Dalston.

On 10 March 2016, the National Infrastructure Commission published a report 'Transport for a world city' in which it suggested Crossrail 2 should be taken forward as a priority, funded to develop the scheme fully with the aim of submitting a hybrid bill by autumn 2019. This would enable Crossrail 2 to open in 2033.

In May 2015, it was announced that Lord Adonis, chair of the National Infrastructure Commission had been appointed chair of Crossrail 2.